Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine
By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari
"At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close
Jan 1, 2002
-
A fresh approach to mine organization and incentive planning based on experience at Campbell Chibougamau Mines Ltd. (now Campbell Resources Inc.)
By J. G. Strasser
"There has been considerable output over the last three decades from the social sciences concerning man and his working environment. In the mining industry at large, however, authoritarian, hierarchic
Jan 1, 1981
-
Ore Handling for the McArthur River and Cigar Lake Projects
By Chuck Edwards
"The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec
Jan 1, 1997
-
The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of Uranium
By Chris Fleming, John R. Goode, James Brown
"Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m
Jan 1, 2010
-
Chemical Additives for Improving the Wet Grinding of Ores
By R. Samuels, R. Klimpel
"IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou
Jan 1, 1979
-
Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine
By D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh Mine
The uphole bench extraction strategy at EKJV Management Pty Ltd?s Raleigh Mine, requires simultaneous horizontal and vertical exposure of paste filled stopes. In order to prevent excessive ore dilutio
May 1, 2007
-
The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning
By Art Carino
"The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj
Jan 1, 2001
-
Climate Change: Risks and Opportunities for Mining and Exploration Companies
By Barbara Hendrickson
Outline ? Canadian Regulatory Update ? Turning the Corner: Background & Status ? Implications of U.S. Waxman-Markey bill for Canada ? Federal-provincial considerations ? Current certainties and
May 1, 2009
-
Computerized cost estimating for underground mines
By J. B. Scott
"A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and
Jan 1, 1988
-
Optimization and Increasing Throughput at Jacobina
By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration Process
The construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent
Jan 1, 1979
-
A Method to Assess Size Reduction by Grinding
By Daniel Hodouin, Claude Bazin
"A graphical method to assess the size reduction by grinding is presented and illustrated with data collected from laboratory grinding tests and industrial grinding circuits. The method lies between t
Jan 1, 2004
-
Advancing Sudbury Exploration with 3D Modelling
By D. Richardson
Presentation Objectives ?Demonstrate the utility of 3D modelling for visualizing exploration data ?Demonstrate the target generation ability of 3D model query methods Exploration Criteria -Example
May 1, 2006
-
New Mill Design for Large Grinding Mills
By Kjell Winther
"Hydralift Scanmec introduced early in the eighties a new and different mill design for very large grinding mills. The design described has actually no size limitation upwards and is so far suggested
Jan 1, 1995
-
Continuous loading and conveying technology in mining
By Dale Lens, W. S. (Wayne) Cusitar
"The use of continuous loading and conveying technology for mining is currently practiced in relatively few mining environments and, even in these cases, on a non-exclusive basis. For the most part, a
Jan 1, 1987
-
Gravity Concentration of Gold from Base Metal Flotation Mills
By M. Ounpuu
"Gold, because of low head grade and recovery, is usually of minor importance in the economics of base metal flotation mills. Because of the above little metallurgical attention is usually provided to
Jan 1, 1992
-
Circuit Modifications at Westmin Resources Myra Falls Operations
By C. Veloo
"Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.
Jan 1, 1992
-
Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process
By Yannis Faitakis, Simon Bergeron
"This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B
Jan 1, 2003
-
Gestion De Résidus Miniers Stabilisés Par Ajout De Chaux Et De Ciment Chez Zinc Électrolytique Du Canada À Valleyfield, Québec
By Benoît Demers
Dans ses opérations de traitement de concentré de zinc, l?usine de Zinc Électrolytique du Canada à Valleyfield génère un résidu minier appelé « jarosite ». Jusqu?en 1998, le jarosite était transporté
Nov 1, 2002