Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Web-based Approach to Control Loop Assessment in a Mineral Processing Facility
By Dave Shook
A Mineral Processing facility in Montreal has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition-based maintenance. This
May 1, 2002
-
Ecological Costs of Open Pit Coal Mining and their Influence on Ultimate Pit Design
By X. Gu
Mining operations, especially surface coal mines, have great impacts on the local ecosystem and the environment. However, it has been a common practice in mine design that the economic evaluation cons
Aug 1, 2013
-
Supporting Minerals and Natural Recourses Industries: Growth of Engineering Programs at Laurentian University
By Ramesh Subramanian
Overview Background / History Undergraduate Programs Mining Engineering Chemical Engineering Mechanical Engineering Graduate Programs and Research Student Enrolment (2002 -) Future Plans
Oct 1, 2010
-
Waste management: A materials management/product stewardship approach
By Redhead Robert J.
"In 1991, the Canadian Council of Ministers for the Environment (CCME) charged its Waste Management Task Group with developing a nationally coordinated strategy to measure, monitor, and achieve the ob
Jan 1, 1996
-
Geology of the Voisey’s Bay Ni-Cu-Co Deposit, Labrador, Canada
By Rosie Moore, Harvey Keats, Kerry Sparkes, A. J. Naldrett
"Abstract-The Voisey’s Bay Ni-Cu-Co deposit was discovered in late 1994 as the result of prospecting initiated in the summer of 1993. By July 1995, proven mineable reserves were 31.7 x 106 tonnes grad
Jan 1, 1996
-
Enhancing Blast Efficiency and Fragmentation Through PSD Analysis and first comminution stage Optimization
By N. F. Faria, F. Monteiro, B. O. Taiwo, A. Palangio, D. Fonseca, J. Manuel
This paper explores the interpretation and application of Particle Size Distribution (PSD) curves in optimizing blast design and enhancing downstream operations. The study looks at important factors l
May 4, 2025
-
The Square-Set Method of Stoping at Butte
By J. B. Mawdsley
From the view point of the mining engineer, the square-set method of stoping as practised at Butte, Montana, is one ?of the outstanding features of well conducted mining operations in that camp. The f
Jan 1, 1925
-
Stability of high narrow backfills
By R. J. Mitchell
"High narrow backfills of significant strike length approach the stress conditions associated with a free standing wall but this lower bound design approach is not considered efficient for earth struc
Jan 1, 1989
-
The Internal Shaft at Dome Mines, Limited
By Chas Kemsley
NO. 6 shaft at Dome Mines, Limited, is an internal shaft going down vertically from the sixteenth, or 2,000-ft., level to the twenty-ninth, or 4,000-ft., level, with loading station and sump below thi
Jan 1, 1938
-
Elemental Sulphur Recovery in Western Canada
By M D. Winning
The historical development of the elemental sulphur recovery industry in Western Canada is reviewed for the period 1952 to 1965. A brief technical description of a typical modified Claus sulphur recov
Jan 1, 1965
-
Catalytic and Non-Catalytic CO oxidation on Au/TiO2 Catalysts
By Jorge M. C. Soares
The CO oxidation reaction has been studied on Au/TiO2 catalysts prepared by incipient wetness (IW) and deposition-precipitation (DP) methods. Additionally the assessment of activity was also conducted
Oct 1, 2003
-
Wheeler River Uranium Project
By Dale Verran, Jared Orynik, Chad Sorba, David Bronkhorst
Denison Mines Corp. (“Denison”) has a 90% interest in the Wheeler River Uranium Project (“Wheeler River”) located along the eastern edge of the Athabasca Basin in northern Saskatchewan between the Key
Jan 1, 2020
-
Bacterial corrosion studies at Ontario Hydro
By A. C. Headon, K. W. Lam, D. P. Dautovich
"Microbiological activities affecting the performance of materials have been encountered in diverse situations within Ontario Hydro. Case histories of bacterial problems which are presented include gr
Jan 1, 1984
-
A Historical Survey of the Methods Used to Reduce the Size of Ore at the Holliger Mine
By I. M. Gordon, J. Blackshaw
"Run-of-mine ore is reduced to 4 per cent on 4 mesh (3/ 16 inch), using four stages of dry crushing. The mill feed is then reduced to 2 per cent on 48 mesh and 60 per cent through 200 mesh, using one
Jan 1, 1965
-
Financing Mine Development
By A. W. White
Introduction To discuss all the technical details of incorporation laws, security laws, underwriting procedures, codes, and ethics-as laid down by varous associations -would be impossible in the time
Jan 1, 1951
-
1995 Federal Budget Targeting expenditure
By Robert B. Parsons
"Finance Minister Paul Martin's second budget might be good for Canada's mining industry in the long run, but the budget raises a number of concerns for the industry in the near term. The bu
Jan 1, 1995
-
CHILE - Fission Track Thermochronology of the Domeyko Cordillera, Northern Chile: Implications for Andean Tectonics and Porphyry Copper Metallogenesis
By Victor Maksaev, Marcos Zentilli
"Abstract - The Domeyko Cordillera, the westernmost uplifted crustal block of the composite High Andes of northern Chile (20°S to 28°S) hosts a narrow N-S trending belt of Late Eocene-Oligocene giant
Jan 1, 1999
-
From Landmines to Mines and their Logistic Network Risks
By Cesar H. Oboni
The development of specific risk-based methodologies to guide and prioritize clearing decisions in countries contaminated by Unexploded Ordnance and Land Mines (generically defined as Explosive Remnan
May 1, 2010
-
Shaft Sinking in the Next Five Decades / 2070
By William M. (Bill) Shaver
"The author will review the early history of shaft sinking as well as focus on the improvements made in shaft design and construction over the last fifty years (1970 to 2019) to predict how shaft sink
Jan 1, 2019
-
Simulation of a longwall development extraction network
By Sukumar Bandopadhyay, Arunapuram Sundararajan
"For the last three decades, the application of network planning has provided a basis for a formal and general approach to the discipline of project management. For fixed activity duration, a very sim
Jan 1, 1987