Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)

    By K. Meyer, M. E. Goddfellow

    "At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm

    Jan 1, 1991

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • CIM
    Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility

    By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke

    "The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • CIM
    Environmental Factors Related to the Development of a New Uranium Refinery

    By J. P. Jarrell

    Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus

    Jan 1, 1979

  • CIM
    How Should Mining Companies Select the Optimal Portfolio of Production Projects Considering the Risk of their NPV

    By Júlio C. Lúcio

    Consider the case of a mining company with N investment opportunities in projects of different commodities. The problem is: since the company has limitation of capital, equipments, technical staffs, e

    May 1, 2009

  • CIM
    Using the SUPASIM Flotation Model to Diagnose and Understand Flotation Behavior from Laboratory through to Plant

    By M. P. Hay

    "For a model to be successful it must address the concerns and needs of a target audience. Further, the model must demonstrate the same patterns of behaviour as the real system, and need only be compl

    Jan 1, 2005

  • CIM
    Prospects for the Canadian uranium industry

    By O. J. C. Runnalls

    "Canada became the world's largest uranium producer in 1984. That leadership position is likely to be maintained for many years into the future because of a firm production base, many undeveloped

    Jan 1, 1988

  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Cultivator shank manufacture and evaluation

    By R. W. Pugh, D. G. Bellow

    "This paper will describe how cultivator shanks are made in one company and how the manufacturing was studied with a view to increasing product consistency and reducing manufacturing cost. The product

    Jan 1, 1982

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • CIM
    Growth through Continuous Improvement - Heap Leach Processing and Gravity Expansion at Fort Knox Gold Mine

    By James L. Oleson, Hunter R. Propsom, Kevan J. R. Ford, Robert D. Henderson, Bob Musgrove

    "Kinross’ Fort Knox Gold mine, near Fairbanks, Alaska has successfully implemented two major metallurgical continuous improvement projects resulting in growth of gold production and an extension of mi

    Jan 1, 2011

  • CIM
    Collaborative/Syndicated Research in Mineral Processing

    By Terry Braden

    "Meeting probable world mineral demand in the years ahead will almost certainly require an ability to economically treat lower grade and more complex ores. Achieving this will require extensive resear

    Jan 1, 2009

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    Gold Milling an Area Concept

    By G. H. Hope

    "Pamour Porcupine Mines of Timmins, Ontario operates two 3,000 ton per day concentrators which receive ore from eight to ten mines in the area. The area milling concept was adopted by Pamour in 1971 a

    Jan 1, 1981

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation Method

    By G. Zhu

    The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist

    May 1, 2008

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Adaptive control in mineral processing

    By K. Najim, D. Hodouin

    "The raw ores which are processed in mineral processing plants exhibit very strong variations of their physical and chemical properties. As a consequence, the performances of the comminution and separ

    Jan 1, 1992