    A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In Kolkata

    By Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin

    This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1

    Sep 1, 2022

  • DFI
    Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In Practice

    By Bartho J. Admiraal, Antoine Feddema

    Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below

    May 1, 2022

  • DFI
    Modelling The Behaviour Of Pile Groups With Favourable Group Efficiencies

    By A. V. Rose

    A redevelopment in the City of London has been constructed with a piled foundation system that is believed to be the first of its kind. The purpose of the research is to explore this novel foundation

    Jan 1, 2011

  • DFI
    Pile Foundation Response to Ground Vibration from Rock Blasting

    By Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui

    "Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign

    Jan 1, 1900

  • DFI
    Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure

    By D. Barber, A. D. Miller, P. A. Bray

    The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx

    Jan 1, 2017

  • DFI
    As-Built Analysis - An Integral Part Of Pile Foundation Design

    By Dan Yang

    Pile foundation designs are performed routinely based on geotechnical information available at the time of design, often with due consideration of large uncertainties inherent to soils and site condit

    Jan 1, 2010

  • DFI
    Sunrise Powerlink: An Innovation in Foundation Design

    By Steve Davidow, Nick Salisbury

    "The Sunrise Powerlink project received numerous industry awards for excellence. The DFI C. William Bermingham Innovation Award recognized the innovative use of prefabricated steel micropile caps to i

    Jan 1, 2014

  • DFI
    Real-Time Anchor Testing and Data Management

    By Bora Okumusoglu, Devon K. V. Mothersille

    "AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front

    Jan 1, 2017

  • DFI
    Investigating Reinforcing Effects of Soil-Cement Columns in Liquefiable Sand Using Dynamic Centrifuge Tests

    By C. Guney Olgun, Mohammad Khosravi, Daniel W. Wilson, Deepak Rayamajhi, Scott A. Ashford, Shuji Tamura, Ross W. Boulanger

    "Dynamic centrifuge tests were performed on unimproved and improved soil with soil-cement column models. The reinforcing effect of isolated soil-cement columns for reducing liquefaction potential and

    Jan 1, 2015

  • DFI
    S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above

    By Grischa Dette, Thomas Schröder, Holger Merski

    For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b

    May 1, 2022

  • DFI
    Urban High Capacity Deep Foundation Solutions in Sites with Complex History and Geology

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t

    Jan 1, 2019

  • DFI
    Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole Inspection

    By Sastry Putcha, Santosh Mummaneni, Avasarala Swamy

    "Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that

    Jan 1, 1900

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Excavation-Induced Movement of Adjacent Foundations

    By Hugo Meggitt, Damian R. Siebert, Wystan Carswell

    Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras

    Jan 1, 2019

  • DFI
    Sustainability Assessment of Deep Foundations: Case Study

    By Krishna R. Reddy, Jyoti K. Chetri, Girish Kumar

    Geotechnical engineering encompasses a major portion of the civil and infrastructure projects. The large amounts of energy and resources typically used in these projects leads to undesirable emissions

    Jan 1, 2019

  • DFI
    Value-Engineering of H-Pile Foundations in Karstic Geology

    By Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman

    "A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert

    Jan 1, 2016

  • DFI
    Jet Grout Underpinning to Support the Waterman Hospital

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t

    Jan 1, 2019

  • DFI
    Cast Insitu Piling For The King's Wharf Project, Sydney, Australia

    By Slav Tchepak

    The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin

    Jan 1, 2000

  • DFI
    A Digital Twin For Deep Vibro Ground Improvement

    By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter

    This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit

    May 1, 2022

  • DFI
    The Potential Impacts Of Questionable Instrumenation Data

    By Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson

    This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t