Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    Challenges Facing the Australian Gold Industry

    It would be a good thing when reviewing the challenges to be faced by the Australian gold industry to set the backdrop and scene for them, by briefly examining the history of this vital and dynamic in

    Jan 1, 2000

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°C

    By E Jak, G Khartcyzov, M Shevchenko

    The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco

    Jun 19, 2024

  • AUSIMM
    Comparison of Glass-fibre Reinforced Polymer Rock Bolts with Double Corrosion Protection Steel Rock Bolts for Use in Tunnel Applications

    By S J. Clarke, G Sieders

    Double corrosion protection (DCP) rock bolts have evolved to become complicated assemblies comprising numerous components. This complexity is mainly associated with durability considerations including

    Sep 17, 2014

  • AUSIMM
    Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving Mine

    By N Petropoulos and M J Thurley, E Righetti, M Wimmer

    Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra

    Aug 24, 2015

  • AUSIMM
    Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, Australia

    By D Smith

    The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la

    Aug 22, 2011

  • AUSIMM
    Laboratory Experiences in the Heat Hardening of Australian High Grade Iron Ores

    By Brien RT, O&apos

    The work reported in this paper extends,-bhsb on the "Heat Hardening of Artificial Magnetite ;Pellets"., which was described at the- International Symposium on Agglomeration ;-sponsored by the America

    Jan 1, 1963

  • AUSIMM
    Assessment of lifter effect on tumbling mill dynamics using CFD-DEM coupling approach

    By K Mayank, A N. Mainza, I Govender, M Narasimha, A Mittal

    In mineral processing industries grinding is the most energy-consuming process. A tumbling mill is an essential grinding equipment widely used for particle size reduction. Power consumption, impact fo

    Aug 24, 2022

  • AUSIMM
    Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength Limitations

    A review of all major TBM projects from 1974 to 1990 has been undertaken and the results entered into a database. A similar database was prepared from information obtained from a principal TBM manufac

    Jan 1, 1993

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Data-driven visualisation for the development of mining digital twin

    By C Zhang, R Liang, I Canbulat, S Saydam, B Li

    The integration of digital twins in mining represents a significant advancement towards enhancing operational efficiency and decision-making. Central to this development is the role of visualisation,

    Sep 1, 2024

  • AUSIMM
    Three Decades of Gold Production at the Newmont Tanami Operations

    By A Cranley, A Giblett, S Thacker

    The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil

    Sep 1, 2014

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Benchmarking versus Test Work - How Should You Manage Process Risk?

    By D Jeffery, R Whittering, G Lane

    Most aspects of process design are best addressed via bench scale or pilot plant scale test work. However, as experience is gained, fundamental or indicative data can provide more than adequate inform

    May 24, 2012

  • AUSIMM
    Simulation of Flotation Feed Pre-Classification

    By J Arola, B Kettunen, W M. Bond

    Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s

    Jan 1, 2005

  • AUSIMM
    A Potential Use of Oxygen and Carbon Isotope Zonations of Wall Rocks in Prospecting Skarn Pb-Zn Deposits at Kamioka, Central Japan

    By Matsuhisa Y, Sakurai W, Shimazaki H, Peiming H, Fukahori Y

    Oxygen and carbon isotope mapping of hydrothermally altered wall rocks was applied to the blind ore prospecting of skam Pb-Zn deposits in the Kamioka mining district, central Japan, where the wall ro

    Jan 1, 1995

  • AUSIMM
    Hierarchical Control Application to Flotation Columns

    By Yianatos J. B

    The advances in the study of control alternatives for flotation columns are reviewed. An integral solution to the control problem has to deal with problems associated with instrumentation, process m

    Jan 1, 1995

  • AUSIMM
    Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

    A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven

    Jan 1, 1990