  • AUSIMM
    The Diesel Electric and Compressed Air Central Power Plant of Western New South Wales Electric Power Pty. Ltd.for the Broken Hill Mines

    Broken Hill is situated at an elevation of approximately 1000 ft. above sea-level, on the Barrier Ranges, in the State of New South Wales, Australia. It is approximately 700, 280 and 330 miles from th

    Jan 1, 1932

  • AUSIMM
    Application of Unique SONAR Array Based Process Monitoring Measurement Equipment for Process Throughput/Efficiency Improvements and Measurement Point Cost Reduction

    By C OÆKeefe, A Thomas

    Boom time in the mining industry has presented mill operators with several unique challenges including the need for increased throughput while being constrained by a shortage of skilled labour and agi

    Jan 1, 2009

  • AUSIMM
    Experimental Work on the Reduction of Zinc Calcine in a Molten Iron Bath

    The disadvantages of the present zinc producing methods, RLE and ISP, are high energy consumption and environmental problems. Therefore, efforts have been directed in Outokumpu Zinc towards the deve

    Jan 1, 1993

  • AUSIMM
    The Effect of Detonator Strength on the Initiation of Small Diameter Emulsion Explosives

    By Kerr I. D, Kennedy M

    Flash X-radiographs were obtained of commercial electric No 6 and No 8* strength aluminium tube detonators in small-diameter cartridges of emulsion explosive at various times after fusehead operatio

    Jan 1, 1990

  • AUSIMM
    Improving Autogenous/Semi-Autogenous Grinding Performance and Energy Efficiency with Optimised Pulp Lifter Design

    The comminution process indicates that the most energy-efficient comminution system would be one where the particles leave the breakage field as soon as they reach product size. Contrary to the free f

    Jan 1, 2009

  • AUSIMM
    Data Acquisition and Management at Olympic Dam Mine Operations

    The Olympic Dam Mining Operation involves the supply of some 2.2 million tonnes per annum of ore feed for the metallurgical plant. To achieve this approximately 9 km of tunnels are developed per year

    Jan 1, 1992

  • AUSIMM
    Two-Dimensional, Evaporative Flux Cover/Cap Analysis for Prevention of Acid Mine Drainage

    By J Krahn

    In designing climate exposed soil structures such as caps and covers over mine waste it is necessary to include the wetting and drying influences of the local climate in order to accurately predict th

    Jan 1, 2003

  • AUSIMM
    Basic Mechanism of Strata Fractures Formation and Expansion Around Mine Working

    Underground measurements, observations and computed simulations, started a long time ago were concerning the study of : - occurence of typical rockburst, - inducing, stretching of main fractures in

    Jan 1, 1988

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • AUSIMM
    The Operation and Interaction of Grates and Pulp Lifters in Autogenous and Semi-Autogenous Mills (60786753-9987-4610-9db2-f26067a91f8f)

    By S Latchireddi

    Close circuiting autogenous and semi-autogenous mills is an energy efficient way of grinding and a number of operations have utilised this in the design of their comminution circuits. Owing to the lar

    Jan 1, 2000

  • AUSIMM
    Thermodynamic modelling of the Fe-Al-Ti-O system and evolution of Al- Ti complex inclusions during Ti-added ultra-low carbon steel production

    By Y B. Kang, Y J. Park

    Ti-added ultra-low carbon (ULC) steel is produced by adding Al and Ti during the secondary refining process to deoxidise molten steel and to bind C and N which are detrimental to the deep drawing qual

    Aug 21, 2024

  • AUSIMM
    Cannington Growth Project û A Partnering Approach to Design and Implementation

    By D Fargher

    BHP BillitonÆs Cannington operation began production in 1997 and is presently the largest tonnage and lowest cost single mine producer of both lead and silver in the world. The original design capacit

    Jan 1, 2004

  • AUSIMM
    Selective Mining at Ok Tedi - Past, Present and Future

    Selective open pit mining for gold has been in progress at Harbour Lights since the onset of mining in March 1985. Selective mining techniques used are similar to those in other recently opened gold m

    Jan 1, 1986

  • AUSIMM
    Smart Solution to a Sticky Problem ù In-Mine Clay Mapping Using High-Resolution Geophysics

    By P J. Hawke

    Within the Mesa J pisolitic iron ore mine, clay is distributed unevenly throughout the deposit and often forms as pods and channels less than 10 m in width. The mine resource model, based on 50 m + 50

    Jan 1, 2002

  • AUSIMM
    Case Examples of Stability on Surface Mining Projects

    Stability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go

    Jan 1, 1986

  • AUSIMM
    The Development of the Rib-Roc Cable Bolt Reinforcement System at the Pasminco Mining Broken Hill Operations

    Longhole stope overbreak has always been a source of unwanted cost within the underground mining industry, and efforts to control it using various rock reinforcement systems have long been a rock en

    Jan 1, 1995

  • AUSIMM
    US Bureau of Mines Coal Mining Automation Research

    By Bevan JE

    The US Bureau of Mines is conducting research to improve the health and safety for underground coal miners, and the efficiency of the mining systems that are used. In 1986, the Bureau began a major re

    Jan 1, 1991

  • AUSIMM
    The Design of the Rosebery (Tasmania) Concentration Mill - Factors Influencing Choice of Equipment

    BECAUSE of the attention given in recent years to the flotation process, there is an extensive range of equipment available to any staff detailed for: the design of a flotation mill. This statement ap

    Jan 1, 1929

  • AUSIMM
    Experiences eith the Electric Overhead Trolley System at the CSA Mine, Cobar

    By Roberts M. L

    Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa

    Jan 1, 1988

  • AUSIMM
    Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and Design

    By Napier-Munn T. J, Morrison R. D, Moloney M. J, Corrans I. J

    A dynamic simulator for CIP / CIL gold recovery plants has been developed at the Julius Kruttschnitt Mineral Research Centre within a collaborative, industrially - funded AMIRA project and with the

    Jan 1, 1991