Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Recovery of Water from a Colloidally Stable Kimberlite Suspension

    By Hunt MS

    A major diamond mining operation in South Africa is faced with the unique problem of recovering usable water from the fine tailings stream. The kimberlite ore hoisted is washed prior to crushing in

    Jan 1, 1988

  • AUSIMM
    Systems thinking and its need in the workforce of tomorrow

    By D Brown, K Markovic

    The world is becoming an increasingly complex environment to operate within. Adoption and evolution of technology is occurring at a rapid pace and operating spaces are growing in interconnectedness an

    Sep 1, 2024

  • AUSIMM
    Industrial Ecology and Metal Production

    As the worldÆs population and global standard of living increase, the role of metals in the economy will not diminish in the 21st century, despite substitution and dematerialisation trends. Industrial

    Jan 1, 2000

  • AUSIMM
    Improving Fine Sulfide Mineral Recovery ù Plant Evaluation of a New Technology

    By K Ellis, B Lumsden

    A full-scale statistically-based on/off plant trial of a new flotation conditioning technology designed to improve fine mineral recovery was undertaken to determine whether the recovery of selected fi

    Jan 1, 2005

  • AUSIMM
    Investigating psychosocial incidents and gendered violence for enhanced mine safety outcomes

    By D Flint, K Vague

    The Work Health and Safety Act 2020 (WA) (WHS Act; DMIRS, 2020) and associated Work Health and Safety (Mines) Regulations 2022 (WA) (WHS Regulations; DMIRS, 2022), supporting guidance materials and ot

    Apr 16, 2024

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston Mine

    By G E. Smith, G N. Lye

    Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional

    Jan 1, 2001

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    Final Pit Wall Stability ù Understanding Crest Loss Mechanisms and Possible Solutions to Block Movement

    By K McSweeney, A Marton

    This paper discusses the development of a strategy for ensuring long-term geotechnical stability of final pit walls at AngloGold AustraliaÆs Sunrise Dam Gold Mine. The strategy makes use of improved b

    Jan 1, 2004

  • AUSIMM
    The Implementation of Bulk Emulsion Explosives at Big Bell Mine (5ba8492f-dd77-4906-9379-17f94c93e0d9)

    By J Player, K Braddon

    High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices and o

    Jan 1, 1999

  • AUSIMM
    Road Trains Underground ù The Alternative Trucking System

    By K Guilfoyle, A Robertson

    In the mid-1970s, trucking ore from 400 m depth to the surface was perceived to be the practical and economic limit for metalliferous underground mines. Improvements in truck design and decline develo

    Jan 1, 2002

  • AUSIMM
    Numerical Modelling of an Outokumpu Flotation Cell

    By K Koskinen, S Ronkainen

    The flow field induced in an Outokumpu TankCell and by an OK rotor-stator mixing device in a laboratory and a process size flotation cell was modelled numerically using computational fluid dynamics (C

    Jan 1, 2005

  • AUSIMM
    Geotechnical monitoring at the Porgera Mine

    By Yambu J, Titus K

    Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic

    Jan 1, 1994

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Assessment of Ground Conditions for Pre-Stripping with Bucket Wheel Excavator

    By Ellery B. I

    Field investigations recently undertaken by Utah Development Company (U.D.C.) have been developed to allow the assessment of ground conditions relevant to the use of large bucket wheel excavators f

    Jan 1, 1981

  • AUSIMM
    Corporate Growth by Exploration - the BHP Example

    By Blain CF

    For all mineral resource-based companies, it is important to reach the right balance of investment between acquisition and exploration to allow the best chance of achieving long-term corporate goal

    Jan 1, 1986

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Advances in In Situ Testing of Ventilation Control Devices for Underground Mines

    By M Salu, G J. Kay

    "As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id

    Jun 1, 2012

  • AUSIMM
    Instability analysis in three-way and four-way coal mine intersections

    By B Abbasi

    It is well known that most roof falls in coal mines typically occur at and around intersections. Room-and-pillar and longwall coal mining systems typically develop 3-way and 4-way intersections. This

    Nov 30, 2018