Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Toowong process for treatment of complex ores

    By L MacDonald, D Molver, D Pepper

    Increasing contamination/impurity levels (including arsenic, antimony, mercury etc.) of concentrates is an issue of global commercial and health / environmental significance. With increasing environme

    Nov 21, 2018

  • AUSIMM
    Reduction of Mechanical Entrainment by Polymer Depressants

    By Y Peng, D Wannas

    In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl

    Jan 1, 2005

  • AUSIMM
    The Kinetics of Potassium Vaporization from the Slag in the Blast Furnace

    By Tsuchiya N, Takada Y, Okabe K

    Alkalis in the blast furnace are removed mainly by the slag, Alkali removal by the slag was studied as a rate process of alkali vapor- ization from the slag flowing through the dropping zone in the

    Jan 1, 1980

  • AUSIMM
    HellyerÆs Exploration Development

    By Viney K. G, Molinia A. B

    The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early

    Jan 1, 1988

  • AUSIMM
    Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken Hill

    By G C. Reed, J M. Murray

    During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to

    Jan 1, 2000

  • AUSIMM
    Measurement and Analysis of Seismic Events in Deep-Level Coal Mine

    By Goto T, Sato K, Mori N

    A field investigation by making use of the seismic method has been carried out in order to comprehend the mechanism of rockburst and gas outburst and their predictive measures. The seismometers wer

    Jan 1, 1980

  • AUSIMM
    Hudson Bay Mining and Smelting ù æA Turnaround SuccessÆ

    By D W. Nisbet

    Today Hudson Bay Mining and SmeltingÆs 777 Project is the largest mining construction project under way in Canada. The project comprises six components: construction of the new 777 zinc-copper mine; c

    Jan 1, 2000

  • AUSIMM
    A Computer Network for the Extended Analysis of Data from a Computer Controlled Electron Probe Microanalyser

    By Penney B. K, Baghdadi A. A

    An electron probe micro-analyser, controlled by a dedicated mini-computer,has been operating at Imperial College since 1970. The data assessment capability of the computer was limited and, in order

    Jan 1, 1977

  • AUSIMM
    Strategies and Achievements for Moving Towards Minimum Wastes and Emissions in the Asian Steel Industry

    By D-J Min

    Strategies and achievements in the Asian steel industry to construct industrial ecological chain are reviewed largely in the case of Japan, Korea and China. Emphasis is placed on the development of re

    Jan 1, 2004

  • AUSIMM
    Mineral Processing Plant Simulator in Continuous Surface Mining

    By R S. Suglo, G-K Er

    Mineral processing is an essential component of a mine production chain and it accounts for significant proportion of the production cost. Over the past decade, significant research progress has been

    Jan 1, 2003

  • AUSIMM
    Activated Basket Anodes from Nickel Powder IV Evaluation of Production Parameters for Scaling-up the LPS Process

    By McDonald K. J, Flann R. C

    A liquid phase sintering (LPS) process for preparing basket anodes from nickel powder has been scaled-up and the innuence of compact green density and sulphur content, as well as sintering conditions

    Jan 1, 1993

  • AUSIMM
    Dendritic Growth in Cadmium Electrowinning: Rationalisation and Prediction

    By Grady B. V, Ault A. R, Newman O. M G, Fraser R. J, Malcolm J. McPhersqn

    In all electrolytic zinc plants cadmium is removed as an impurity prior to the zinc electrowinning stage of the process. Cadmium metal is the favoured form of this by-product and most plants use an

    Jan 1, 1993

  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    A new test method for directional propagation of type-I rock cracks

    By W Y. Guo, L X. Chen, D X. Zhang

    To obtain the rock type-I crack propagation process accurately, a novel fixture is used to make the prefabricated crack of rock propagation along the predetermined direction. In this study, the crack

    Nov 29, 2022

  • AUSIMM
    Practical and Strategic Technology Choices for Advanced Mining

    By I Gipps

    The mining industry has come through a period of major change in community expectations regarding safety and environmental impact and these changes can be expected to continue in the future. These cha

    Jan 1, 2003

  • AUSIMM
    Design and Operation of Backfill for Reliable High Solids Concentration Discharge

    By A G McLean

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p

    Jan 1, 1998

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    Multi-physical field coupling model development and parameter analysis of natural gas hydrate considering mechanical damage

    By Z R. Guo, Y Qiu, X F. Wang

    Mechanical damage leads to the increase of effective stress of sediments, and pore closure hinders the discharge of methane gas. Ignoring the influence of mechanical damage leads to an excessive predi

    Nov 29, 2022

  • AUSIMM
    The New Iron and Steelmaking Process at New Zealand Steel

    This paper describes the new iron and steelmaking process recently commissioned at NZ Steel. Ironsand mined and concentrated at Waikato North head is slurry pumped 18 km to the company's Glenbroo

    Jan 1, 1986