Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Behaviour Of Model Pile Group Under Axial Monotonic LoadingBy A. Le Kouby
We present in this paper the results of a parametric study carried out in a calibration chamber on instrumented model piles. The aim is to point out group effect on piles within a group through their
Jan 1, 2006
-
Time Effect Of Bearing Behavior Of Bored Pile Group In Un-Saturated Silty Soil ? SynopsisBy J. L. Liu
Long-term maintained load test on the bored pile group in unsaturated silty soil has been carried out. And the research on the time effects of bearing behavior of pile group has been done by the metho
Jan 1, 2010
-
Experiences From A Large Scale Driven Precast Piling Project In IndiaBy Rajesh A. Vaidya
A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere
Jan 1, 2007
-
Sustainability and the Future for the Deep Foundations IndustryBy Tony Suckling
"As we head toward the United Nations Climate Change Conference in Copenhagen in December, the environment and sustainability will become headline news for a while. Governments are expected to agree t
Jan 1, 2009
-
Capacity Prediction Vs. Performance Of Driven Pre-Cast Pre-Stressed Concrete Piles In Chesapeake, VirginiaBy Emad Farouz
This paper compares the predicted axial capacity of driven Pre-cast Pre-stressed Concrete (PPC) piles for the Lake Gaston Water Treatment Plant (LGWTP) using several design methodologies versus the ax
Jan 1, 2007
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention SystemsBy J. Erik Loehr, Andrew Z. Boeckmann
"Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad
Jan 1, 2016
-
Session 14 "Deep Mixing Method III"By Stefan Dahlin
The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation
Feb 10, 2003
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of PilesBy Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Tension Testing of the Grouted Anchorage Assembly for Multistrand AnchorsBy Lucian L. Bogdan
"SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the
Jan 1, 2005
-
Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast PilesBy F. M. Abdrabbo
Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr
Jan 1, 1993
-
Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big DigBy Paul Pedini
The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth
Jan 1, 2002
-
Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, NevadaBy Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak
"The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.
Jan 1, 2017
-
Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case StudiesBy Daniel Ruffing, Charlie Krug
In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher
-
Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, MissouriBy Adrian M. Keller
Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer
Jan 1, 2010
-
Army Corps Megaprojects: The Benefits of Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This article focuses on lessons learned from innovative designs including in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers (USACE)
Jan 1, 2016
-
Methods Of Dewatering And Ground Water Control ? SynopsisBy J. P. Powers
Methods for dewatering and the control of ground water for construction and mining are discussed, including open pumping; predrainage with deep wells, wellpoints or other systems; cutoff or exclusion
Jan 1, 2010
-
Composite Foundations For Uplift And Compression In Soft Soils And Swampy Terrain ? SynopsisBy H. S. Radhakrishna
Foundations supporting power transmission and communications towers are subjected to both compression and uplift loads, often of a cyclic nature. Some novel foundations, combining the beneficial featu
Jan 1, 2010
-
Use of Post-Grouted Drilled Shafts in Coastal MississippiBy Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015
-
Micro-Pile Foundations in Difficult Subsurface ConditionsBy D. Dreher Whetstone, Paul M. Blakita, Christopher M. Reith, Ravi P. Malviya
"Micro-piles are small diameter (5 to 10 inches), cast-in-place piles which can develop high load capacities by bonding with soil or rock. Micro-piles are particularly well-suited for moderate to heav
Jan 1, 2005