Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Moving beyond Net Present Value project evaluation to achieve Environmental, Social and Governance goals for mine operations and closureBy H Simpson, C Gimber
The financial evaluation of mining projects drives a whole range of decision-making regarding project viability, project design, operating models and closure philosophy. Net Present Value is a financi
Aug 2, 2023
-
Underground Information Technology Infrastructure - A Sound Basis for Efficient Future Mining OperationsBy M Schmid
German hard coal mining operations have decreased for more than 40 years. Current political decisions are leading to a discontinuation of subsidised black coal mining by the year 2018. This decision w
Jan 1, 2008
-
Deep Paste Thickening Systems (Brisbane, 14 - 16 April1998)By Laros T, Schoenbrunn F
Deep paste thickeners have been proven capable of consistently producing medium to low slump material for disposal without the need for filters. However, proper design of the entire system is critic
Jan 1, 1998
-
Earthworks or Landforms? Designing for Lease SurrenderBy S J. Henderson
Over much of Australia, rainfall is highly seasonal and storm-driven. Consequently, operational mines often need extensive earthworks – drains, dams and levees – for protection during the occasional l
Jun 28, 2016
-
Dynamic concepts for mine to mill operation and optimisationBy R Pax
Feed ore variability, the major disturbance into a mineral processing plant receives considerable attention operationally, and at research and strategic levels to ensure that the throughput of the ore
Nov 21, 2018
-
The Effect of Thallium on the Rate of Extraction of Gold from Pyrites CalcineThe addition of a thallous salt to the cyanide leach of a calcined pyritic concentrate causes a marked increase in the"rate of extraction of gold. This probably is due to the activation of passive
Jan 1, 1964
-
World-class mine planning for a sustainable future in Kazakhstan MiningBy C Catania
Mining companies and operations across the globe typically target best practice financial management, along with a focus on economically driven mine plans. Not only is this inherent in running a succe
Jul 25, 2018
-
Eight competencies of safety leadership excellenceBy A Gibbs
Culture and leadership go hand in hand, especially when it comes to investing in safety. But the reality is that most safety leaders haven’t been taught the fundamental soft skills needed to lead effe
May 5, 2022
-
Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvalsBy C Tomlin, C Gimber
Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation
Aug 2, 2023
-
Caving characteristics and support loading of longwalls in massive strataBy T R. Gibbons, I Grayand
Geotechnically massive strata may lead to a host of problems during longwall mining. These include windblast on initial goaf fall, sudden loadings on powered supports, periodic weightings, fractures t
Nov 29, 2022
-
Design and Rehabilitation of Large External Waste Dumps: a Case StudyBy Fletcher G
This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba
Jan 1, 1992
-
Stope Control at The C.S.A. Mine, CobarStope control information at the C.S.A. mine is obtained by diamond drilling inclined holes from within the stapes. Practical mining outlines are determined from complicated ore contours by a joint mi
Jan 1, 1969
-
Operational risk management and critical controls for interacting pit stages at Ok TediBy J Isarua, R Mabiria
The Ok Tedi copper and gold project, located in the Western Province of Papua New Guinea, commenced operations in 1983. The open cut mine has undergone several significant transformations throughout i
May 5, 2022
-
Investigation of Curd Formation in Solvent ExtractionBy Hughes CA
The need to recover metals from low grade deposits, old tailings, etc., combined with improvements in equipment design and the development of new extractants, has resulted in solvent extraction (SX)
Jan 1, 1990
-
Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9By R Justa Cámara, L M. Pinillos Lorenzana
Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L
Sep 17, 2014
-
Experimental Study on the Mineral Processing of a Large-Scale Scheelite Mine in Jiangxi ProvinceBy X Zhang, Z Guang, R Lin
To improve the existing process of a large-scale scheelite concentrator in Jiangxi Province, this paper presents an advanced process æselective flotation of copper and flotation desulfurisation û roug
Jan 1, 2008
-
Geometallurgical Modelling – A Mineral Processor's PerspectiveBy A Stradling
For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can
Sep 5, 2011
-
Philex Gold Philippines, Inc's Bulawan Mine - The Philippines Largest Primary Gold ProducerBy Anievas JB, Sevillano AC
This paper describes the acquisition, exploration, development, initial operation and subsequent financing of the Bulawan mine by means of a listing on the Toronto Stock Exchange of a subsidiary of th
Jan 1, 1997
-
Optimisation of Slope Angles at Rosario Mine, CollahuasiBy A R. Bonani, M P. Pe±a
The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p
Jan 1, 2007
-
A One Step Process for Manganese Leaching-Desulfurisation of Flue GasBy A He, J Li, J Pan, J Clout
The removal of sulfur from SO2 containing flue gas is improved by adsorbing SO2 into solution with manganese ions as catalyser, however, burnt lime slurry has to be added to modify solution pH and the
Jan 1, 2004