Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rock Strength Anisotropy and Its Importance in Underground Geotechnical Design

    By M Sandy, A Vakili, J Albrecht

    Although rock strength anisotropy is a well-known phenomenon in rock mechanics, its impact on geotechnical design is often ignored. No widely accepted guideline currently exists for its characterisati

    Nov 5, 2014

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    An Assessment Of Swelling On Reduction Methods For Iron Ore Pellets

    An assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti

    Jan 1, 1974

  • AUSIMM
    Mineral chemistry of iron oxides in the Leveaniemi iron ore deposit in Northern Sweden

    By A Larsson, K Niiranen

    The Palaeoproterozoic Leveäniemi iron oxide apatite (IOA) deposit of the so-called Kiruna type is currently mined by Luossavaara-Kiirunavaara AB (publ.), commonly known as LKAB. The mineralogy of iron

    Nov 8, 2021

  • AUSIMM
    Soft Computing Approach to Predict Blast-induced Flyrock

    By N Gupta, R Trivedi, S Bhandari

    Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan

    Aug 24, 2015

  • AUSIMM
    Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon Scout

    By T D. H McGrath, O Baker, W P. Staunton, C Ypelaan

    "The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir

    Oct 10, 2016

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Digital Blasting - An Opportunity to Revolutionise Mass Underground Mining

    This paper discusses how the i-kon TM Digital Energy Control System may be deployed by miners of massive underground orebodies to deliver significant advantage in terms of safety, cost and environment

    Jan 1, 2000

  • AUSIMM
    The Effect of Sulphur on the Rate of Reduction of Zinc Oxide from Slag

    By Ranklin W. J

    The mechanism and rate-limiting step of carbonaceous reduction of zinc from slags was investigated in the laboratory. Disks of graphite were rotated in ZnO-containing slags at various speeds for fix

    Jan 1, 1993

  • AUSIMM
    The influence of roadway configurations on VCD and bulkhead design

    By M Salu

    Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme

    Oct 12, 2022

  • AUSIMM
    Glass Earth's Greenfields Gold Discovery Strategy Using Multi-Faceted Airborne Geophysical Surveying is Poised to Rewrite the Geology Of Central Otago

    By S Henderson

    The Otago Goldfield has produced approximately 8 million ounces of alluvial gold and over 2.5 million ounces of hard rock gold and is currently home to New ZealandÆs largest producing gold mine. In th

    Jan 1, 2007

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    Social Licence in Real-time – Using Dynamic Methods to Support a New Kind of Community Relationship

    By N Boughen, K Moffat, L Brooks, A Zhang

    In 2015, Ernst and Young (EY) ranked socio-political license to operate (SPLTO) as the fifth greatest challenge to the mining sector (EY, 2015). The EY report asserts that SPLTO will continue to prese

    Jun 28, 2016

  • AUSIMM
    Effect of Coarse Particles in Mineral Flotation

    By Shunli Z, Jin X, Guanzhou Q

    Flotation behaviour can be controlled, due to diminishment of granula quality and extension of specific surface area, by adding coarse particles (high- grade concentrates) to condition pulp. It has

    Jan 1, 1993

  • AUSIMM
    Application of Field Measurement Techniques to the Design of Roof Reinforcement Systems in Underground Coal Mines

    By Fabjanczyk M. W

    A limitation to present theoretical roof reinforcement design methods is the inability to derive accurate and quantitative information about the roof rock condition and the action of reinforcement

    Jan 1, 1986

  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    The Minerals Sector and Sustainable Development in Saudi Arabia

    There is no doubt that the mining sector is considered to be the backbone of many countries. Furthermore, it has played an important role in the prosperity of nations, whether developed or developing.

    Jan 1, 2009

  • AUSIMM
    Schrödinger’s kittens – lifting the lid on resource drill hole data after mining

    By D Corley, J Moore, M Grant, A, W R

    Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d

    May 24, 2023

  • AUSIMM
    Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater Quality

    By C Linklater, J Chapman, A Watson

    Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl

    Jun 28, 2016

  • AUSIMM
    Mechanised Development At The Kambalda Declines

    This paper deals with the evolution of present mechanised declining and orebody development practices at Kambalda, since their inception in 1969. Eight separate decline accesses have been establis

    Jan 1, 1987