Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Refining of platinum-group metals

    By G. P. Demopoulos

    "The recovery and separation of platinum-group metals (PGM) from primary and secondary materials currently attracts a lot of interest due to the high value of the metals and their increasing demand fo

    Jan 1, 1989

  • CIM
    Integration of Mine Automation Systems

    By Irving Wigden

    The world is fast becoming information based. Mine companies migrate business infrastructures to be handled electronically. Suppliers move onto the worldwide web. In this ?e-world? successful supplier

    May 1, 2002

  • CIM
    Maintenance planning and material management systems in productivity improvement in large mining operations

    By S. Srinivasan, R. Coté

    "India is undergoing a massive electrification program using local coal to provide fuel for thermal generating plants. The Rajmahal mine in northern Bihar is scheduled to produce coal at the rate of 1

    Jan 1, 1991

  • CIM
    Undergronnd ore handling and hoisting system at the Williams Mine

    By Henry Smith, Stu Brown

    "The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac

    Jan 1, 1991

  • CIM
    Choice of mine-mill capacities and production schedules using open-ended dynamic programming

    By Jorgen Elbrond, Yve Lizotte

    "A mine evaluation method based on the use of a computer program that models mining with an open-ended dynamic program is presented in this paper. It is demonstrated with an example how the method is

    Jan 1, 1982

  • CIM
    Evaluation of Copper Losses Using Flow Patterns in the Cl-Furnace of the Mitsubishi Process

    By H. Sakurai, M. Kato, F. Tanaka

    The Mitsubishi Continuous Copper Smelting/Converting Process employs an electric furnace (CL- furnace) for settling the slag/matte mixture formed in the smelting furnace. The conditions in the CL- fur

    Jan 1, 2019

  • CIM
    Matching mining methods to complex coal geology

    By B. J. Morash

    "The six mineable coal seams at Quintette Coal Limited (QCL) vary in thickness from 0.75 m to 9.5 m and include waste partings varying from 0.2 m to 4 m thick. They are highly faulted and folded in so

    Jan 1, 1988

  • CIM
    Evaluation of design bond strength for fully grouted cables

    By A. J. Hyett, R. D. Reichert

    "A laboratory and field research program was conducted to investigate the major factors influencing bond capacity of grouted cable bolts. The results indicate that cable bolt capacity most critically

    Jan 1, 1992

  • CIM
    Management of Socio-Economic Impact Analysis for Resource Development

    By William E. Stanley

    The paper examines the problems that arise in undertaking socio-economic impact studies to meet the requirements of environmental-impact legislation governing new mine development or expansion. An app

    Jan 1, 1979

  • CIM
    Geology of the Sustut Copper Deposit In B.C.

    By G. Harper

    The Sustut Copper deposit, 230 miles northwest of Prince George, B.C., was discovered in August of 1971. Subsequent exploration has included 56,417 feet of surface diamond drilling in 139 holes. The d

    Jan 1, 1977

  • CIM
    Quartz sand and kaolinite clay of the James Bay Lowlands, Ontario

    By M. A. Vos

    "Cretaceous sands and clays underlie an area of approximately 5,000 km2 in Northern Ontario, southwest of James Bay. The deltaic deposits occur as a wedge of continental sediments to the north of an e

    Jan 1, 1982

  • CIM
    High-speed tracked drifting and materials handling

    By Julian Baldry

    "This paper begins by describing the parameters of high-speed underground tracked drifting operations and the mucking cycle, and-discusses their variations. The railbound Haggloader 8HR is then descri

    Jan 1, 1981

  • CIM
    Rapid graphical analysis of rock slopes

    By D. M. Cruden

    "When two discontinuities form a tetrahedral wedge in a rock slope, a factor of safety for the wedge can be simply calculated (if motion is driven only by gravity and resisted only by friction) from p

    Jan 1, 1990

  • CIM
    Development of the Saskatchewan Potash Mines

    By Vern Evans

    Saskatchewan has historically been recognized for farming, but in 1943 while drilling for oil, potash was discovered. The initial attempt to gain access to the potash beds was unsuccessful, however, s

    May 1, 2011

  • CIM
    Feasibility analysis of methanol fueled SOFC systems for remote distributed power applications

    By M. Staite

    This paper analyzed the feasibility of converting a 5kW natural gas SOFC power generator system designed to operate on natural gas to be fuelled by methanol. The analysis included laboratory methanol

    Jan 1, 2005

  • CIM
    Volcanological Reconstruction of the Corbet Breccia Pile, and Cu-Zn Massive Sulfide Deposit, Noranda, Quebec (4e04e1fb-2588-4997-8220-6f15481d7d28)

    By M. Labrie, H. L. Gibson, G. Doiron, J. J. Watkins, D. H. Watkinson

    The Corbet deposit is one of 17 proximal Cu-Zn massive sulfide deposits located. within the Noranda Cauldron which occurs within the core of the Noranda Volcanic Complex. The deposit is located at the

    Jan 1, 1993

  • CIM
    Building Aboriginal Relationships to Achieve Project Success

    Presentation Overview ?? Project Setting ? Project Context ? Challenges ?? Managing Commitments ?? Project Update ?? Maximizing Aboriginal Economic Participation in Resource Development P

    May 1, 2004

  • CIM
    Back-analysis of the Extreme Squeezing Conditions in the Exploratory Adit to the Lyon-Turin Base Tunnel

    By G. Russo

    During the construction of the S.Martin La Porte access adit, 9m in diameter, extreme squeezing conditions occurred while crossing Carboniferous schistose formations, with diametric convergence up to

    May 1, 2009

  • CIM
    Ore reserve estimation at the Enterprise Gold Mine, Pine Creek, Northern Territory, Australia. Part 2: the multigaussian kriging model

    By Neil Schofield

    "The estimation of recoverable ore reserves for feasibility in precious metal deposits such as Pine Creek must account not only f or the extreme variability of the ore grade but also for the complexit

    Jan 1, 1988

  • CIM
    Hydrometallurgical design projects for educational purposes

    By J. W. Smith, J. G. Eacott, D. H. Napier

    "Three hydrometallurgicat processes (Noranda chloride leach, B. C. Research biological leach and Sherritt-Cominco activated oxygen leach) and the Noranda pyrometallurgical process have served as the b

    Jan 1, 1986