Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Factors affecting the leaching of radium-226 from barium-radium sulphate sludges

    By P. M. Huck, R. John

    "The National Uranium Tailings Program was established in 1982 to develop, in part, a mathematical predictive model which would allow the assessment of the impact of uranium mill tailings on the envir

    Jan 1, 1989

  • CIM
    Measurement of electrochemical potentials in flotation systems

    By J. A. Finch, G. Labonté

    "A long-standing objective has been to obtain interpretable measurements of the oxidation-reduction potential in mineral slurries. For this purpose several sensing electrodes (black platinum wire, pla

    Jan 1, 1988

  • CIM
    Noranda Inc. Brunswick Mine ?A Decade of Advances ?

    Concentrator Improvements -1990-1995Back to Basics ?pilot plant versus plant opportunities identified ?understand process fundamentals & baseline -1996-2000Point ?C?Projects ?strategy to improve

    May 1, 2002

  • CIM
    Recovery of REE from an Apatite Concentrate

    By S. Ghafarnejad Parto, Å. Rasmuson, A. Fredriksson, M. Mohammadi, K. M. Forsberg, J. Martinez De La Cruz

    The present study aims at recovering rare earth elements (REE) in conjunction with the production of fertilizers from an apatite concentrate. Apatite is one of the REE rich minerals ending up in the t

    Jan 1, 2014

  • CIM
    Paleo-geomorphology in the exploration for undiscovered sandstone-lead deposits, Salmon River Basin, Nova Scotia

    By P .. D. Vaillancourt, D. F. Sangster

    Several occurrences of disseminated galena, including a former producing mine, are found in Pennsylvanian fluviatile sandstone of the Salmon River Basin, Cape Breton Island, Nova Scotia. Detailed stud

    Jan 1, 1990

  • CIM
    New heat transfer fluid improves performance in anode paste plant

    By S. C. Cohen, A. F. Mikkelsen

    "This paper describes the improvements made to the operation of a liquid phase, 300°C, heat transfer system in the paste plant of an aluminum smelter. These improvements were achieved by replacing the

    Jan 1, 1993

  • CIM
    Historical and Present Day Metallurgical Development of the Strange Lake Alkalic Complex

    By I. S. Zajac, Y. O. Oyediran, M. C. Robart

    This paper presents an overview of the metallurgical work on the Strange Lake Alkalic Complex (SLAC), from historical development of the "Main Zone" to present day develoment of the "B Zone". The SLAC

    Jan 1, 2014

  • CIM
    Arsenic’s Behaviour and Benefits in Copper Electrorefining

    By Michael S. Moats, Addin Pranowo, Gerardo R. F. Alvear F., Nigel Aslin

    The toxicity of arsenic is well known and documented. However, the presence of arsenic in copper electrorefining anodes and electrolyte is critically necessary to produce high quality cathode. Arsenic

    Jan 1, 2014

  • CIM
    Decontamination of Elliot Lake Uranium Tailings

    By D. Raicevic

    After more than 93% of the uranium is extracted from Elliot Lake uranium ores by a sulphuric acid leaching process, the leach residue (tailings) contains small amounts of uranium and radioactive isoto

    Jan 1, 1979

  • CIM
    Ecological Engineering in a Mining Context: Past Progress-Future Promise

    By Margarete Kalin

    Mine Waste Management ?Reduction of Sulphideoxidation or inhibiting weathering of rocks Geologist - broken or ground rocks Hydrologist - sources of contaminants Mining engineer - waste sites C

    May 1, 2013

  • CIM
    Working within metallurgical limitations in the successful repair welding of power-plant components

    By D. Mills, W. H. S. Lawson

    "The need to make repairs is seldom a major consideration in the design, fabrication and installation of major components of electrical generation plants. Repair welding, however, is a fact of life in

    Jan 1, 1981

  • CIM
    Automatic haulage truck-design, development and mine implementation at Inco Limited

    By G. R. Baiden

    "An Automatic Haulage Truck (AHT) has been developed for manless tramming of run-of-mine material in an operating mine. The AHT has a 70-ton capacity and uses an electric trolley system in combination

    Jan 1, 1992

  • CIM
    Environment and the law

    By Matthew S. Bingham, David H. Searle

    "One of the most significant developments in environmental law has been the development of mandatory project review processes, at both the federal and provincial levels.FederalWhile, in the past, proj

    Jan 1, 1991

  • CIM
    Gold deposits estimation using indicator kriging

    By N. E. Chaouai, M. Lavigne

    "Indicator kriging is one of the non-parametric geostatistical techniques, ideal for estimating the reserves of irregular mineralizations (e.g. gold, uranium, platinum, diamonds, etc.). Such mineraliz

    Jan 1, 1990

  • CIM
    Models of time and value representation, interest conventions and inflation in project evaluation

    By M. M. Hajdasinski

    "Any study in the field of theoretical investment analysis, or practical project evaluation, must be based on the assumption of one of the commonly applied models of time and value representation, and

    Jan 1, 1990

  • CIM
    Prospecting for deep volcanogenic ore

    By Julian Boldy

    "A review of lI5 significant volcanogenic massive sulphide discoveries in the Canadian Precambrian during the past 65 years reveals that only 7% resulted from surface exploration methods aimed at dept

    Jan 1, 1981

  • CIM
    A data acquisition system for geotechnical instrumentation and design

    By E. M. De Souza

    "The mining industry has developed a strong need for monitoring underground openings since bulk mining, used for increased productivity, has become the dominant mining method industry wide. The large

    Jan 1, 1992

  • CIM
    Cast iron in late medieval Europe: Are-examination

    By Bert S. Hall

    "IntroductionThe purpose o f this paper is to review the evidence at hand concerning the earliest centuries of cast iron in Europe, from roughly 1400 A.D. until the second half of the sixteenth centur

    Jan 1, 1983

  • CIM
    A blast design model using the inherent fragmentation of a rock mass

    By Brian C. Maynard

    "Blast design is becoming more and more important as industrial limitations change in regard to economical and physical restraints. Certainly there are ways to alter the nature of the blast by using d

    Jan 1, 1990

  • CIM
    The role of a pilot scale facility in performing R&D and helping Canadian coal and mineral industries

    By O. E. Humeniuk, A. I. A. Salama, M. W. Mikhail

    "The Western Research Centre (WRC) of CANMET operate a unique pilot plant facility where ongoing R&D on coal preparation and mineral processing is conducted. The pilot plant carries out two functions:

    Jan 1, 1992