Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Comminution Kinetics for Multi-Mineral Ores

    Comminution Kinetics equations are developed to take into account difference of grindability of mineral components. The equations describing both batch and closed circuit grinding or crushing processe

    Jan 1, 1985

  • AUSIMM
    Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surface

    By B Wu, C Zhao, B Lei

    At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur

    Oct 12, 2022

  • AUSIMM
    Carbon-in-Pulp Technology in Gold Extraction

    I am very pleased to be here at this seminar on carbon-in-pulp (CIP) technology for the extraction of gold as I am always interested to hear about any new development in any aspect of gold ore proce

    Jan 1, 1982

  • AUSIMM
    Pemali Open Pit Mine Slope Stability Problem

    By Bhattacharyya A. K>

    The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary

    Jan 1, 1989

  • AUSIMM
    Process mineralogy of Tarkwaian paleo placer gold deposit in Ghana

    By E A. Agorhom, M Beyuo, C Owusu, I Quaicoe

    Understanding the mineralogy and liberation of gold particles in an ore is key to the development and optimisation of gold processing operations, being cyanidation or gravity separation. This can be a

    Aug 24, 2022

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018

  • AUSIMM
    Ventilation and Refrigeration Design for the Access and Ore Production Decline to the Deep Copper Orebody at the Mount Isa Mine

    By Nixon C. A

    The exploration of Mount Isa Mines' new copper source will require the development of a five kilometre 4.7 x 5.5 metre blind decline commencing 1000m below the surface and extending to 1600m

    Jan 1, 1988

  • AUSIMM
    Grade Estimation from Radial Basis Functions – How Does it Compare with Conventional Geostatistical Estimation?

    By P F. Hodkiewicz, J de Lacey, M Stewart, R Lane

    "Implicit modelling is an approach to spatial modelling in which the distribution of a target variable is described by a unique mathematical function that is derived directly from the underlying data

    Aug 18, 2014

  • AUSIMM
    Evolution of a Structural Framework for High-grade Iron Ore Deposits

    By A R. Cruden, M S. Egglseder

    The formation of banded iron formation (BIF)-hosted high-grade iron ore deposits in the Hamersley Province, Australia has been debated for decades. Although a structural control on their formation is

    Jul 13, 2015

  • AUSIMM
    Experimental study on the mechanism of gas-coal dust synergistic control based on compound reagents enhanced water spray technology

    By B Zhao

    Gas and coal dust, as potential harmful elements (PHEs) produced during mining, are considered two serious threats to the safe mining and the health of miners because of its explosive and pathogenic p

    Oct 12, 2022

  • AUSIMM
    Solomon Iron Deposits – Continued Growth and Development

    By C Simpson

    In 2011 the forecasted world demand for iron ore continues to grow, and during this time Australia is looked upon as a reliable supplier of high quality ore. The expansion of the current Australian mi

    Jul 11, 2011

  • AUSIMM
    Sulfur Isotope Signatures for Orogenic Gold Deposits, Lachlan Orogen, New South Wales

    By P K. Seccombe

    Sulfur isotope data are available for 18 low-sulfide orogenic gold systems hosted by the Lachlan Orogen in eastern New South Wales including those in the northern Hill End Trough (Hargraves, Hill End,

    Jan 1, 2008

  • AUSIMM
    Implementation of a High Energy Dissipation Ground Support Scheme

    By E Villaescusa, A Kusui, R Talebi, R Hassell, C Arcaro

    Northern Star Resources (NSR) operates several seismically active mines as part of its Kalgoorlie Operations. In order to successfully continue mining at depth in increasing stress conditions, strateg

    Mar 15, 2021

  • AUSIMM
    Development and Implementation of Spin-to-stall Resin at Anglo American’s Australian Underground Coal Operations

    By P Craig, I Canbulat, J Naylor, J Emery, A Sykes

    Longwall mining is by far the most common method of underground coal extraction in Australia. Industry trends and expectations are placing increasing emphasis on the reliability and productivity of th

    Nov 5, 2014

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Exploring Optimised Delay Timing for Fragmentation

    By C K. McKenzie

    As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened

    Nov 8, 2011

  • AUSIMM
    Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditions

    By S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli

    The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req

    Nov 8, 2021

  • AUSIMM
    Methane Drainage in Underground Coal Mines in China

    By Boshou B

    In China, there are approximately 3,000,000 million m3 of gas (methane) included in highly gassy mines liable to coal/gas outbursts; the amount of methane pre-drainage possible is estimated at 400,

    Jan 1, 1988