Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Methodology for Rock Mass Characterisation to Control Blast-induced Vibrations

    By A Karrech, E Hamdi

    The uncertainty of geomaterials properties is commonly encountered in resource engineering applications, especially in mining engineering where the rock mass texture, joints, fractures and damage zone

    Aug 24, 2015

  • AUSIMM
    Taking Control of the Mill Feed: Case Study û Partial Secondary Crushing Mt Rawdon

    By B Siddall, A Gunstone

    The use of a partial secondary crushing circuit provides a flexible way to optimise existing SAG comminution circuits limited by rock competency or enables optimal processing of an ore through second

    Jan 1, 2004

  • AUSIMM
    Mechanised Shields for Trenchless Sewer Construction in Singapore

    By Musa MA

    Tunnel excavation for sewer construction long remained a labour intensive, hazardous and costly operation. Even with the of mechanical and semi-mechanical shields for tunnel excavation, many problems

    Jan 1, 1993

  • AUSIMM
    Application of the ISAMILL (A Horizontal Stirred Mill) to the Lead-Zinc Concentrator (Mount Isa Mines Ltd) and the Mining Cycle

    By B Cronin, M Gao, M F. Young

    Fine grinding technology has become extremely important for Mount Isa Mines Limited in the last decade for flowsheet development for the McArthur River deposit and in rejuvenating the Lead-Zinc Concen

    Jan 1, 1998

  • AUSIMM
    Iron Mineralisation Related to the South Ghorveh and Almoughlagh Batholiths, Western Iran

    The South Ghorveh Batholith (SGB) and the Almoughlagh Batholith (AB) intruded the volcanosedimentary sequence of Songhor Series (Triassic-Jurassic), during the Oligo-Miocene orogenic phase. The granit

    Jan 1, 2005

  • AUSIMM
    Tin Metallurgy in Great Britain-1929

    By Elford H. S

    Australia has many potentially important tin deposits, particularly on the eastern shore of the continent and in Tasmania. A number of these have been worked on a meagre scale, while some of them, bec

    Jan 1, 1930

  • AUSIMM
    Stratigraphy and Geochemistry of the Flynn Subgroup Volcanic Rocks

    By Morrison R. S, Doennilan N

    Recent mapping (1989-1992) by the Northern Territory Geological Survey in the Tennant Creek 1:250 000 map sheet area has resulted in substantial revision of the lithostratigraphy of the Tennant Cre

    Jan 1, 1994

  • AUSIMM
    Measuring the Redistribution of Stresses Resulting from New Excavations with Ambient Seismic Noise Correlations

    By F Brenguier, R A. Lynch, G Olivier

    The seismic velocities of intact rock are dependent on the applied stress. Unfortunately, the low susceptibility of seismic velocity to stress changes mean that changes in seismic velocity have to be

    May 9, 2016

  • AUSIMM
    How Ore Deposits can be Overestimated Through Computational Methods

    By Watson DF

    Calculation of the amount of metal in an ore deposit or mining block should be approached by multiplication and integration of appropriate numerical manifolds describing the spatial distribution of

    Jan 1, 1987

  • AUSIMM
    The Porphyry Gold Mine, W.A. From Prediction to Production

    The Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based

    Jan 1, 1986

  • AUSIMM
    Pyrometallurgical process simulations using CALPHAD thermodynamic databases

    By M-A Van Ende, N Kumar, I-H Jung

    In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio

    Aug 21, 2024

  • AUSIMM
    Automating Hoist Rope Inspection Processes

    By B Delaney

    For worker safety, mining companies are required to stop production and inspect hoist ropes. Visual inspection is generally done daily and EM inspection occurs every three to four months. During visua

    Jan 1, 2005

  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    Jones-Wilkins-Lee Parameters for Civil Explosives

    By R Castedo, P Segarra, L M. López, J A. Sanchidrián, A P. Santos

    The cylinder test allows us to determine the expansion of a copper cylinder by the detonation of an explosive charge inside. This test, originally designed for military explosives, has been adapted fo

    Aug 24, 2015

  • AUSIMM
    Large Dual Purpose Rock Installations in Norway in Peace Time: Recreational Facilities in War Time: Civil Defence Shelters

    Norway, a country large in area but small in population, has put large effort in protect- ion of its inhabitants in case of war. The Civil Defence has provided shelters for more than 50% of the pop

    Jan 1, 1987

  • AUSIMM
    A Continuous Oxygen Probe for Non-Ferrous Smelting Slags

    By Flloyd J. M

    A continuous oxygen probe,incorporating a SIRO2 solid electrolyte oxygen sensor which measured the oxygen potential of a small volume of gas enclosed above the melt's surface,was constructed

    Jan 1, 1987

  • AUSIMM
    Asymmetric Blasting: A Rock Mass Dependent Blast Design Method

    Blasting has been the most frequently used method for rock breakage since black powder was first used to fragment rocks, more than two hundred years ago. This paper is an attempt to reassess standard

    Jan 1, 2001

  • AUSIMM
    Oaky Creek Coal - Improving Productivity

    By Lynch P

    Oaky Creek Coal Pty Ltd. currently mines high quality coking coal from both underground and open cut operations at its Oaky Creek Mine. Coal is transported by rail to the Dalrymple Bay Coal Terminal s

    Jan 1, 1998

  • AUSIMM
    Geodynamics of Giant Porphyry Ore Deposits

    By D Giles

    We present plate tectonic reconstructions, showing that porphyry-type ore deposits are spatially and temporally linked to ridge subduction. A reconstruction of the Peruvian subduction system reveals a

    Jan 1, 2008