Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin Tunnel

    By Fukuichi K, Matsukawa H, Nakagawa M

    The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac

    Jan 1, 1987

  • AUSIMM
    Mobile Crushing/Sizing Systems for Modern Open Cast Mining - A Case Study of Mae Moh Phase 5 Project, Thailand

    By R Bunduwongse

    The oil crisis had repercussions throughout the world and most importantly on mining, where the drive to reduce the use of liquid fossil fuel led directly to the appearance and subsequent growth in th

    Jan 1, 2007

  • AUSIMM
    No. 3 Ventilation Shaft: Shaft-Sinking Equipment

    With the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink

    Jan 1, 1957

  • AUSIMM
    An Integration of Short-Term Planning with Mineral Processing Simulation

    By F D Durao, Muge F. H, Rogado J. Q

    In the scope of the project named CAPUME II (EEC BRITE/EURAM contract - project MA2M-CT90,-0042(SMA)) for the development of an integrated mine planning system for underground mines, two of the main

    Jan 1, 1995

  • AUSIMM
    Leaching Behavior of Gold in Iodide Solutions

    By Qi P. H

    Gold dissolution can be achieved with a number of complexing ligands, all with varying degrees of stability. Processes based on the use of halogens have been known for many years. Beside providing t

    Jan 1, 1991

  • AUSIMM
    Production and Metallurgical Characters of Hollow Mining Drill Steel in Australia

    INDEX OF CONTENTS.1. Historical.2. Manufacture.3. Heat Treatment.4. Fatigue, Failures.5. Consideration of the Establishment o£ a Central Testing or Proving Station.HISTORICAL.Since the introducti

    Jan 1, 1947

  • AUSIMM
    Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

    By J Bower

    The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t

    Jan 1, 2009

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    The Application of Heavy-Media Separation and Static Dry Cleaning of Coal at the Broken Hill Pty. Co. Ltd. Steelworks, Newcastle

    By Martin C. H, Met B

    INDEX OF CONTENTS:1. Introduction, Explanatory; and Reasons for Coal Cleaning.2. Principles on which Coal Cleaning is based.3. Location of Broken Hill Proprietary Co. Ltd. Plant.4. Description of Proc

    Jan 1, 1946

  • AUSIMM
    The Great Artesian Basin ù Use and Sustainability

    By L M. Foster, J R. Kellett, G A. McMah

    The Great Artesian Basin (GAB) contains one of the largest reserves of fresh water in the world. The volume in storage is enormous, being estimated at nearly 65 000 million megalitres (ML). Developmen

    Jan 1, 2003

  • AUSIMM
    Elrington Colliery

    By Hindmarsh G

    The colliery is owned by the BHP Collieries Proprietary Ltd., the principal shareholders being the Broken Hill Pty. Company Ltd. and Hebburn Limited.It is situated due west of Newcastle and 6 south-ea

    Jan 1, 1935

  • AUSIMM
    Resin Bonded Bolting in French Coal Mines

    Roof bolting with resin bonded bolts has been developed extensively in French coal mines. There are three aspects of this development: 1. The reason for and the care used in the development of roof

    Jan 1, 1971

  • AUSIMM
    Practical Statistical Tools for Managers

    The correct design and effective operating strategies of metallurgical plants require a constant analysis of data gathered for process control, or for due accountability. Conventional, oldfashion stat

    Jan 1, 2002

  • AUSIMM
    Improved Jarosite Process

    By BTrubT M

    In the roast-leach-electrolysis process for the production of zinc, iron contained in zinc concentrates is converted to zinc ferrite during roasting. At Canadian Electrolytic Zinc (CEZinc), the Outo

    Jan 1, 1993

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Mining Operations at Que River

    The Que River Mine is a small under-ground base and precious metals mine located in north-western Tasmania. Current production rate is 220,000 tonne/yr from reserves grading 0.37% copper, 7.1% lead, 1

    Jan 1, 1985

  • AUSIMM
    The Path to Successful Roof Support Automation

    The first hydraulic roof supports were installed underground in 1950s and ever since that time engineering developments have improved the supports in many different ways. However. advances in three ma

    Jan 1, 1991

  • AUSIMM
    Natural Rehabilitation of Shag River Catchment, East Otago, After Historic Gold Mine Tailings Discharges

    By A Black, J H. Youngson

    At least 85 000 tonnes of mine tailings were discharged into Deepdell Creek, east Otago between 1890s and 1940s. The tailings contained about 1 wt % arsenic, so about 850 tonnes of arsenic in the form

    Jan 1, 2004

  • AUSIMM
    Selective Mining Techniques - Telfer

    The Ok Tedi Project has been planned as a selective mining operation since the Feasibility Study. The nature of the orebody, and the need to 'stage' the infrastructure buildup meant that ini

    Jan 1, 1986

  • AUSIMM
    Integrated Whaleback Planning and Scheduling System

    Various software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback o

    Jan 1, 1986