Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Reserves Estimation For Copper Orebodies At Mount Isa Mines Limited

    Ore Reserves estimation for the two producing copper orebodies at Isa Mine, Mount Isa, Queensland is discussed. The principal estimation techniques used and discussed are first, a computer based in

    Jan 1, 1979

  • AUSIMM
    Road to Recovery - Metallurgical Improvements at Brunswick Mining and Smelting Corporation Limited

    Brunswick Mining and Smelting Corporation Limited operates a large base metal property near Bathurst, New Brunswick in eastern Canada. Nominal capacity for the underground mining operation and conce

    Jan 1, 1993

  • AUSIMM
    Some Variations in the Bulli Seam

    The Bulli Seam, New South Wales, cenprises middle to high rank bituminous coal, generally of coking quality. It is worked over an area embracing 300 square miles.Variations in several factors are pres

    Jan 1, 1963

  • AUSIMM
    Assessment of Rock Slope Stability Using the Rock Mass Rating (RMR) System

    The Rock Mass Rating (RMR) and Rock Mass Strength (RMS) classification systems for jointed rock masses are briefly reviewed, with particular reference to their use in slope stability studies. A correl

    Jan 1, 1992

  • AUSIMM
    Water Management to Protect Wetland to the North of the Rhenish Lignite District

    By Trumpff H

    Opencast Lignite Mining requires topwall strata of seams to be fully depleted and footwall aquifers sufficiently depressurized. To prevent a spread of the cone of depression into protected wetlands

    Jan 1, 1988

  • AUSIMM
    Slot Stopping At Bold Head Mine, King Island Scheelite

    By Snowden C. T

    B Lens Main is a scheelite orebody with an average dip of approximately 15¦ and thickness ranging from 1.5 to 6.0 m. The orebody is overlain by a banded section of ore and waste which tends to slab

    Jan 1, 1977

  • AUSIMM
    Pressure Filtration of Weipa Kaolin

    Extensive reserves of kaolin of the type suitable for use as a high quality paper coating exist on the Weipa Peninsula. In 1986 a commercial processing plant was constructed to produce 100 000 tonn

    Jan 1, 1989

  • AUSIMM
    Tunnelling in Archaean Rocks of the Darling Range, Western Australia

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976

  • AUSIMM
    The Changing Influences on the Economics of Developing New Underground Coal Mines in New South Wales

    This paper examines the cost and economic consequences of varying a number of key factors in the course of developing and operating new underground longwall coal mines with both shallow and deep cov

    Jan 1, 1988

  • AUSIMM
    Take 5 – hero or villain

    By M Hassall, E Humphries

    Personal risk assessment processes, also known as Take 5 or SLAM (Stop, Look, Assess, Manage) have been utilised in high hazard industries for over 30 years. However, there is limited research to unde

    Apr 16, 2024

  • AUSIMM
    The Inclusive Management of Operating Risk, Efficiency and Organisational Dynamics at the Cosmo Howley Mine

    By Johnson G. D

    The typical management systems used to address the issue of operating risk centre around technologies that identify, analyse and evaluate the risk factors. These logical systems such as HAZOPs, Faul

    Jan 1, 1994

  • AUSIMM
    Resource and Geoscience Modelling for Exploration and Land Use Planning in NSW: The Mineral Resource Audit

    By Barnes R. G, Agostini A, Lewis P. C

    The Mineral Resources Audit is a five-year Program established to produce a comprehensive and objective assessment of the mineral resources of New South Wales, including prospective resources. The

    Jan 1, 1995

  • AUSIMM
    A New Mining Method For Thick Seam Coal Mining

    By O. J. RICHARDS

    The Wongawilli system of mining has been in use for over 30 years and has enabled high production rates and acceptable extraction ratios to be achieved in seams less than 4 m in thickness. A modifi

    Jan 1, 1980

  • AUSIMM
    Strategic Production Planning - The Economics of Managing Multiple Ore Sources

    Kambalda Nickel Mines (KNM) currently have eight operating underground mines, three on care and maintenance and other orebodies at various stages of development. Each operation differs greatly in sc

    Jan 1, 1995

  • AUSIMM
    Spoil Pile Instability with Reference to the Goonyella Mine, Queensland

    The characteristics and causes of the spoil pile failures at the Goonyella Mine are described, and research results from investigations of spoil pile instability are discussed. Some effects on spoil

    Jan 1, 1981

  • AUSIMM
    Underground Mining at the Cadjebut Joint Venture

    By McGuckin P. H

    The Cadjebut orebody is a MississippiValleyType (MVT) zinc-lead deposit, and is located approximately 80 km southeast of Fitzroy Crossing in the Kimberley region of Western Australia. It is one of fiv

    Jan 1, 1992

  • AUSIMM
  • AUSIMM
    Partnering in Joint Ventures - Major vs Minor

    A mining joint venture presents a real management challenge to achieve harmony with the other participants in the successful development and operation of a mine. This can best be facilitated by a

    Jan 1, 1997

  • AUSIMM
    A Review of the Influence of Gas Pressure on Block Stability during Rock Blasting

    Blasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there

    Jan 1, 1999

  • AUSIMM
    Dump Leach Operation at Wiluna Western Australia

    General Gold was discovered in quartz veins at Wiluna in 1896, and the first lode was discovered in 1904. Since 1896, some 2.5 million ounces of gold have been produced from the Wiluna area. The min

    Jan 1, 1994