Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Interpretation of Field Stresses and Deformation Moduli from Extensometer Measurements in Rock Tunnels

    By Redman P. G, McMahon B. K

    A simple technique for evaluating the field stress ratio is presented, based on the results of extensometer or convergence tape measure- ments taken in an advancing tunnel. This tech- nique also yie

    Jan 1, 1981

  • AUSIMM
    Blasting Approaches to Increase Mine Productivity and Reduce Greenhouse Gas Emissions in Surface Coal Mining

    By T Goswami, G Brent

    In response to concerns over greenhouse gas (GHG) emissions and an imposed cost in some jurisdictions, many mining houses have committed to reductions in their GHG emissions. However, mining faces par

    Aug 24, 2015

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand Tunnels

    By T Ireland, B Wright, S Weaver

    All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei

    Sep 17, 2014

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Mine Data Analytics – New Skills Required for Tomorrow’s Mines

    By P Knights

    This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins

    Nov 22, 2011

  • AUSIMM
    Some Radioisotope Applications in Mineral Processing

    By Wilkinson LR

    The object of this paper is to present a brief overview of applications of radioisotopes in mineral processing. The emphasis is towards on-line applications, and is to present the broad picture rat

    Jan 1, 1978

  • AUSIMM
    Defying Gravity – Brownfield Continuous Improvement

    By J Robinson, L D’Uva

    "The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat

    Oct 10, 2016

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    Geostatistical Analysis Of 18cc Stope Blcok, C.S.A. Mine, Cobar, N.S.W.

    By Leach B. G

    A geostatistical study was made of diamond drill hole intersections within 18CC stope block at the C.S.A. Mine, Cobar, N.S.W. The stope block is located in 18CC orebody which is a massive sulphide

    Jan 1, 1979

  • AUSIMM
    Computer Modelling Techniques and their Application to mine Evaluation and Operation

    By Stokes WPC

    The capital requirements to develop a new mining venture are becoming very large; amounts of the order of US$1,000 million are not now unusual among estimates to bring new mining complexes into pr

    Jan 1, 1980

  • AUSIMM
    The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in China

    By Y Zhou, Y Liu, J-P Yang, P Wang, K Hu

    "Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure

    Jul 10, 2012

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    The Toka Tindung Gold Project Northern Sulawesi, Indonesia

    By Tuckey SH, Wake BA, Ariti J

    Astute exploration on the northern Minahasa Peninsula, North Sulawesi, resulted in the discovery of the Toka Tindung, Pajajaran, Blambagan and Araren low-sulphidation quartz-adularia vein and stockwor

    Jan 1, 1997

  • AUSIMM
    Spontaneous Fire Risk Rating of a Colliery Proposed to be Developed by Short Wall Method of Mining

    By Sen S. K, Banerjee D. D, Nandy D. K

    It has been stressed that the intrinsic spon- taneous heating characteristics of a coal is not enough in predicting spontaneous fire risk of a mine. The influence of extraneous conditions created f

    Jan 1, 1988

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Sustainable Plant Design

    By J Kwak

    Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth

    Jan 1, 2004

  • AUSIMM
    Development of New High-Strenght Zinc Alloys

    By Kubo H, Ninomiya R, Ojiro T, Sato T

    New high-strength Zn alloys for moulds are demanded from the automobile and electric industries in Japan, because the s rength of Zn moulds is still not high enough for the mass production. There ar

    Jan 1, 1993

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023