Search Documents

  • CIM
    Metallurgy of the Mt. Milligan Porphyry Gold/Copper Deposit

    By A. B. Cron, R. MacPhail, L. Melis, K. Armstong

    "Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1

    Jan 1, 1991

  • AUSIMM
    Geology of the Southern Finisterre Range: A case history of Modern Arc-Continent Collision

    By Silver EA

    The Finisterre Range on the north coast of Papua New Guinea is the uplifted forearc riagio.n. of a modern arc-continent collision. The core of the range is composed of the P- nisterre Volcanics, a

    Jan 1, 1991

  • SME
    A Tunnel Boring Machine at the South Pole

    By Michael R. Walsh, John H. Wright, Eivind B. Jensen

    A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo

    Jan 1, 2001

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • SAIMM
    Bias testing of cross-belt samplers - Synopsis

    By G. Lyman

    The cross-belt sampler is a device that is very widely used even though it has not been ratified by the Standards associations. This paper is concerned with the bias testing of two cross-belt sampler

    Jan 1, 2010

  • AUSIMM
    Cadmium in the Broken Hill Lode

    Cadmium occurs in the Broken Hill Lode essentially as a camouflaged element, substituting diadochically for zinc in the sphalerite.Analyses of a series of zinc concentrate flotation products, prepared

    Jan 1, 1955

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • SME
    Terex Trucks Operate at Coal Reclamation Project

    Mine Terex articulated dump trucks are working on a large restoration project of an abandoned open cast coal site in Blacklaw, central Scotland. The project is part of the construction of a 42-turbin

    Jan 1, 2005

  • SME
    Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration

    By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat

    Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst

  • SME
    Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration (7cabb148-285f-4ad0-9583-a6d360323de4)

    By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat

    Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst

  • SME
    Caterpillar 5090B Offers Higher Loading Capacity

    By Tim O’Neil

    Caterpillar has introduced its 5090B front shovel, to work with 40 to 70 st (36 to 63 t) trucks. The new unit replaces Cat’s 5080 hydraulic excavator. The 5090B offers more engine horsepower, higher

    Jan 1, 2003

  • AUSIMM
    Calibration of a Frantz Isodynamic Separator and its Application to Mineral Seperation

    A calibration of the Frantz isodynamic magnetic separator relates the current in the electromagnet and the transverse slope of the chute to the specific susceptibility at which separation is being eff

    Jan 1, 1957

  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • AUSIMM
    The Occurence of Bismuth in the Lachlan Fold Belt in New South Wales

    Although bismuth mineralization is spread widely through the Lachlan Fold Belt in New South Wales, broad grouping of the various deposits can be effected on the basis of geographical and geological (a

    Jan 1, 1973

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • NIOSH
    Numerical Analysis Of The Impact Of Longwall Panel Width On Methane Emissions And Performance Of Gob Gas Ventholes

    By C. O. Karacan, S. J. Schatzel, W. P. Diamond

    In coal mining, longwall mining is a preferred method to maximize production by extracting large blocks of coal that have been outlined with a set of development entries. In U.S. mines, longwall pane

  • SME
    Upper Rouge Tunnel CSO Control

    By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour

    To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage

    Jan 1, 2007

  • SME
    Caterpillar’s MINExpo Exhibit Includes a Day at Tinaja Hills

    By Steve Kral

    MINExpo INTERNATIONL 2000 was a good place for companies to introduce new products, technologies and services to the mining industry. Caterpillar took that a step further. The company hosted a one-da

    Jan 1, 2000

  • SME
    Guidance for Partial Face Excavation Machines

    By Jochen Belz, Allan Henneker, Nod Clarke-Hackston

    For the construction of tunnels and other underground structures, extraction of the exact amount of material is of paramount importance both economically and for engineering purposes. In the Sequentia

    Jan 1, 2007

  • AUSIMM
    Mining and the New Environment

    Review of the mining legislation in New Zealand has coincided with a number of radical changes. These include a redirection of economic management towards a more open and competitive economy; major re

    Jan 1, 1987