Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    Raw Water Supply: The Experience of Cerro Verde

    By Ken Wood

    "A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai

    Jan 1, 2008

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    Gold "Preg-Robbing" by Pyrite: Natural and Process Induced

    By Stephen L. Chryssoulis

    """Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l

    Jan 1, 1997

  • CIM
    Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines Limited

    By G. Halverson, K. Blower

    "Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per

    Jan 1, 1987

  • CIM
    Column Flotation Operation at Mines Gaspé Molybdenum Circuit

    By V. Coffin, T. Cienski

    "(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air

    Jan 1, 1981

  • CIM
    Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processing

    By M. J. Michaud, M. J. Lavigne

    "A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o

    Jan 1, 2003

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • CIM
    Concentrator Operations at Whitehorse Copper Mines Limited

    By D. Linzey

    "History of Whitehorse Copper BeltThe first discovery of copper on the Whitehorse Copper Belt is reported to have been made by miners on their way to the Klondike in 1897. By 1899 the district had bee

    Jan 1, 1977

  • CIM
    Design Considerations for Mine Waste Management at the Meadowbank Gold Project

    By Cameron J. Clayton

    Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec

    May 1, 2004

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976

  • CIM
    Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology

    By S. Pinard, J. MacLellan, G. Ehlert

    "The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin

    Jan 1, 1992

  • CIM
    Decommissioning Pits with Ecological Engineering

    By M. Kalin

    "Ecological Engineering, a biotechnological approach to the decommissioning of base metal mining wastes, is being tested on two pits (Gloryholes) in Newfoundland, Canada. Pit #2 has an average pH of 3

    Jan 1, 1992

  • CIM
    Visualization of Fine Bubbles and Their Role in Fine Particle Flotation

    By Wei Sun, Jaewon Choung, Zhenghe Xu, Zhangming Cui

    "High intensity conditioning has been demonstrated in a number of cases to enhance fine particle flotation. The improvement could be attributed to the enhanced formation of particle aggregates. Howeve

    Jan 1, 2006

  • CIM
    The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora North

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss

    Jan 1, 2013

  • CIM
    Expert System Technology at the Polaris Mine

    By G. A. Kosick, C. A. Harris

    "Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr

    Jan 1, 1988

  • CIM
    Aeration in Plant Practice

    By K. V. Konigsmann

    "The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m

    Jan 1, 1973

  • CIM
    Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)

    By P. G. Roden, G. A. Maki, P. J. Fullmann

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1986

  • CIM
    Automated Real-Time Elementary Analysis of Drill Dust using LIBS Technology

    By Karl Nienhaus

    The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo

    Oct 1, 2009