Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rock Mechanics as Applied in Philex Block Cave Operations

    The Sto Tomas II orebody of Philex Mining Corporation is a porphyry copper deposit located at Padcal, Tuba, Benguet, Philippines. It was mined through open pit method for the first two years starting

    Jan 1, 2000

  • AUSIMM
    North Mine - A Case Study

    By Terlich R. E, Finlayson J. M

    A combination of high virgin rock temperatures, deep workings and extensive utilisation of heavy diesel equipment has presented North Mine (A Division of North Broken Hill Limited) with challenging

    Jan 1, 1988

  • AUSIMM
    Direct Electrowinning of Lead from Lead Sulphide Concentrates

    By Siemon J. R

    It is possible to use compacted anodes formed at low pressure for the direct electrowinning of lead from sulphide concentrates. An anode containing 5.5 per cent graphite, formed into a compact at 34 M

    Jan 1, 1976

  • AUSIMM
    Mining Over 100 Stopes Per Year? ù The Perilya Broken Hill Approach to Mine Planning

    By C Mroczek, B Mitchell

    Perilya Broken Hill, from its inception, has budgeted for more than 2.0 million tonnes per year from the Southern Operations. This tonnage was planned to come from in excess of 100 stopes per year in

    Jan 1, 2005

  • AUSIMM
    Exploration in the Gippsland, Bass and Otway Basins

    Location & Permit Status Three major Mesozoic Tertiary basins exist along the continental shelf area of southeastern Australia, known as the Bass Strait area. They are the Gippsland (east of the long

    Jan 1, 1970

  • AUSIMM
    Recent Developments in Electrical Exploration

    The MIMDAS geophysical data acquisition system developed and tested by the former MIM Exploration Pty Ltd (MIMEX) is now commercially available worldwide through Geophysical Resources and Services Pty

    Jan 1, 2004

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Problems of Sampling and Assaying in Mesothermal Lode-Gold Deposits ù Case Studies From Australia and North America

    By M J. Nugus, S C. Dominy

    Mesothermal lode-gold deposits often pose problems during sampling because of their complex and erratic gold grade distribution, and the presence of coarse gold. Effective sampling and sample preparat

    Jan 1, 2003

  • AUSIMM
    The Development of a New High-Energy Absorption Mesh

    By G Giles

    One of the main tools used by mining operations to mitigate the risk of rock burst is the installation of a so-called ædynamic resistantÆ support system. Such systems are designed to absorb the impact

    Jan 1, 2008

  • AUSIMM
    The Diamond Search in Australia: Ications of a Mobile Prospection Unit and the Concept of Mineral-Geochemistry

    The B.R.G.M., through international experience gained over many years, has become very skilled in alluvial prospection, particularly for diamonds. The research laboratories within the B.R.G.M. have

    Jan 1, 1980

  • AUSIMM
    Plant and Process Design Improvements to Increase the Efficiency of Nickel Reduction at QNI

    By R Piper

    The Yabulu Nickel Refinery commissioned in 1974, processes lateritic ore via a modified Caron process to produce high quality nickel and cobalt products. The Greenvale orebody provided the sole source

    Jan 1, 2002

  • AUSIMM
    Timescale of Forming a Giant Porphyry Copper-Gold Deposit - Ok Tedi, Papua New Guinea

    By R F. Weinberg, R A. Armstrong, A G. Tomkins

    We investigated the duration of formation of the giant Ok Tedi porphyry copper-gold deposit in Papua New Guinea using zircon SHRIMP U-Pb dating. The intrusions that host the Cu-Au mineralisation have

    Jan 1, 2008

  • AUSIMM
    Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance features

    By W Malone, J Garrett

    FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d

    Sep 18, 2023

  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    Reconciliation at KCGM Fimiston Operation

    By T Berryman

    The Fimiston reserve is being depleted at the rate of one million ounces per year; most of which is processed by the Fimiston plant, with the remainder being stockpiled. As for most other large open c

    Jan 1, 2006

  • AUSIMM
    Recovery of Copper from Lean-Grade Ores and Intermediate Sources and a New Design of Anode Casting Arrangement for a Small Copper Refinery

    By Chowdhury P. J R, Biswas S. K

    Recovery of metallic values from lean-grade raw materials as well as from secondary/intermediate industrial products is of immense importance to a country like India which is not endowed with extens

    Jan 1, 1992

  • AUSIMM
    Adopting Quality Systems to Train Blast Crews and Control the Use of Explosives at Gunpowder Copper

    While, in the past, a great deal of attention has been focussed on technical issues and the performance of explosives in rock, the explosive user, an essential link in the chain, has often been negl

    Jan 1, 1995

  • AUSIMM
    Backfilling of Caved-in Goafs with Pastes for Disposal of Residues

    By W Schauenburg

    The increasing problems associated with the disposal of waste and the potential for use of by-products as underground filling material is a subject which is relevant not only to the coal-mining indust

    Jan 1, 1998

  • AUSIMM
    Dewatering Marra Mamba – Lessons Learned

    By K Sommerville

    BHP Billiton’s Area C iron ore operation has been in production since 2003. During 2010, below water table mining in the Marra Mamba formation commenced and dewatered ore has been successfully process

    Jul 11, 2011