Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Economically Mineable Resource in an Underground Metalliferous Mine

    By Bell I. F

    In 1985, ZC Mines (now Pasminco South) had been unprofitable for some years due to a combination of high operating costs, low metal prices, low head grade and an aging and inadequate mining infrastr

    Jan 1, 1992

  • AUSIMM
    The Role of Geology and Exploration Within the Mining Cycle at the Osborne Mine, NW Queensland

    By P Voulgaris

    The Osborne Mine commenced production from an open pit in December 1994 with the first ore being hauled from underground one year later. Currently all ore is hauled up a decline by trucks until the sh

    Jan 1, 1998

  • AUSIMM
    The Innovative Financing of the Australian Gold Industry

    By White A. H, Gillies A. D S

    In recent years the Australian gold industry has gone through a major expansion phase. The need for finance has led to adoption of different approaches such as the well known gold loan, forward sell

    Jan 1, 1994

  • AUSIMM
    The McArthur River Project

    By Kareise G. J, Leung K

    The McArthur River (HYC) deposit, located in the Northern Territory of Australia, was discovered by Mt Isa Mines Limited geologists in 1955. It is one of the largest sedimentary stratiform zinc-lead

    Jan 1, 1993

  • AUSIMM
    Global Extraction Sequences in Sublevel Stoping

    A review of the most widely used global extraction sequences in sublevel is undertaken. The review includes techniques used to extract massive as well as single or multiple steeply dipping tabular ore

    Jan 1, 2003

  • AUSIMM
    Possible Impact of New Safety Technology Developments on the Future of the United States Mining Industry

    The future of the United States (US) mining industry will be affected greatly by recent coal mining disasters. These have resulted in new legislation which will have an impact on mining economic costs

    Jan 1, 2008

  • AUSIMM
    Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium melts

    By M A. Rhamdhani, R Z. Mukhlis

    Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,

    Aug 21, 2024

  • AUSIMM
    Reconstruction of Morphetts Enginehouse, Burra

    Burra was the largest metalliferous mine in Aus- tralia between 1845 and 1860 and employed as many as 1000 men and boys. The workforce was predominantly Cornish, Burra being the first con- centratio

    Jan 1, 1987

  • AUSIMM
    Effects of Shear on the Behaviour of Polymer-treated Slurries

    By D Reid, A Fourie

    The in-pipe treatment of slurries with polymer addition shortly prior to deposition is a noteworthy emerging technology of increasing popularity. Although polymer treatment has been shown to substanti

    Jul 27, 2015

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    The Thalanga Massive Sulphide Deposit

    By Hartley JS, Wills KJA

    The Thalanga massive sulphide deposit is hosted by Upper Cambrian rhyolites and volcaniclastics of the Mt. Windsor Volcanics near their contact with overlying dacites, rhyolites and sediments of t

    Jan 1, 1987

  • AUSIMM
    Life on the Rollercoaster - Mining and Milling the Kencana K1 Orebody, Indonesia

    By R Benton

    Since commencement of underground production in March 2006 the Kencana K1 orebody has delivered over 0.9 Mt of ore containing 1.18 Moz Au until April 2009. The Kencana deposits are part of the Gosowon

    Jan 1, 2009

  • AUSIMM
    Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage Facility

    By K Brand, M J. Ind, M Rynhoud

    Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca

    Jun 28, 2016

  • AUSIMM
    A Dynamic Ore Reserve Calculation and Accounting System for a Stratiform Orebody

    By Jaczkowski B

    The lower orebody (LOB) at Chingola Divi- sion of Nchanga Consolidated Copper Mines Limited (NCCM) accounts for approximately 30 per cent of the total copper production for the company. The uniform

    Jan 1, 1977

  • AUSIMM
    Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited

    The Kennedy Siltstone Open Cut provides graded rock for stope filling. Rotary drilling of 310 mm blastholes with a Gardner Denver GD120 is used, and the successful application of an equilateral tri

    Jan 1, 1978

  • AUSIMM
    Engineering the New Olympic Dam Backfill System

    By A G. Grice

    WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur

    Jan 1, 2000

  • AUSIMM
    Advances in Theory and Application of Non-Electric Initiation Systems to 60 Series Extraction at the Mount Lyell Copper Mine

    By Duniam P

    Sequencing of large underground firings is a critical aspect of blast performance. Using theory developed in open cut operations, where blast results are easier to quantify, a new technique for sequ

    Jan 1, 1995

  • AUSIMM
  • AUSIMM
    Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area

    By K P. Tully

    In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf

    Jan 1, 1998