Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ventilation At Depth At North Broken Hill Limited

    Autocompression and virgin rock tempera ture have a marked influence on the ventilation of the lower levels at North Broken Hill Limited N.S.W. To maintain comfortable working temp- eratures without

    Jan 1, 1977

  • AUSIMM
    A Zinc-Lead Ore Mine Water Contamination by a Paper Factory Fluid Waste

    By Motyka J, Adamczyk AF, Witczak S

    A case study of migration of a paper factory fluid wastes, on the distance of 5 km from an underground disposal site to an ore mine is presented. The ore mine in question, situated in SW Poland is

    Jan 1, 1988

  • AUSIMM
    Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt

    For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty

    Aug 21, 2012

  • AUSIMM
    The practical use of underground 3D photogrammetry data at MMG Rosebery polymetallic mine, Tasmania, Australia

    By M Robertson

    3D photogrammetry is a powerful tool for data capture and interpretation, utilised at all Australian underground MMG sites. In personnel constrained mines, 3D photogrammetry can free up personnel time

    Sep 20, 2017

  • AUSIMM
    Fundamental Limits for Recycling - Formulating Environmental Legislation on the Basis of First Principles

    By O Ignatenko, A van Schaik

    Environmental legislation for the process and manufacturing industries is frequently formulated without considering the fundamental limits of physics, chemistry and thermodynamics within process techn

    Jan 1, 2006

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • AUSIMM
    The Changing Commodity Supply Demand and Price Outlook

    At the outset, I guess we should define what we mean by "com- modities". In the 20 minutes or so which I have for this paper, it is impossible to tackle all commodities -one would need to con- sider

    Jan 1, 1988

  • AUSIMM
    Stable Isotopes and Ore Fluid Chemistry of Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New Zealand

    By C G. Ryan, D R. Cooke

    The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali

    Jan 1, 1999

  • AUSIMM
    Crust and Uppermost Structure of the Arc Regions of the West Pacific Islands

    Single station group velocities of fundamental made Rayleigh waves over the period range 15-100 s are carguted for five provincial profiles of the West Pacific. Based on recordings of earthquakes arou

    Jan 1, 1990

  • AUSIMM
    The Imperial Smelting Furnace-Hearth and Raceway Considerations

    Consideration is given to the factors affecting raceway activity and the hearth design of a zinc-lead blast furnace. Results of measurements made on operating furnaces are given and comparisons ar

    Jan 1, 1981

  • AUSIMM
    Process Control Applications in the Lead and Copper Smelters of Mount Isa Mines Limited, Mount Isa, Queensland, Australia

    By Pirvics AI, Whitworth NR, Tuppurainen JMI

    Process control applications to the unit operations in both the Lead and Copper Smelters are reviewed. The basic aim of this control is to smooth plant inputs to produce an output of consistent qu

    Jan 1, 1984

  • AUSIMM
    Nanisivik Mine - Operations and Innovations in a Arctic Environment

    By Sutherland R. A, Rawling K. R

    The Nanisivik Mine is located 750 km north of the Arctic Circle at the north end of Baffin Island in the Canadian High Arctic, and has been in production since 1976. The paper describes the regional

    Jan 1, 1993

  • AUSIMM
    U.S. Coal Mining Accidents And Seam Thickness

    By Thirumalai K, Peluso R. G

    The United States has more than 45 billion tons of economic coal reserves in seams above 10 feet thick and current underground production from thick seams represent less than three per cent of th

    Jan 1, 1976

  • AUSIMM
    Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem

    By M W. A Asad, E Topal, D S. S Sandanayake

    Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod

    Nov 24, 2014

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    The Association Of Tourmaline-Bearing Rocks With Mineralisation At Broken Hill, NSW

    Tourmaline-bearing rocks are a rare rock type of Suites 3, 4 and 5 at Broken Hill. Minor laminated plagioclase-quartz-tourmaline rocks occur in association with the quartz- magnetite rocks of Suite

    Jan 1, 1983

  • AUSIMM
    The Zinc Corporation Limited - Broken Hill

    The paper describes the 209 in. single stage axial flow mine ventilating fan which commenced operation at The Zinc Corporation Limited, Broken'Hill, N.S.W., in January, 1954.This fan is used to ,

    Jan 1, 1956

  • AUSIMM
    Developments in Ore Handling Methods at Mount Isa Mines Limited

    By Palmer C. G, Rowe P. G

    Ore handling improvements at Mount Isa Mines Limited were necessary to keep abreast of technological advances in all phases of sublevel stoping practice.In the early 1930s an efficient ore handling sy

    Jan 1, 1961

  • AUSIMM
    Shaft Sinking at the Cassidy Shaft Mount Charlotte

    By Doyle P, Mulroney D

    The Cassidy Shaft was sunk to access the Mount Charlotte and Reward Orebodies below the Flanagan Fault. The 1,184m deep shaft is concrete lined to 6.5m diameter for its full depth. The initial 590m wa

    Jan 1, 1985

  • AUSIMM
    Presidential Address 1984 - There are Also Small Mines

    My roots span four generations. My great grandfather, Christian Frederick Fisher, along with twenty-one others was drowned in the New Australasian mine disaster at Creswick in Victoria in 1882. My gra

    Jan 1, 1984