Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC Code

    By G M. Jeffress, D C. Arne

    There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,

    Jul 29, 2014

  • AUSIMM
    Characterisation of In Situ Stresses for Tunnel Lining Design in the Sydney?Basin

    By A L. de Ambrosis, S J. Clarke

    In the non-codified realm of tunnel design there are issues which are sure-fire instigators of controversy. This paper presents a discussion regarding one particular issue which in the authors’ experi

    Sep 17, 2014

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Optimisation of Circuits for Gold Pressure Oxidation

    By F Saloojee, F K. Crundwell

    Refractory ores need to be pretreated prior to cyanide leaching for acceptable gold recovery. Pressure oxidation is one method of rendering the ores more suitable for cyanidation. The focus of this wo

    Sep 26, 2013

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
    Tube bundle analyser flow rate, why it is important

    By M Tsai

    Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa

    Oct 12, 2022

  • AUSIMM
    Localised Indicator Kriging

    By I Douglas, L Allen

    Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm

    Sep 26, 2011

  • AUSIMM
    Capacity Increase of the World's Strongest Belt Conveyor - Pushing the Limits in Chilean Copper Ore by RWE

    Mining of copper ore is still the most important business in Chile. In order to mine ore with a copper content of less than one percent at Minera Los Pelambres in an economical way, opencast mining is

    May 1, 2010

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • AUSIMM
    Sustainability in Mining Engineering - Strategies Through Education and Research

    By A J. Gunson

    The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain

    Jan 1, 2009

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume Highway

    By S J. Clarke, C S. Walker

    The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de

    Sep 17, 2014

  • AUSIMM
    Lump Ore Properties and Their Impact on Value-in-use in Ironmaking

    By T Honeyands, L Jelenich

    We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation

    Jul 13, 2015

  • AUSIMM
    The development of soil water characteristic curves for soil types classified according to the USCS

    By A Satyanaga, H Rahardjo, K G. Mercer

    The soil-water characteristic curve (SWCC) is one of the most essential soil properties in unsaturated soil mechanics. The water flow and storage characteristics of an unsaturated soil are closely rel

    Jul 23, 2018

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    How Much Do We Need to Drill?

    By C Taylor, E Retz

    Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr

    Jul 13, 2015

  • AUSIMM
    A Simple Technique for Using High Energy in Blasting

    By S J. Hawke, L A. Dominguez

    In non-ferrous metal mining operations, it is generally necessary to crush and grind the ore to a very fine particle size to effectively liberate the contained mineral from the host rock. Fragmentatio

    Aug 24, 2015

  • AUSIMM
    An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia

    By C F. Stokes

    The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)

    Aug 22, 2011