Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Lead-Zinc Mineralization at Box Hole Bore, Georgina Basin, Northern Territory

    The common notion that the Box Hole Bore mineralization represents a variant of the Mississippi Valley type, has not been supported by the present investigation. Most of the common characteristics

    Jan 1, 1984

  • AUSIMM
    3D Geological Modelling of the Campbell Mine, Ontario, Canada

    By G Kuntz, V Wall, B New

    The prime aim of the Campbell Mine project was to develop a 3D geological model for the Campbell-Red Lake system to contribute to an exploration model for the region. The base data is composed of over

    Jan 1, 2003

  • AUSIMM
    Women in Underground Mining in Australia

    In the last few years it has become legal for women to work without restriction underground in some States in Australia. Since the mid 1970's there have been women graduates in mining enginee

    Jan 1, 1988

  • AUSIMM
    Metal Balancing From Concentrator to Multiple Ore Sources

    By Y Gu, W McCallum

    Mathematically sophisticated methods are now in common use for metal balancing of complex separation flow sheets at many concentrators. These balances usually entail minimisation of the sum of weighte

    Jan 1, 2002

  • AUSIMM
    Inclined Blastholes for Pit Wall Control Using Tamrock 4000 Drill

    A typical large surface mine in Scandinavia has hard rock, a cold cli- mate, poor ore, a complicated vein type orebody and high labour costs. In order to survive, these mines have to maximise their o

    Jan 1, 1989

  • AUSIMM
    The Status of Risk Management in Australian Mining - A Best Practice Review

    In October 2005 Phelps Dodge mining, a US based company, visited several Australian mining companies and mine sites to ascertain the current applications of risk management methods in the organisation

    Jan 1, 2006

  • AUSIMM
    Managing Technical Risk for Mine Feasibility Studies

    The commercial outcomes from new mining projects or brownfields expansions often fall short of feasibility study forecasts because of technical under-performance. This paper: reviews past feasibility

    Jan 1, 2003

  • AUSIMM
    Technical note-a laboratory scale rotary kiln simulator

    By Field R. V, Graieg O, George T. J

    The design, construction and operation ofa laboratory scale rotary pot kiln are outlined. Charges ofup to 3 kg can be heated to temperatures up to 1200°C in a controlled atmosphere. Some examples

    Jan 1, 1986

  • AUSIMM
    The Geological Setting of Queensland Coal

    Queensland hosts vast deposits of brown and black coal, significant accumulations ranging in age from Permian to early Tertiary. The great diversity of coal resources in the State to some extent re

    Jan 1, 1991

  • AUSIMM
    Integrating Srata Control with Coal Winning Systems

    Under South Africanncoalmining conditions, in the majority of instances coal is won using the bord and pillar system without pillar extraction. Examples demonstrate that strata control policy has an

    Jan 1, 1971

  • AUSIMM
    The Effect Of Prices And Cost On Ore Reserves

    Changes in prices and costs change the mineable grade and the profitabil- ity of an ore reserve. In a static world the grade required for an ore reserve is measured by the ratio: Cost/tonne of ore x

    Jan 1, 1979

  • AUSIMM
    Formation and Particle Size of Jarosite

    By Phipps P. J

    The rate of precipitation of ferric iron as ammonium jarosite, NH4.Fe3(SO4)2(0H)6 from acidic solutions near 100¦C, was found to increase with weight of jarosite seed crystals, and with concentrati

    Jan 1, 1977

  • AUSIMM
    The Role of Allochtonous Terranes in Construction and Evolution of the Pacific Continental Margins (For North USSR)

    By Ushakov S

    New geological and geophysical in vestigation including our detailed field observation in different regions of the Koryak upland testify that Nor- theastern Eurasia margin eastward of the Ochotsk-C

    Jan 1, 1987

  • AUSIMM
    An Approach to Coping with Unstable Pit Walls

    In any open pit mine some slope instability may be expected. This can range from small scale sliding on individual benches to large scale overall slope failure. This paper presents two case histori

    Jan 1, 1986

  • AUSIMM
    The Importance of the Bosh and Hearth in Influencing Blast Furnace Gas Flow

    The physical phenomena which influence gas flow in the bosh and hearth of a blast furnace are discussed including the hold-up of slag as a mechanism which can result in a flooding condition. An equat

    Jan 1, 1975

  • AUSIMM
    Process Control Developments at Queensland Alumina

    The completion of the 3rd expansion at Queensland Alumina added 725,000 t.p.y. capacity to what was already the world's largest alumina refinery. Rated design capacity is now 2.0 million t.p.

    Jan 1, 1974

  • AUSIMM
    Mining The Thick Seams Of The South Maitland Coalfield, N.S.W.

    The thick coal seams of the South Maitland field are the only ones in New South Wales which have been worked extensively to heights beyond 3.8 m (nominal "thin" seam height). Under shallow cover o

    Jan 1, 1976

  • AUSIMM
    Optimising Grade Control Procedures in Large and Small Open Pit Mines

    By Khosrowshahi

    A scientific approach to analysing grade control has been applied at a number of mining operations. By dividing the grade control process into the various stages of data collection and interpretation,

    Jan 1, 1992

  • AUSIMM
    Case Studies of International Copper Development Projects

    By Pollack B

    Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th

    Jan 1, 1983

  • AUSIMM
    Underground Mobile Crushers

    By Tukkimies M

    During the late-1980s crawler-mounted crusher units established their position in the aggregates industry. Between 1986 and 1994 about 700 units were delivered to customers all over the world for s

    Jan 1, 1995