Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018

  • AUSIMM
    Gold-Silver Vein Mineralisation at Cononish, Scotland

    By I M. Platten, C J. S Sangster, Y Xie, S C. Dominy

    Cononish is a steep, narrow NE-SW trending vein system that was emplaced into late Proterozoic metasediments. It shows brittle style deformation and postdates metamorphism and associated Caledonian fo

    Sep 26, 2013

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek Project

    By J Edman, RáBeamish, G Cambourn, B Beamish

    Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola

    Jul 1, 2013

  • AUSIMM
    Ventilation considerations and modelling of lithium battery fires inunderground mining

    By C M. Stewart

    Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for

    Oct 12, 2022

  • AUSIMM
    Power Development at Mount Isa Mines Limited

    The development of Mount Isa Mines Limited power supply is traced through the history of the mine operations. As would be expected, growth of the power supply system follows closely the increase in mi

    Jan 1, 1961

  • AUSIMM
    Origin of Witwatersrand Gold - A Viable Source Region and Source Process for Gold

    By G N. Phillips

    No new goldfields have been found in the Witwatersrand Basin for over 60 years, and one consequence of this is a long-term decline in gold production. Exploration throughout this period has been based

    Sep 26, 2013

  • AUSIMM
    Designing User Interfaces for the Mines of the Future – User Centred Approach

    By E Widzyk-Capehart

    The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed

    Nov 22, 2011

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • AUSIMM
    Integrated Expert Control System for Grinding and Flotation

    By Jarvensivu M, Ylinen R, Jamsa-Jounela S-L

    The paper presents a new integrated system for control of concentration processes. The system is based on cluster-based modelling taking the ore quality into account and a new on-line particle size

    Jan 1, 1993

  • AUSIMM
    Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered Rock

    By S Kowalczuk, S V. L Barrett

    The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to

    Sep 17, 2014

  • AUSIMM
    Research Needs in Regard to Design, Performance Criteria, Construction, Maintenance Assessment and Repair of Coal Mine Seals

    Legislation introduced for Queensland and New South Wales Coal mines provides different levels of prescription regarding specification of mine seals û generally in relation to capacity to withstand ov

    Jan 1, 2005

  • AUSIMM
    Application of High Efficient Fine Screen to Improve the Recovery of Tin Concentrate

    By W N. Qin, B Zhang, W Z. Huang, X S Mo

    Mengzi Mining and Metallurgy Co, Ltd (MMMC) polymetallic ore contains recoverable amounts of tin, lead, zinc, pyrite and other valuable minerals. With the change in orebody, the run-of-mine (ROM) ore

    Sep 1, 2014

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    Water ù The New Precious Resource: Planning, Management and Allocation Queensland-Style

    By G Milligan

    This paper describes how water is being planned, managed and used in Queensland as both a precious natural resource, vital for healthy ecosystems, and as a valuable tradeable commodity, necessary to s

    Jan 1, 2003

  • AUSIMM
    Development of a Submerged Injection Process for the Production of DoreÆ Silver at BHAS

    By Swayn G. P, Floyd J. M

    BHAS, together with the G.K. Williams Laboratory, and Ausmelt Pty. Ltd., has examined a number of possible alternatives to conventional silver cupellation in gas fired reverberatory furnaces. Of th

    Jan 1, 1989

  • AUSIMM
    Mining Scenario Analysis and Mine Variable Value

    By B E. Hall, J Poniewierski, A J. Hills

    Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea

    Mar 24, 2014

  • AUSIMM
    Monitoring Sb in lead refining using advanced techniques in Industry 4.0

    By S Zummar, A Van den Bulck, T De Staercke, T Van Rompaey

    An increase of 22 per cent in lead usage is expected in the European Union by 2050. During lead refining, the Harris process is a critical step in which a salt melt is used to remove arsenic, tin and

    Aug 21, 2024