Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Analysis of Panel Stability for Post-Mining Slurry Injection

    By Tim Ross

    Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces

    Jan 1, 1998

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    The Design of Room and Pillar Mining Systems in the UK

    By Graham Daws

    State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R

    Jan 1, 1998

  • SME-ICGCM
    A New Rockbolt Axial Load Measuring Device

    By Hani Mitri

    A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a

    Jan 1, 2001

  • SME-ICGCM
    A New Rock Mass Failure Criteria Based On Rate Of Movement

    By Hamid Maleki

    A new failure criteria is proposed for assessment of roof stability in underground sedimentary rocks. Unlike other stability assessment techniques, this method is simple and practical, having improved

    Jan 1, 1990

  • SME-ICGCM
    Roof Bolt Response To Shear Stress: Laboratory Analysis (01deebbf-0c9c-422b-b7e0-1ccfd8e161d8)

    By Ed Mchugh

    Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co

    Jan 1, 1999

  • SME-ICGCM
    Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock Mine

    By Chris Pritchard

    Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun

    Jan 1, 1999

  • SME-ICGCM
    Massive Pillar Failure--Two Case Studies

    By David H. Tang

    Similar massive pillar failures were observed in two underground coal mines with different configurations of mine workings and overburden depths. Finite element models were used to analyze the causes

    Jan 1, 1984

  • SME-ICGCM
    A Novel System For Automatic Installation Of Cement Grouted Roof Bolts

    By A. Mahyera

    BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual

    Jan 1, 1984

  • SME-ICGCM
    A Case Study of Bolt Performance in a Two-entry Gateroad

    By Stephen P. Signer

    This paper presents the results of a case study conducted in a two-entry gateroad in a coal mine where excessive roof deformation and bolt loading resulted in failure of many roof supports. The instru

    Jan 1, 1998

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    Innovative Rock Reinforcement Hardware (a5497235-47bd-4c2e-8654-b4e79927169e)

    By D. F. Howarth

    Two innovative ground reinforcement products have been developed for use in the mining industry. One of these products is a high strength polyethylene (HOPE) bar for use as a rib bolt in underground c

    Jan 1, 1992

  • SME-ICGCM
    Jointing Effects On Pillar Strength

    By Gabriel Esterhuizen

    When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn

    Jan 1, 2000

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • SME-ICGCM
    A System to Provide Early Warning on Impending Goaf

    By Gift Makusha

    Total extraction mining of coal is being undertaken on a small scale by Anglo Coal South Africa. Longwall mining has been done in the group at New Denmark colliery since the 80s and recently the compa

    Jan 1, 2005

  • SME-ICGCM
    Three-Dimensional Analysis Of Mine Dump Point Stability

    By Radoslaw L. Michalowski

    The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li

    Jan 1, 1990

  • SME-ICGCM
    Abutment Pillar "Notching" Improves Abutment Tunnel Roof Conditions At The Cayuga Rock Salt Mine

    By David B. Plumeau

    The Cayuga Mine, a deep rock salt mining, operation, changed from a standard room and pillar mine design to a yielding pillar/pressure arch design five years ago. In general the roof conditions improv

    Jan 1, 1981

  • SME-ICGCM
    Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face

    By S. Y. Liu

    Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t

    Jan 1, 1990

  • SME-ICGCM
    Surface Movement of Super-wide Longwall Panels Using Top-coal Caving Method

    By Cao Shenggen

    Experiences in the developed countries have shown that continuous increase of panel width (or face length) is one of the major technical trends for high production high efficiency mines. Increasing th

    Jan 1, 2003