Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The State of Art in Environmentally Sustainable Nickel Smelting: Boliden Harjavalta Nickel SmelterBy P. Pyykkö, E. Peuraniemi, J. Järvi, P. V. Latostenmaa, V. Törölä, S. Junnikkala
"Nickel concentrate smelting started in Harjavalta in 1959. First, flash smelting - Peirce-Smith converting route was applied, and the high-grade converter matte was further refined to nickel cathodes
Jan 1, 2014
-
An international review of the use and testing of the wire ropes used in mine hoistingBy J. E. Udd
"In early 2000, CANMET-MMSL was engaged by the Ontario Ministry of Labour (OMOL) to conduct an international study of the practices, in several key mining jurisdictions, of determining the criteria th
Jan 1, 2004
-
Sustainable Geothermal Energy Recovery from MinesBy Charlie Graham, Helen Shang, Ashley Scott, Andrew Hall
"Approaches to Energy Recovery• Upgrading for electricity generation - steam turbines• Direct extraction- process improvement or space heating- support medium for animal or plant growth– fish or micro
Jan 1, 2012
-
An Analysis of the Performance of a Ball Mill Rake Classifier Comminution CircuitAn extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope
Jan 1, 1967
-
IC 7659 Petroleum And Natural Gas Research Program Bureau Of Mines, Fiscal Year 1952 ? Summary And IntroductionBy R. A. Cattell
The conditions under which the researches of the Bureau of Mines on petroleum and natural gas were conducted in 1952 were little changed from those indicated in the last report,2/ which dealt with act
Jan 1, 1953
-
Research In Pyrometallurgy At The University Of Pretoria, 1980-2005Keywords: Pyrometallurgy, Pretoria University Substantial research in pyrometallurgy at the University of Pretoria started in 1980 with the appointment of Rian Dippenaar to the Iscor Chair, a posi
Jan 1, 2006
-
Variations between Tectono-Sedimentary regimes during collision zone evolution: The Markham Suture Zone, Papua New GuineaBy Crook KAW
New sedimentological and biostratigraphic data indicate that the Leron Formation in the Markham Suture Zone, Papua New Guinea (PNG) represented Pleist- ocene alluvial fan-delta deposition in shall
Jan 1, 1991
-
Using integrated GPS, Wireless Communication and Computing Technologies to Lower Mining CostsBy Javier A. Llano
GPS, wireless communications and on-board and off-board computing capabilities provide today’s mining companies with unprecedented process improvement and cost reduction opportunities. All aspects of
Jul 17, 2000
-
Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the DesignBy I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve
The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main
Sep 17, 2014
-
IC 8684 Analyses Of Natural Gases, 1974 ? IntroductionBy B. J. Moore
This publication contains analyses and related source data for 352 natural gas samples from wells and pipelines in 18 States and 5 foreign countries. All of the samples were obtained and analyzed duri
Jan 1, 1975
-
Investigating Total Media WearBy Peter Radziszewski
"Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing
Jan 1, 2001
-
OFR-78-78 Feasibility Study Of Electric Shock PreventionBy Gordon R. Sima
The contract is concerned with feasibility studies, design and fabrication of a group of prototype hand-held test instruments and machine-mounted test instruments for measurement of electrical shock h
Jan 1, 1977
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case HistoryBy Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
List Of Bureau Of Mines Publications And Articles - January 1,1960, To December 31,1964 - With Subject And Author Index ? IntroductionBy Rita D. Sylvester
THE BUREAU OF MINES was established in the public interest to conduct inquiries and scientific and technologic investigations concerning mining and the preparation, treatment, and utilization of miner
Jan 1, 2007
-
Production of Nickel Bearing Pig Iron in Blast Furnace From Chromite OverburdenBy Kumar A, Mishra N. C
For each tonne of chromite ore mined in Sukinda, approximately ten tonnes of fine overburden material is generated. The overburden typically contains about 30 - 60 per cent Fe2O3, 0.3 - 1.1 per cent
Jan 1, 1999
-
Some Thoughts on Calibrating LaModelBy Keith Heasley
In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa
Jan 1, 2008
-
Proceedings of the Forty-Third Regular Meeting of the Rocky Mountain Coal Mining Institute Held at Salt Lake City, Utah May 26, 27, 28, 1947 ? Morning Session ? Monday, May 26, 1947MR. MANLEY: Gentlemen, I have been asked to open this meeting in the absence of Mr. Shields. the President of the Rocky Mountain Coal Mining Institute, who is away on other business. We have here from
Jan 1, 1947
-
Repair Of Deep Foundations - SummaryBy Dennis W. Boehm
The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current
Jan 1, 1999
-
Moon Creek Reclamation Project Creative Solutions For An Historic Mine SiteBy B. A. Ridolfi, S. M. Alvarez
The Moon Creek Reclamation Project provides a case study in the development of creative cleanup solutions for an abandoned lead and zinc mine and mill site located in northern Idaho. Innovative design
Jan 1, 1999
-
Factors Determining Lead Yields During Electrolysis of PbS Dissolved in Molten ChloridesA study of the electrolysis of PbS in molten PbCl2 showed cathode efficiencies which increased with current density at fixed sulphide concentrations, and decreased with increasing sulphide concentrati
Jan 1, 1973