Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Roof characterisation for hazard planning at Oaky North mine using geophysical data

    By B Vorster, T Medhurst, A Huey

    Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional

    Nov 29, 2022

  • AUSIMM
    Using Independent System Simulation to Mitigate Risk in the Dalrymple Bay Coal Chain

    By B Olsson, B Reynolds, R Norman

    An unprecedented growth in demand for coal exports has placed pressure on multi-user coal chains to guarantee that their capacity expansion projects will meet the required demand. These projects, howe

    May 24, 2012

  • AUSIMM
    Thin spray liners for face support at Kanmantoo

    By B Roache

    Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers

    Mar 29, 2023

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Comparison of two and three‐dimensional seepage analysis in tailings dams – a case study

    By N Yarahmadi

    Characterization of pore pressure is critical for appropriate design of tailings dams. Furthermore, if seepage rates through tailing embankments increase unexpectedly or become uncontrolled, undesirab

    Jul 1, 2021

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012

  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    The synergistic interaction between hexanol and dithiophosphate at the air-water and galena-water interface

    By D Pienaar, B McFadzean, C T. O’Connor

    Collector and frother molecules in sulfide mineral flotation are thought to have separate roles in the flotation process, where the collector selectively hydrophobizes the mineral surface and the frot

    Aug 24, 2022

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    A Review of the Applications of Tunnel Boring Machines in Mines

    By Q Gong, J Li, J Zhao, Y Zheng

    Excavation by tunnel boring machines (TBMs) offers many advantages over conventional excavation methods, in terms of safety level, working environment, advance rate and overall cost. While TBMs have b

    Sep 17, 2014

  • AUSIMM
    Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustment

    By Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li

    The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit

    Jun 19, 2024

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    Boiler Water Treatment

    The Sons of Gwalia Mine in Western Australia is situated about 140 miles north from Kalgoorlie in arid country, where supplies of fresh water are difficult to obtain.Mine salt water is used throughout

    Jan 1, 1927

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • AUSIMM
    Geology and Discovery of the Que River and Hellyer Polymetallic Sulphide Ore Bodies Tasmania

    The Que River and Hellyer polymetallic massive sulphide ore bodies are located 3 kilometres apart in the Cambrian Mount Read volcanics of Western Tasmania. Both deposits are classic examples of the

    Jan 1, 1988

  • AUSIMM
    Calibration of post blast gas simulation using mine site readings

    By F C. D Michelin

    Blast fumes are a significant health risk to underground workers, containing several dangerous gases such as carbon monoxide (CO), nitrogen oxides (NOx) and ammonia. To ensure safe working conditions,

    Oct 12, 2022

  • AUSIMM
    Selecting Suitable Methods for Treating Mining Effluents

    During operations, mining and metallurgical processes may generate effluents such as tailings water, acid mine drainage (AMD) and seepage and process acid streams. Depending on the type of ore and the

    Jan 1, 2006

  • AUSIMM
    Oxidative Dissolution of Nickel Sulphide Precipitated from a Nickel Refinery Waste Stream

    By Dyson NF

    Nickel sulphide precipitated from waste liquors at the Yabulu plant of Queensland Nickel Pty Ltd was pressure leached under various conditions. Leaching at 130¦C and 700 kPa of air dissolved 95 pe

    Jan 1, 1984

  • AUSIMM
    Performance and Acceptance Testing of Mine Refrigeration Plants

    There is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati

    Jan 1, 2005

  • AUSIMM
    Mechanisms on the impacts of basicity on hydrogen-rich gas-based direct reduction of pellets

    By J Pan, C M. Tang, D Q. Zhu, C C. Yang, S W. Li, Z Q. Guo

    The short process of electric furnace steelmaking with direct reduction iron (DRI) as raw material is an important process for smelting high-quality and special steels. In order to prepare high-qualit

    Sep 18, 2023