Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    Alternative Host Rocks for Archaean Gold Deposits: Nature and Genesis of Hydrothermal Gold Deposits, Kanowa, Western Australia

    About 20 percent of world gold production has been contributed by gold deposits in Archaean greenstone belts, of which ca 2100 tonnes of gold has been produced from Archaean greenstone belts in Wester

    Jan 1, 1984

  • AUSIMM
    Review of Operations, Mount Isa Mines Limited, 1952-1960

    During the past eight years a vigorous drilling campaign resulted in large increases in the reserves of both copper and silver-lead-zinc ores.As a result the Company initiated an increased production

    Jan 1, 1961

  • AUSIMM
    Financial Modelling with the Auditor in Mind

    By S G. Gemell

    "The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing

    Mar 8, 2016

  • AUSIMM
    Recoverable Resource Estimation - A Comparison Using Constrained and Unconstrained Geology Models - Anwia Gold Deposit

    By D Clarke, R Simpson

    The Main lode in the Anwia Gold deposit is difficult to interpret due partly to the fact that three separate grid and drill hole orientations exist over the area and partly due to a lack of understand

    Jan 1, 2006

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel Operations

    By Reichman J. P

    Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a

    Jan 1, 1973

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021

  • AUSIMM
    Statistical Analysis of Dragline Monitoring Data

    By Baafi E. Y

    Dragline monitoring systems are normally the best tool used to collect data on the machine performance and operational parameters of a dragline operation. This paper discusses results of a time stud

    Jan 1, 1998

  • AUSIMM
    Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WA

    By McBride N

    Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us

    Jan 1, 1995

  • AUSIMM
    The Development of Hunter Valley Coal Preparation Plant

    By White PJ, Worrad C

    The Hunter Valley Coal Preparation Plant and associated materials handling facilities commenced operation in mid 1982. The new plant and coal handling system were designed to integrate with existing m

    Jan 1, 1985

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro Extension

    By L Nagy, K P. Juhasz

    The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi

    Sep 17, 2014

  • AUSIMM
    The Adsorption and Desorption of Aurocyanide from Activated Carbon

    This monograph presents a unified theory of adsorption and desorption of aurocyanide on activated carbon. This theory has proved useful for CIP/CIL carbon adsorption and Zadra and AARL elution proc

    Jan 1, 1991

  • AUSIMM
    Progress Towards the Heap Bioleaching of Chalcopyrite

    By P D. Franzmann, D J. Readett, J Peterse

    A better connection between laboratory- and pilot-scale test results, and heap bioleaching performance can be achieved by generating reliable information on the fundamental microbial, chemical and phy

    Jan 1, 2004

  • AUSIMM
    Extending Information from Coal Bore Cores

    A description is given of a detailed examination of a coal bore core and of attempts to predict properties of equivalent "as-mined" coal using the bore core data so obtained. The accuracy of the pr

    Jan 1, 1972

  • AUSIMM
    Fluid Inclusion Insights into the Origins of Fluids and Metals in Porphyry Copper Deposits

    By A H. Hofstra, G P. Landis, P Emsbo, A G. Hunt

    Models of the evolution of the hydrothermal systems that form porphyry Cu (Mo-Au) deposits are compromised because aqueous magma-derived fluids in the ore zones of most deposits have changed from thei

    Jan 1, 2008

  • AUSIMM
    Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value Chain

    By D Smith, A Ramdhani, J Francke

    Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement

    Aug 18, 2014

  • AUSIMM
    Successful Risk Management Through Project Life Cycle for Removal of the Crown Pillar at the Marvel Loch Underground Mine

    By S C. Barrie

    St BarbaraÆs Marvel Loch operations have successfully used longhole open stoping as the primary mining method for a number of years. A transition to Core and Shell mining was implemented in 2009 to re

    Nov 20, 2012

  • AUSIMM
    Mathematical and Physical Simulation of Non-Uniform Liquid Drainage in Packed Beds

    By Pinczewski WV, Nowak LP, Tanzil WBU, Jenkins DR, McCarthy MJ

    An experimental and theoretical study has been made of the drainage behaviour of two-dimensional packed beds drained from an outlet in the sidewall of the bed in order to identify the fundamental m

    Jan 1, 1981