Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Limited Recourse Financing for Major Mining Projects: A Financial and Technical Interface

    By Massy-Greene RB

    Limited recourse financing techniques reduce the financial exposure of equity holders to major mining projects by transfering some of the risks to the banks which provide loan funds for project de

    Jan 1, 1981

  • AUSIMM
    Vertical Zoning of Gold-Silver Tellurides in the Emperor Gold Mine, FIJI (b1896fb0-832e-4b16-ab7a-90456644fb33)

    An increase in the silver to gold ratio with increase in depth in the main ore shoot of the Crown-Crescent lode in the Emperor gold mine, Fiji, was found to be due mainly to vertical zoning of gold-si

    Jan 1, 1971

  • AUSIMM
    Are You Being Served?

    The Cooperative Research Centres (CRC) Program was established and is supported by the Australian Government at a total cost of $140 million per year. Six of these centres have been established to h

    Jan 1, 1996

  • AUSIMM
    Displacement Within the Tasman Fold Belt: Paleomagnetic Indications?

    Late Palaeozoic and Late Mesozoic phases of widespread overprinting have obliterated most of the primary magnetization signature of the Tasman Fold Belt. Palaeomagnetic programs of a regional ext

    Jan 1, 1987

  • AUSIMM
    Managing Damage on Draglines and Other Mining Machines

    By P Murthy, Z Guan, P Townson

    In this paper, we introduce a methodology to optimise mining equipment operation in terms of the conflicting concerns of productivity and availability. We also introduce the concept of damage points a

    Jan 1, 2000

  • AUSIMM
    Feasibility Studies for Financing Purposes

    By Sroka J

    A comprehensive feasibility study should be submitted as part of the loan application to a financial institution for debt funding of a proposed project. Its scope should include technical, costing,

    Jan 1, 1978

  • AUSIMM
    Operation and Optimisation of the Argyle HMS Plant

    By Hutton W

    The Argyle Diamond Mine is the first significant diamond producer in Australia. The project has been developed with new concepts in circuit design, process control technology, organisational deve

    Jan 1, 1987

  • AUSIMM
    Practical Applications of a Blast Furnace Stack Permeability Model

    By Peak DJ, Kearton CJ

    Following a summary of the development of a BF model using aerodynamic relationship and bulk fines index a blast furnace policy model is presented complete with the development of nomograms and featu

    Jan 1, 1975

  • AUSIMM
    The State of Ferromanganese Producers in India

    By D R. Swinbourne

    In the recent past a number of smelting plants were commissioned in India to supply the rising demand by domestic steelworks for manganese-based ferroalloys, and they enjoyed cheap electric power and

    Jan 1, 2000

  • AUSIMM
    The Rise of the On-Site Geotechnical Engineer

    The current boom in the mining sector has required mining operations to ramp up production to meet the international demand for minerals. This increase in production is putting enormous pressure on on

    Jan 1, 2006

  • AUSIMM
    The Design, Installation, and Management of Computer-Based Process Control Systems in the Metalliferous Industries

    The sudden. explosion of relatively inexpensive digital process control computers has accelerated interest in the possibilities of economic savings by their use. In particular the metalliferous in

    Jan 1, 1977

  • AUSIMM
    Control of Ore Flows at Opencasts

    By M A. Faizulin, N G. Stukalova

    The present till now practice of averaging of ore by metal content at mining-dressing enterprises does not allow evaluating objectively really existing regularities of dressing process. The processing

    Jan 1, 2003

  • AUSIMM
    Leaching and Solvent Extraction at Mary Kathleen Uranium Ltd.

    Mary Kathleen Uranium Ltd. recommenced operations in early 1976 following a twelve year period of care and maintenance. Several sections of the plant were modified or completely changed for the sec

    Jan 1, 1978

  • AUSIMM
    Pilot Plant Studies in the Recovery of Copper from Copper-Lead Dross

    By Lewis IE

    Copper-lead dross is a by-product of the refining of lead bullion produced by the Imper- ial Smelting Process. This dross contains some 27 percent copper, 50 percent lead, four percent zinc and one

    Jan 1, 1975

  • AUSIMM
    Ore Reserves Estimates And Comparisons With Mine Production From The Cattlegrid Orebody, Mt. Gunson, South Australia

    By Gelding P. W, van Herk H

    The Cattlegrid copper orebody is a concealed thin, tabular sheet localised near an unconformity between two sub- horizontal Precambrian sandstone units. It extends over an area of 1,000 m by 500 m

    Jan 1, 1979

  • AUSIMM
    Fordertechnik Dewatering Screens

    This paper will discuss Fordertechnik dawatering screens and their application in process industries. Fordertechnik screens were designed for the dewatering of deslimed, wet fines materials encoun

    Jan 1, 1984

  • AUSIMM
    The Discovery of Uranium Mineralization in the Ngalia Basin, N.T

    By Spark R. F

    The copper deposits at Pernatty Lagoon are predominately djurleite-digenite bodies beneath the permanent water table, and chrysocolla-atacamite-malachite above the permanent water table. The minerals

    Jan 1, 1976

  • AUSIMM
    Mine Planning by Quarters

    By B Ascott, J Kennedy, A White

    At mines with low tonnes per vertical metre, like the Jundee Mine in Western Australia, operated by Newmont Asia Pacific, high development rates across multiple mining areas are critical to achieving

    Jan 1, 2008

  • AUSIMM
    Setting Plant Capacity

    The optimum plant capacity for a new mine is usually based on empirical studies or ærules of thumbÆ, subject to confirmation by detailed scheduling of the proposed mining operation. The mining industr

    Jan 1, 2002

  • AUSIMM
    Application of the Split Shell Concept to Open Pit Design

    By M S. Gallagher

    In todayÆs high tech world, systems are getting bigger, faster, better. To remain at the leading edge, in any business, depends on accuratebut flexible design thereby allowing operational managers to

    Jan 1, 2001