Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Introduction -Papers on Cemented Backfill

    By J. R. Emery, D. F. Coates

    "FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil

    Jan 1, 1970

  • CIM
    New Innovations for Dewatering Using Teepee™ Panels on Vibrating Screens

    By A. D. Yell

    "Recovery of water is always a major factor in the Beneficiation process. As Preparation Plants become larger the recovery of water for reuse, is a critical cost consideration. Tema Isenmann Inc in co

    Jan 1, 2017

  • CIM
    Iron Ore in Canada: A Symposium

    By John Convey

    "IRON ORE was first smelted in Canada about the year 1736 at Les Forges, Quebec -a most appropriate name for such a historic locale. During these early years of the 18th, 19th, and first quarter of th

    Jan 1, 1955

  • CIM
    The Sherritt-Cominco Copper Process ? PART I : The Process

    By G. M. Swinkels

    Sherritt Gordon and Cominco, with financial assistance from the Canadian Government through PAIT, have developed a hydrometallurgical process for refining copper from sulphide concentrates. The main o

    Jan 1, 1978

  • CIM
    The Impact of Operating Cost on Life-of-Mine Costs of Hydrometallurgy Facilities

    By J. R. Porter, C. Panaou

    "A significant effort is expended on preparation of the capital estimate for feasibility studies. The development of the operating cost estimate is usually allocated a significantly smaller budget and

    Jan 1, 2012

  • CIM
    Neutron Methods for On-Line Analysis

    By Dalton. J. L., H. P. Dibbs

    An account is given of investigations into the application of two neutron methods to the on-line analysis of slurries. One deals with the application of the neutron moisture gauge principle to the det

    Jan 1, 1973

  • CIM
    Mathematical Definition of Particle Hydrophobicity

    As a bubble travels through the pulp region of a flotation cell, it will collect the most hydrophobic particles of an intermediate particle size range, this being the primary source of true flotation

    Jan 1, 2006

  • CIM
    The Position of Coal Supply tn Regard to the Requirements for Electric-Utility Operations

    By C. E. Baltzer

    This paper highlights the position of coal supply in regard to the requirements for electric-utility operations. The text and the appended tables outline the trend of thermal power development and fue

    Jan 1, 1961

  • CIM
    Carbothermal Upgrading of the Awaso Bauxite Ore using Waste Polypropylene as Reducing Agent

    By F. Awotwe-Appiah, P. Koshy, A. Y. Fosu, J. Dankwah, J. R. Dankwah

    Ghana currently exports its bauxite raw without any value addition. Gradual depletion of high grade bauxite (with high alumina content) and the emergence of low grade bauxite (with high iron oxide con

    Jan 1, 2015

  • CIM
    Bourlamaque batholith and its gold potential, Val d'Or, Quebec

    By Mehmet F. Tauer, Pierre Trudel

    "The metamorphosed mineralized Archean Bourlamaque batholith, dated at 2710 +-54 Ma, is a homogeneous body, composed mainly of quartz diorite; it is cut by late dioritic, mafic and aplitic dykes, and

    Jan 1, 1989

  • CIM
    Error Associated with the use of Triaxial Rock Strength Criteria when Assessing the Stability of Underground Openings

    By J. P. Harrison, R. Roostaei

    "In this paper we investigate the consequences of using conventional triaxial peak strength criteria in the polyaxial stress conditions that occur around the end of a long circular underground opening

    Jan 1, 2015

  • CIM
    Massive sulfide deposits in Northwestern Quebec

    By Sergio Cattalanl, Francis Chartrand

    "The geology and origins of volcanogenic massive sulfide (VMS) deposits in the Abitibi belt of northwestern Quebec have been the subject of discussion since the discovery of the Horne orebodies in Nor

    Jan 1, 1990

  • CIM
    The Importance of Accurate Rock Property and Virgin Rock Temperature Data in Ventilation and Cooling Planning Requirements

    By A. J. Russell

    "This paper investigates why it is critical for a mine to accurately determine thermal rock properties and virgin rock temperatures. Theoretical simulations of deep mining production zones have demons

    Jan 1, 2019

  • CIM
    Solidification Mechanisms of Melt Conditioned Direct-Chill (MC-DC) Casting

    By Jayesh B. Patel, Zhongyun Fan, Hu-Tian Li

    "Melt conditioned direct-chill (MC-DC) casting is a novel technology which combines vertical direct-chill (DC) casting with a high shear device directly immersed in the sump for in situ microstructura

    Jan 1, 2018

  • CIM
    A Process for Preparing Tungstic Trioxide of High Purity from a Canadian Scheelite Concentrate

    By W. A. Gow, J. A. Vezina

    "A new process for treating scheelite for the production of tungstic tri-oxide is described. The novelty of the process resides in that an ion-ex-changer is used to convert sodium tungstate to either

    Jan 1, 1966

  • CIM
    Stratigraphic and structural setting of stratabound lead-zinc deposits in southeastern B.C.

    By Trygve Høy

    "Important stratabound lead-zinc deposits in southeastern B. C. occur in rocks that range in age from Proterozoic Helikian to Middle Cambrian. The Sullivan deposit, and similar but smaller deposits in

    Jan 1, 1982

  • CIM
    Toward a Better Understanding of Mine Shaft Guides

    By J. S. Redpath

    There appears to a definite trend toward the hoisting of greater tonnages from greater depths. There is every indication that this trend will continue and we feel that improvements in the design, fabr

    Jan 1, 1977

  • CIM
    Peirce-Smith Converters: Automation, Design, Operation and Environmental Improvements at Kansanshi Copper Smelter

    By David deVries, James Rajith, Paul Mascrenhas, Nurzhan Dyussekenov, Lawrence Hanschar

    Kansanshi Copper Smelter commenced operation in March 2015. The smelter features four Peirce- Smith Converters (PSCs) operated in a three hot, two blowing configuration. This paper describes some of t

    Jan 1, 2019

  • CIM
    Falconbridge Mine-No. 9 Internal Shaft and Facilities

    By V I. McCallum

    In 1954, Falconbridge Nickel Mines Limited began the program of deepening the Falconbridge mine workings for 2,000 feet below the bottom, or 4025, level in order to provide twelve new levels for produ

    Jan 1, 1964

  • CIM
    The Electrical System of the Hudson Bay Mining and Smelting Company, Limited

    By G. F. Cross

    INTRODUCTION THE electrical system associated with the mining development of the Hudson Bay Mining and Smelting Company, Limited, at Flin Flon, Manitoba, may be conveniently divided into three main p

    Jan 1, 1935