Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Refining Metals with Sulphur

    ecent work on decoppering lead is reviewed; CuS is formed rapidly even from dilute solutions of copper in lead. he mechanism of decoppering is discussed, and an explanation for the retention of metal

    Jan 1, 1970

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    A Historical Perspective of the Application and Success of Geometallurgical Methodologies

    By S R. Williams

    There is a sense of geometallurgy being new; a new methodology for mining project development and improved operational strategy. One of the main challenges that any ænewÆ technology faces is a validat

    Sep 29, 2013

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Ni Laterite Mineralogy and Chemistry – A New Approach to Quantification

    By M A. Wells

    A new approach to more reliably predict the Ni (and Fe, Mg) composition of Ni laterites was tested for RC samples from the (siliceous) oxide–style, Siberia North deposit, Kalgoorlie Nickel Project (KN

    Sep 5, 2011

  • AUSIMM
    Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology Assessment

    By C Harwood, EáWestman, K Luxbacher

    Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame

    Jul 1, 2013

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Wall Control Blasting

    By D P. Blair

    There are two major aspects to wall control blasting – the potential for any blasthole to cause wall damage and the potential for a delayed sequence of blastholes to cause damage. The damage potential

    Aug 24, 2015

  • AUSIMM
    Investigation of flotation behaviours of fine particles in a complex ore consisting of various copper minerals

    By K Aikawa, M Ito, K Mitsuhashi, Y Ebisu, J V. Satur, I Park, N Hiroyoshi, T Suto

    Copper concentration using flotation is becoming more difficult, because of an increase in ore complexity accompanied by smaller grain sizes of copper minerals than usual, requiring finer grinding in

    Aug 24, 2022

  • AUSIMM
    Exergy - A Useful Indicator for the Sustainability of Mineral Resources and Mining

    By A Valero, G M. Mudd

    There is active debate and research around the most suitable indicators to assess the sustainability of mining. The most common approach is to report a range of data for a given mine site (or less pre

    Jan 1, 2009

  • AUSIMM
    The Golden Mile – 125 years of mining and the challenges posed for today’s mine geologist

    By M Watson, A V. Engelbrecht, E Murray-Hayden

    Whereas mine reconciliation is a well-established month-end process for most modern mining operations, the resource sector has yet to endorse uniform reporting factors against which model accuracy and

    Mar 22, 2022

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine

    By K Rees

    In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow

    Mar 26, 2012

  • AUSIMM
    Is Measuring pH Enough?

    By J Kinal, I Mitchell

    Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased

    Jan 1, 2006

  • AUSIMM
    Risk Assessment Models for Post-Mining Land Use

    By C Smith, R I. Maczkowiack, P D. Erskine

    Open cut coal-mining has been conducted in the Bowen Basin region of central Queensland for almost five decades, and has disturbed an estimated area of 140 000 ha of agricultural land until 2011. Appr

    Jul 10, 2012

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    Improving Raw Water Use Efficiency at Endeavor Mine, Cobar - A Case Study

    By R Bresca, A McCallum, J Scealy

    The Endeavor Mine, located to the north of Cobar, New South Wales, was purchased by CBH Resources Pty Ltd in September 2003. The operation has been producing lead and zinc concentrate continuously for

    Jan 1, 2006

  • AUSIMM
    Receiving Environment Monitoring Programs - Making the Most out of Biological Indicators and Direct Toxicity Assessments for Monitoring of Aquatic Ecosystems

    By L Thorburn

    In 2009, the Queensland Government developed a series of amendments to environmental authorities (EAs) for mines throughout the Fitzroy Basin in response to studies that assessed the cumulative impact

    Nov 26, 2013

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014