Search Documents

  • SME-ICGCM
    Characteristics of Seismic Field Generated by Bed Separation and Application Seismic Technique for Exploration of Bed Separation and Grouting Research

    By Jiulong Cheng

    Underground coal mining causes overburden deformation and failure, one major form of which is bed separation in the overburden. Surface subsidence can be controlled by injecting grout into the bed sep

    Jan 1, 2006

  • IOM3
    Leaching of Dominican gold ores in iodide-catalysed thiocyanate solutions

    By S. P. Ball, A. J. Monhemius

    In a laboratory study under acidic oxidising conditions, the thiocyanate system gave results at least as good as cyanide and considerably better than thiourea, with modest consumption of SCN (less tha

    Dec 1, 1995

  • SAIMM
    Airflow Fields Simulation On Passive Pulsing Air Classifiers

    By Y. He

    Early research showed that the separation of particles based upon their density was not possible in steadily rising air streams. The terminal velocities of moving spheres are determined by their aerod

    Jan 1, 2005

  • SAIMM
    Keynote Address: 6th International Symposium For Rock Fragmentation By Blasting

    By D. Diering

    Having agreed to perform this task, I naturally started to wonder what on earth I was going to talk about, and on reviewing the literature I was surprised at how little I knew and how much I?d forgott

    Jan 1, 2000

  • AUSIMM
    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator

    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator A plate assisted electrostatic high tension roll separator has been used for

    Sep 13, 2010

  • AUSIMM
    Machine learning to estimate fines content of tailings using gamma cone penetration testing

    By S McGregor, J Sharp, I Entezari, T Boulter

    The piezocone penetration test (CPTu) is one of the primary screening tools used by the mining industry to evaluate whether tailings are susceptible to liquefaction (static or cyclic). Liquefaction an

    Jul 1, 2021

  • SME
    The Lg-2 Underground Powerhouse

    By M. Rancourt, J. Levay, D. K. Murphy

    INTRODUCTION The LG-2 project is one element of the La Grande Complex, an integrated development of hydro-electric potential being constructed in north-western Quebec by the James Bay Energy Corpor

    Jan 1, 1976

  • NIOSH
    IC 8059 Bureau Of Mines Publications On Coal Preparation, 1910-60 ? Introduction

    By Albert W. Deurbrouck

    The percentage of coal cleaned mechanically has increased greatly in the past 30 years. This technological change in preparation methods, accompanied by mechanical innovations in most phases of coal m

    Jan 1, 1961

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013

  • ISEE
    Cap Precision in Perimiter Control Blasting and the Potential Application of Electronic Detonator

    By Derek T. Novotny

    Blasting cap precision is of major importance to advanced blast design. New technologies have introduced the use of microchips within detonator casings in the hope that the electronic control of the t

    Jan 1, 1998

  • NIOSH
    OFR-60-82 TDRM Testing

    By Eugene W. Bartel

    This report describes in detail the circuitry used in the Automated Time Domain Reflectometry System and the testing and modification done to the system to improve the units performance and consistenc

    Jan 1, 1980

  • DFI
    Influence Of Urbanization And Geology On Deep Foundation Design And Construction

    By Hiren J. Shah

    The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his

    Jan 1, 2011

  • NIOSH
    OFR-115-93 Application Of Cost Engineering To Determine The Optimum Production Rate For Waste Remediation Of Mine Tailings

    By Thomas W. Camm

    The U.S. Bureau of Mines has developed a system for estimating mining and processing costs as a function of process feed rate with the objective of applying this system to abandoned mine tailings and

    Jan 1, 1993

  • SME
    Back Injury Control Measures For Manual Lifting And Seat Design (713e5a18-b501-4cad-ba17-ce99f61f5c68)

    By S. Gallagher, A. Mayton

    Introduction The mining industry has long been associated with a high incidence of low back disorders and pain (Klein et al. 1984, Leigh and Sheetz 1989, Brinckmann et al. 1998). It is believed th

    Jan 1, 2007

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • ISEE
    Synergy of Seismic, Acoustic and Video Signals in Blast Analysis

    By Brian W. Stump, David P. Anderson, John Wiegand

    Mining explosions are designed for a variety of purposes including the fragmentation and movement of materials. The blast design is dependent on the particular application intended and the material pr

    Jan 1, 1997

  • SME
    Preventive Maintenance Policy Supported By A Quality Control Chart And Kolmogorov-Smirnov Tests: Emet Colemanite Mineral Processing Plant, Turkey

    By S. Yerel

    In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule

    Jan 1, 2007

  • CIM
    Nickel Rim South -Xstrata?s First New Mine in Sudbury in 20 Years

    By Rick Collins

    Presentation Agenda 1.Sudbury Basin 2.Diamond Drilling 3.Planned Production 4.Safety 5.Timeline 6.Sustainable Development 7.Scope Elements 8.Progress 9.Delivery Approach 10.Owners and EPCM

    May 1, 2009

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • TMS
    Microstructural characterization of Brazilian Iron ores for quality control in iron making ? a geometallurgical approach

    By Varadarajan Seshadri

    Geometallurgical characterization of iron ore which is a raw material for Iron making as in the case of charcoal blast furnaces operating in Brazil or for production of agglomerates such as iron

    Jan 1, 2006