Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Fluidsied Bed Technology to Reduction of Australian Mangansse and Iron Ores

    By Brent A. D, Olsen a. H, Mayfield P. L J, Grazier P. E

    Concentrates produced from MnO2 and Fe203 ore fines have been targeted as potential feedstocks for direct metallurgical processing. Prereduction of pyrolusite-rich Mn02 sands to MnO has been investi

    Jan 1, 1995

  • AUSIMM
    Debismuthising of Lead at the Bhas Lead Refinery, Port Pirie

    By Waters CA, Happ JV

    The debismuthising plant, commissioned in 1980, is based on the Kroll-Betterton process for preliminary bismuth removal with subsequent antimony treatment for fine debismuthising. Bullion flowrate is

    Jan 1, 1985

  • AUSIMM
    Investigations into the Removal of Airborne Pollutants From Underground Ventilating Air in a Deep Hot Mine

    By T J. Sheer

    The removal of airborne pollutants from underground ventilating air is discussed. The work concentrates on the removal of CO, CO2, NOx, SO2, radon gas and respirable carbon particles. The investigatio

    Jan 1, 2005

  • AUSIMM
    Numerical Modelling of Coal Spontaneous Combustion With Moisture Included

    A mathematical model for spontaneous combustion of coal with moisture included is presented in this paper. The one-dimensional unsteady state model consists of conservation equations for oxygen, water

    Jan 1, 2005

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Blasting at Shallow Depths: Problems and Improvements

    Rock formation at shallow depths is generally associated with complex geology consisting of many joints, fractures, bedding planes, etc. Fragmentation results from primary blasts in such strata are

    Jan 1, 1995

  • AUSIMM
    Aspects of Mineralisation in the Herberton/Mount Garnet Tinfield, North Queensland, Australia

    By Cuff C, Taylor RG, Georgees C

    Mineralisation adjacent to Herberton occurs within three main subcentres. The Her- berton Hill subcentre is characterised by the association of Sn,W the Herberton Dividing Range South subcentre by S

    Jan 1, 1978

  • AUSIMM
    A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field Observations

    By B Belle

    "Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard

    Jun 1, 2012

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    Three Dimensional Numerical Modeling of Effects of Subsidence on Escarpments

    By McNabb K. E

    Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing emp

    Jan 1, 1992

  • AUSIMM
    The Development of Pyritic Smelting: An Outline of its History

    There is a well-known saying, variously attributed to the great King Solomon and other sages of antiquity, to the effect that 'there is nothing new under the sun'. The inventive genius of ma

    Jan 1, 1994

  • AUSIMM
    Paper No. 188. A Graphic Method of Computing Mine Values.

    THOSE who have had occ.asion to sample a mine not infrequently find that it is impossible to take their sample cuts at regular distances apart, owing to the ground being close timbered, a stope having

    Jan 1, 1911

  • AUSIMM
    Economical and Environmental Operation of Open Cut Mines

    Mining is a high risk, high capital and potentially high reward undertaking. A large proportion of the risk comes from a lack of definition of the orebody (which also provides some of the potential) a

    Jan 1, 2003

  • AUSIMM
    A New Texture Analysis Technique for Geometallurgy

    By K Nguyen

    The advances in computerised processors and digital microscopic imaging have enabled more studies that attempt to quantify textural information from rock images. However, a texture classification syst

    Sep 29, 2013

  • AUSIMM
    Structural Permeability in the Southern Alps Hydrothermal System, New Zealand (b33e2a07-1d4d-4c30-8bdf-80361ff1f843)

    By Craw D

    The Southern Alps in the South Island of New Zealand are currently rising rapidly as a consequence of continental collision along the Pacific-Australian plate boundary. Rapid uplift has resulted in a

    Jan 1, 1995

  • AUSIMM
    Surface Reactivity of High-Sulfide Copper Mine Tailings Under Shallow Water Cover Conditions

    By A D. Paktunc

    The surface reactivity of underwater deposited, high-sulfide copper mine tailings was evaluated under fresh and saline water cover conditions by measuring the surface and pore water quality as a funct

    Jan 1, 2003

  • AUSIMM
    The Winner's Curse: Fact or Fallacy

    The theme of the conference this year is diversification. One way to diversify is through acquisition. The principle underlying the winner's curse is that in competitive bidding situations wher

    Jan 1, 1996

  • AUSIMM
    Developing the West Pilbara Iron Ore Project

    By K Watters

    API Management Pty Ltd (API) is currently developing the West Pilbara Iron Project (the ‘Project’). The Project is a substantial greenfi elds mining and infrastructure development proposed for the wes

    Jul 11, 2011

  • AUSIMM
    Automatic Tunnelling Method Using Quick-Hardening Resin Mortar

    Nippon Telegraph and Telephone Corporation (NTT) developed a new construction method (the M-2 method) that could drive a long, curved small-diameter tunnel (4>1.2 m) without human labor. This meth

    Jan 1, 1987

  • AUSIMM
    Why do Shareholders and Mining Executives Allow Mine Managers to Leave Behind High-Grade Broken Ore Underground?

    By K Biegaj

    The paper describes challenges the author has encountered on Australian underground gold and nickel mines over the last eight years, when recovering high-grade gold/nickel bearing mine floor material

    Mar 26, 2012