Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Oxygen Meter at MacLeod Cockshutt Gold Mines Ltd.

    By W. A. Grell

    "The oxygen meter has been in use at MacLeod Cockshutt Gold Mines for over a year, At MacLeod about 200 tons per day of reground concentrate containing roughly 10% pyrrhotite and 20% pyrite is cyanide

    Jan 1, 1964

  • CIM
    Mirgation and Expansion of Deep Ground Dense Gas for Cause of Large Rock Avalanches

    By Z. Q. Yue

    Many large rock avalanches and/or landslides have occurred in mountainous regions around the world. Their occurrences are normally rapid and unexpected, which can cause disasters. They have been inves

    Jan 1, 2015

  • CIM
    Technological Aspects of Recovery of Precious Metals from Carbonaceous Ores

    By Tatyana Alexandrova

    The problem of processing refractory (rebellious) gold ores is important for all the countries involved in recovering precious metals from ores. Technological aspects of processing precious metal ores

    Jan 1, 2016

  • CIM
    Effect of Synthesis Conditions on Particle Shape of Scorodite

    "An atmospheric process for the synthesis of scorodite(DMSP®)has beendeveloped,in which ferrous ions were oxidized by oxygen gas in the presence of pentavalent arsenic ions. Under optimum conditions,

    Jan 1, 2016

  • CIM
    Trends in Bulk Handling of Reagents at Brunswick Mining and Smelting

    By R. T. Erskine

    "IntroductionIn this paper it will not be possible to cover all details of the reagent systems at Brunswick Mining and Smelting but it is hoped that a description of the evolution of these systems wil

    Jan 1, 1970

  • CIM
    How to Identify the Critical Stakeholders in an Interface Management System?

    By S. Shokri

    The increasing size and complexity of mega construction projects result in having several geographically distributed stakeholders, collaborating with each other to successfully deliver the project. El

    Aug 1, 2013

  • CIM
    Development and Improvement of Submerged Lance Converting and Refining Furnace of Fangyuan Two-Step Process

    By Haibin Wang, Zhiwei Huang, Zhixiang Cui, Wenzhao Cui, Zhi Wang

    Fangyuan Two-Step copper smelting process was commercialized in October, 2015 and has been operating for 3 years and 5 months. As the unique continuous copper smelting process with simplified flow in

    Jan 1, 2019

  • CIM
    Geology and Mineral Developments of Cariboo District, British Columbia

    By W. E. Cockfield

    THE object of this paper is to review recent geological work in the Cariboo district and to present notes on the recent development of mineral properties. The Geological Survey has done considerable

    Jan 1, 1937

  • CIM
    Construction of Sherritt's Concentrators

    By J. A. MacLellan

    "CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design

    Jan 1, 1972

  • CIM
    Nor-Acme Mine

    By Nelson Hogg

    "THE NOR-ACME gold mine is located close to the north shore of Snow Lake, at 54°53' north latitude and 100°03' west longitude. It is about 75 air miles east of Flin Flon, and 36 miles by road from Wek

    Jan 1, 1949

  • CIM
    Simulation of Drop-Weight Impact on Woven Composite Laminates

    By A. Gakwaya, P. Vachon-Joannette, P. Gagnon, J. Lévesque

    "Predictive numerical methods are essential tools for reduced development cost and improved high performance designs of modern aircrafts. Their use leads to savings in terms of design cycle time and e

    Jan 1, 2016

  • CIM
    Chesterville Mine

    By R. B. Allen, B. S. W. Buffam

    "The property of Chesterville Mines, Limited, is in McGarry township, Timiskaming district, Ontario, about 25 miles east of Kirkland Lake. It consists of a group of fifteen claims that extend northeas

    Jan 1, 1954

  • CIM
    Innovative Techniques Employed to Construct Slurry Cutoff Trench for Syncrude's Beaver Creek Dam

    By Michael T. G. Brown

    Syncrude Canada Ltd. has recently completed construction of its ambitious tar-sand mining and processing facilities at Mildred Lake, Alberta. The Syncrude site is approximately 48 km (30 miles) north

    Jan 1, 1979

  • CIM
    Pillar Optimization ? Post-Pillar Cut and Fill Mining in a shallow dipping Ni Sulfide deposit in Northern Manitoba, Canada

    By Angela L. Paveley

    Economic viability of base metal mining is complicated by a volatile market that can cause fluctuations in the growth and stability of the mining industry. Nickel is mined primarily for use in manufac

    Nov 1, 2011

  • CIM
    Reduction of Acidity in Effluent from Pyritic Waste Rock Using Natural Phosphate Rock

    By A. Fyson, M. P. Smith, Margarete Kalin

    "Drums containing 0.07 m3 of pyritic waste rock from a zinc/copper mine, with and without Natural Phosphate Rock (NPR) additions (40 kg/t waste rock) were set up outdoors. The effluent chemistry has b

    Jan 1, 1995

  • CIM
    Reconstruction as Regards Base-Metals

    By E. A. Collins

    I TAKE it that the papers presented tonight on the subject of Reconstruction, as regards both gold and base-metals, are intended primarily to stimulate discussion of this important subject and, in reg

    Jan 1, 1943

  • CIM
    Petroleum and Natural Gas

    By Unkown

    The Province-wide road ban on movement of heavy loads has had the effect of curtailing or stopping development in several areas. In the Leduc area, the discovery well has been restricted in flow to on

    Jan 1, 1947

  • CIM
    Keymet Mine

    By A. L. MacAllister

    "Keymet Mine lies on the Elmtree River 4 miles west of Petit Rocher and about 18 miles northwest of Bathurst, Gloucester County, New Brunswick. A good gravel road runs through the property.The deposit

    Jan 1, 1949

  • CIM
    Sä Dena Hes Joint Venture Concentrator Operation

    By I. Orford, V. Rozon

    "The Sä Dena Hes Joint Venture Mill was designed to process 450,000 tonnes per year of ore grading 11.3% lead and 13.2% zinc.Run of mine ore is crushed in a jaw crusher and then ground in a closed cir

    Jan 1, 1993

  • CIM
    The Engineering Department of the Hudson Bay Mining and Smelting Company, Limited

    By J. A. Haskin

    The Engineering Department at Flin Flon has the following responsibilities: 1. Underground Surveying. 2. Open-Pit Surveying and Supervision of Blasting. 3. Mine Geology and Examination of Prospects

    Jan 1, 1935