Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Presidential Address (b179f219-258b-42e8-92fe-9c28ebd7b814)

    As this is the first occasion I have had, and probably will be the only opportunity I shall have, of addressing such a large gathering of members and of student members of the Institute, I desire to-

    Jan 1, 1937

  • AUSIMM
    Bio-Oxidation of Arsenic and Stibium Bearing Gold Ores

    Bio-Oxidation of Arsenic and Stibium Bearing Gold Ores Bio-oxidation of arsenic and stibium bearing gold ores with acidithiobacillus ferrooxidans was studied. The preoxidation results show that the b

    Sep 13, 2010

  • AUSIMM
    Contacts

    This paper on the relation of Granite and Sedimentary Contacts to Victorian Mining will, it is hoped, be of interest to members of the Institute.The broad fact that gold often occurs' at or near

  • AUSIMM
    Electro-Flotation Research on Fine Cassiterite

    Electro-Flotation Research on Fine Cassiterite

    Sep 13, 2010

  • AUSIMM
    Some Operational Aspects of Heap Leaching at Rum Jungle

    An oxide ore heap (80,000 ton assaying 2 per cent copper) and a sulphide ore heap (300,000 ton assaying 1·7 per cent copper) are being leached in series in a closed circuit system. The ore is fri

    Jan 1, 1968

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AUSIMM
    Energy Efficient Ball Mill Circuit - Equipment Sizing Considerations

    By W Valery, A Jankovic

    The ball mill in closed circuit with hydrocyclones is an industry standard, and well known methodologies exist for equipment sizing, selection and design. However, the potential to improve the capacit

    Jul 15, 2013

  • AUSIMM
    The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism

    The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism

    Sep 13, 2010

  • AUSIMM
    Mineralization in Island Arcs with Particular Reference to the South-West Pacific Region

    Two outstanding features of the world's young orogenic belts are their very consistently developed suites of volcanic rocks and, it is now recognized, the rather distinctive types of mineralizati

    Jan 1, 1978

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • AUSIMM
    Notes on Use of Sulphites in Copper Flotation at the Rosebery Concentrator of Electrolytic Zinc Company of Australasia Limited

    Soon after the Rosebery concentrator commenced operations in 1936, an investigation was begun in an attempt to discover a substitute for cyanide in lead flotation. Cyanide is an excellent depressant f

    Jan 1, 1952

  • AUSIMM
    Cyanide - Myths, Misconceptions and Management

    Myths and misconceptions regarding cyanide in the mining industry are common. This is not surprising, given the other uses to which cyanide is, and has been put. Unfortunately, the economic benefits,

    Jan 1, 1997

  • AUSIMM
    Reply to Contributed Discussion (This Issue) by Gavin W. Clarke and Roger G. Taylor

    The additional information that Clarke and Taylor (1982) provide about the important but poorly documented Ardlethan deposit is, of course, very welcome. However their contention that structural consi

    Jan 1, 1982

  • AUSIMM
    The Use of Electric Current and Equipment for Domestic Purposes at Mount Lyell

    OWING to the gradual depletion of the hitherto plentiful supply of firewood in the immediate vieinity of Queenstown and Gormanston, which caused a steady increase in the cost of fuel for domestic purp

    Jan 1, 1927

  • AUSIMM
    The Firewood Supplies of the Gold-Fields

    At the inception of the gold-mining industry at Kalgoorlie the small supply of firewood required for steaming purposes was naturally all drawn from the limited local areas, which promised soon to beco

    Jan 1, 1901

  • AUSIMM
    Creative Tension: Environmental Issues and Resource Development

    All development proposals have to run the gauntlet of the approvals process. Major resource projects are generally subject to particularly intense scrutiny. The key element in the approvals process

    Jan 1, 1992

  • AUSIMM
    Study on Selective Reduction and Magnetic Separation of Low-Grade Nickel Laterite Ore to Produce High Nickel Concentrate

    Study on Selective Reduction and Magnetic Separation of Low-Grade Nickel Laterite Ore to Produce High Nickel Concentrate

    Sep 13, 2010

  • AUSIMM
    Application of Alluvial Gold Mineralogy to Exploration of the Central Ranges, Irian Jaya, Indonesia

    By K Palmer, G J. Artmont

    Alluvial gold is an ideal exploration tracer to bedrock source and indicator of bedrock mineralisation style because: (i) gold occurs in a wide range of deposit types, (ii) primary composition is sen

    Jan 1, 1995

  • AUSIMM
    Mount Morgan Limited Gold Clean-up Practice at Oxide Mill

    At the present time this plant is treating by direct cyanidation 1,000 tons of ore from Open Cut mining and dumps, and 1,200 tons of current flotation tailing obtained from the Sulphide Mill, per day.

    Jan 1, 1939