Search Documents

  • NIOSH
    RI 7120 Hydraulic Mining Of Anthracite - Analysis Of Operating Variables

    By Wilbert T. Malenka

    A modified factorial experiment was used to determine the effect of operating factors in hydraulic mining of anthracite. Seven basic factors at various levels were considered. The significant factors

    Jan 1, 1968

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • NIOSH
    Analysis Of Practical Ground Control Issues In Highwall Mining

    By R. Karl Zipf, Suresh Bhatt

    Highwall mining is an important coal mining method. It appears that upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production.

  • CIM
    Metallurgy of the Mt. Milligan Porphyry Gold/Copper Deposit

    By A. B. Cron, R. MacPhail, L. Melis, K. Armstong

    "Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1

    Jan 1, 1991

  • SAIMM
    Investigating Entrainment Levels in Lumwana and Kansanshi Ores using the Froth Stability and Water Recovery Methods

    By L. K. Witika, J. H. Masinja

    "Investigations of flotation characteristics of Lumwana and Kansanshi ores using formulated frothers were carried out. Of the six frothers tested, two came from the alcohol family, two from the glycol

    Jan 1, 2015

  • SME
    124,000 Attend ConExpo-Con/Agg ’99 in Las Vegas

    By Steve Kral

    More than 124,000 people involved in the mining and construction industries throughout the world poured into Las Vegas, NV in March for ConExpo-Con/Agg ’99. Show organizers said this triennial exhi

    Jan 1, 1999

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • SME
    A Tunnel Boring Machine at the South Pole

    By Michael R. Walsh, John H. Wright, Eivind B. Jensen

    A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo

    Jan 1, 2001

  • CIM
    Industrial Relationship

    By Selwyn G. Blaylock

    There is no more important problem today than industrial relationship, and probably none that is receiving more thought. But in these days of Epie and Utopia, one has to be rather careful in speaking

    Jan 1, 1935

  • AUSIMM
    Geology of the Southern Finisterre Range: A case history of Modern Arc-Continent Collision

    By Silver EA

    The Finisterre Range on the north coast of Papua New Guinea is the uplifted forearc riagio.n. of a modern arc-continent collision. The core of the range is composed of the P- nisterre Volcanics, a

    Jan 1, 1991

  • SME
    Square Set Timber in Load-Haul-Dump Stopes at the Bunker Hill Mine, Kellogg, Idaho

    By John Songstead

    INTRODUCTION The Bunker Hill mine, located at Kellogg, ID, in the Coeur d'Alene mining district, has been a major pro¬ducer of lead-zinc-silver ore since 1887. Since its dis¬covery, it has produ

    Jan 1, 1982

  • SAIMM
    Bias testing of cross-belt samplers - Synopsis

    By G. Lyman

    The cross-belt sampler is a device that is very widely used even though it has not been ratified by the Standards associations. This paper is concerned with the bias testing of two cross-belt sampler

    Jan 1, 2010

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • AUSIMM
    Cadmium in the Broken Hill Lode

    Cadmium occurs in the Broken Hill Lode essentially as a camouflaged element, substituting diadochically for zinc in the sphalerite.Analyses of a series of zinc concentrate flotation products, prepared

    Jan 1, 1955

  • SME
    Caterpillar 5090B Offers Higher Loading Capacity

    By Tim O’Neil

    Caterpillar has introduced its 5090B front shovel, to work with 40 to 70 st (36 to 63 t) trucks. The new unit replaces Cat’s 5080 hydraulic excavator. The 5090B offers more engine horsepower, higher

    Jan 1, 2003

  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • AUSIMM
    Calibration of a Frantz Isodynamic Separator and its Application to Mineral Seperation

    A calibration of the Frantz isodynamic magnetic separator relates the current in the electromagnet and the transverse slope of the chute to the specific susceptibility at which separation is being eff

    Jan 1, 1957

  • SME
    Terex Trucks Operate at Coal Reclamation Project

    Mine Terex articulated dump trucks are working on a large restoration project of an abandoned open cast coal site in Blacklaw, central Scotland. The project is part of the construction of a 42-turbin

    Jan 1, 2005

  • SME
    Examining Trends in Individual Risk Factors: Organizational Approaches to Emergency Management

    By M. E. Ryan, C. L. Hoebbel, E. J. Haas

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005