Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, Canada
By Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Alternative Deep Foundation Solutions – DMM at LPV-111 in New Orleans
By Peter Cali, Wesley Schmutzler
"The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
Jan 1, 2017
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage Tunnel
By Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)
By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San Francisco
By Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
2023 OPA Winner: Climate Pledge Arena
By Meeok Kim, Thornton Tomasetti, Seth Knihtila, Michael Oakland, Shawn Leary
The transformation of Seattle's historic KeyArena into the state-of-the-art Climate Pledge Arena, home to the NHL's Seattle Kraken, was no small feat. The $930-million renovation and expansion require
Sep 1, 2023
-
A Fully Connected Jobsite is a Must for the Future
By Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
Fogg Museum Expansion - Support of Excavation Design and Construction
By James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)
By Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2015
-
Founded on Creativity North Dakota’s Four Bears Bridge
By Terrence R. Udland, Russell D. Call
"Honored with a DFI 2006 Special Recognition Award, the Four Bears Bridge was constructed across Lake Sakakawea and opened to traffi c in September 2005. The very large lake size and severe winter con
Jan 1, 2007
-
Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?
By John L. White
The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi
Jan 1, 1990
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)
By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved Clay
By Carl Ealy
Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m
Jan 1, 2002
-
Advancing Severe Flood-Related Engineering Knowledge
By Anne Lemnitzer
When a major storm system stalled over Western Europe last summer, it pro- duced the deadliest flood on European territory in the last two decades. Beyond record-setting rainfall over countries such
Feb 1, 2022
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method
By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)
By Ed Revoort, Robert Schippers
In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h
May 1, 2022
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction
By David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
Theoretical Ultimate Lateral Resistance near the Soil Surface in Unsaturated Cohesionless Soils
By Oladayo O. Komolafe and Majid Ghayoomi
p-y curves have been used over the years to determine the lateral resistance of piles. This method is popular among practicing engineers due to its simplicity and its ability to determine the slope,
Sep 8, 2021
-
Permanent Soil Nail Earth Retention System, Stanley Hall Replacement Project, UC Berkeley
By Pirooz Barar
The new Stanley Hall building will house the center for bio-engineering and technology research for the UC Berkeley campus. The structure is located at the northeast part of campus, adjacent to Donne
Jan 1, 2004