Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand ContextBy E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
The R W Miller Mount Thorley Project 1976û1986For over 50 years R W Miller & Co Pty Ltd operated old coal properties abandoned by former owners as uneconomic, some of which dated back to the last century. The companyÆs ability to survive with wha
Jan 1, 1998
-
Case Study of Installation of Compact Bucket Wheel Excavators on Ironsands at N.Z. SteelBy Hogan C. J
The compact BWE system set up in 1984 to mine ironsand dunes and the underlying ironsand-clay has been an effective high volume produc- tion unit for New Zealand Steel Mining Ltd at the Waikato North
Jan 1, 1989
-
Reverse Sensitivity - A Two-Way Street, Not a Dead EndReverse sensitivity is a critical issue for all extractive activities. Extractive industries can only establish in the location of the particular resource sought to be extracted. Avoiding a location n
Jan 1, 2006
-
Mining Administration and LegislationThis paper discusses some topical issues on the mining administration and legislation fields including: 1. Licensing û Administration and associated specialist functions including:Processin
Jan 1, 1982
-
Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging JuniorBy H Fletcher
Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P
Jul 11, 2011
-
Dewatering the Bowmans Trial PitBy Waterhouse J. D, Harris B. M
This paper briefly describes the construction in 1979/80 of a 70m deep trial open pit coal mine near Bowmans S.A. and describes more fully the hydrogeological aspects of the exercise. The primary p
Jan 1, 1981
-
Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales ContractsBy J Zhang, R Dimitrakopoulos
A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s
Nov 24, 2014
-
A SAG Mill Circuit Simulator Based on a Simplified Mechanistic ModelBy Magne L, Barria J, Castro O, Menacho J, Gonzalez GD
An extensive experimental campaign was developed in a continuous 6 x 2' (D x L) pilot scale SAG mill. The effect of the feed flow rate, feed solids concentration, ball filling fraction and feed
Jan 1, 1993
-
Integration of Mine Planning with Groundwater Modelling to Optimise Mine Closure Plans at the Marillana Creek (Yandi) MineBy K Rozlapa, P Waters, H Middlemis
A major challenge for closure planning at mining operations below the water table is evaporation from final void pit lakes and concentration of salts, which can impact on downstream groundwater (and s
Jan 1, 2006
-
Processing Options for Phosphate Oreswith High Fe and Al ContentsThe prospect of utilization of phosphate ores which contain high P205 values associated with Al and Fe has produced a great deal of interest over many years. Processing options have generally been bas
Jan 1, 1990
-
Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper MineBy K Myers
Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg
Jan 1, 2003
-
The challenges of removing sulfur from magnetite ores to meet direct reduction specificationsBy D Connelly
Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial
Sep 18, 2023
-
Initial Testing of the Fastflot Process at Pasminco Mining - Broken HillBy Stephenson D. B, Burgess J, Burgess F. L, Marshall S. H
A new high intensity flotation process 'FASTFLOT' is explained and its theoretical advantages compared with other flotation systems are discussed. The results of initial FASTFLOT testing o
Jan 1, 1994
-
Eight days entrapped – PT Nusa Halmahera Mineral’s rescue of a trapped minerBy A Hilli, K Kosmara, J Steyn
PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates two underground
Oct 16, 2017
-
Sustainable post-closure development – is it achievable?By P Scholtz
Sustainability is one of those fuzzy words like innovation: everybody has an idea what it means, but if one starts asking for concise definitions then it becomes clear that everybody puts their own nu
Jul 25, 2018
-
Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual
Jun 1, 2010
-
Improved Cleaner Circuit Design for Better Performance Using the Jameson CellBy R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro
In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily
Sep 1, 2014
-
The Behaviour of Barium, Strontium, Aluminium, Chromium and Molybdenum when Leaching Fly Ash with Acid Rock DrainageBy M BSckstr÷m
Acid rock drainage (ARD), commonly found in vicinities of sulfidic mines, possess properties capable of widely affecting the surrounding environment by acidification and heavy metal pollution. In most
Jan 1, 2008
-
Consideration for Multiobjective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to MarketBy J Balzary, A Mohais
Dynamic market and operating conditions, coupled with an environment in which multiple objectives and trade-offs are common, pose major challenges for planners and schedulers working in any mining ent
Nov 24, 2014