Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Safe, Efficient, and Cost-Effective Support of Longwall Cut through Entries

    By John R. Poland, Benjamin Mirabile

    "There are significant ground support hazards to both personnel and equipment when longwall equipment must mine through cross-panel entries. Backfilling support strategies are often cost prohibitive.

    Jan 1, 2016

  • SME-ICGCM
    Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation

    By Dakota Faulkner

    Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract

    Jan 1, 2014

  • SME-ICGCM
    Stress Measurements for Safety Decisions in Longwall Coal (4b24fd83-539f-4e52-8928-06b50544afce)

    By Eric Zahl

    Researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health, Spokane, WA, have collaborated with three Western longwall coal mines in an ongoing effort

    Jan 1, 2002

  • SME-ICGCM
    Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata

    By Ashok Kumar, Rajendra Singh, Arun Kr. Singh

    "A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un

    Jan 1, 2018

  • SME-ICGCM
    Roof Span Design for Underground Stone Mines

    By Essie Esterhuizen, John Ellenberger, Dennis Dolinar

    "Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us

    Jan 1, 2010

  • SME-ICGCM
    Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case Histories

    By Michael Gauna, Christopher Mark

    "Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted

    Jan 1, 2016

  • SME-ICGCM
    Field Measurements of Overburden Strata Deformation Response to Longwall Mining

    By Xinzhi (Thomas) Du

    "In order to monitor the overburden strata deformation over a longwall mining area in the Pittsburgh Coal Seam, three boreholes were drilled across the longwall panel. Each borehole employed multiple-

    Jan 1, 2018

  • SME-ICGCM
    Research on Abutment Pressure Distribution for Longwall Face Mining Through Abandoned Gateroads

    By Peng Cao, Jimin Su, Yang Li

    "Abutment pressure distribution is different when a longwall panel is passing through the abandoned gateroads in a damaged coal seam. According to the geological conditon of panel E13103 in Cuijiazhai

    Jan 1, 2018

  • SME-ICGCM
    Development Process for a Greater Capacity Propsetter® System

    By Christopher J. Brown

    "Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed

    Jan 1, 2017

  • SME-ICGCM
    Development of CAN Manipulator

    By Brian E. Perrine

    Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting

    Jan 1, 2013

  • SME-ICGCM
    3D Modelling of Mine Backfill

    By Muhammad Zaka Emad, Rangzeb Goraya, Muhammad Usman Khan

    "Numerical modeling has been used extensively to assess the stability of surface and underground mines. Tabular, steeply dipping ore bodies are generally mined out by open stoping methods with delayed

    Jan 1, 2017

  • SME-ICGCM
    Ground Control Aspects of a Successful Underground Coal Mine Trial in Weak Strata in Indonesia

    By Andrew Lewis, Amarit Nitaramorn, Alexander Garcia, Peter Altounyan

    "Indonesia is a major coal producer, the vast majority being sourced from opencast operations. Underground production to date has been constrained by unfavorable ground conditions and limited local ex

    Jan 1, 2010

  • SME-ICGCM
    Study on the Height of Fractured Zone inside Overlying Strata under High-Intensity Mining in China

    By Lou Gaozhong, Guo Wenbing, Zhao Gaobo, Wang Shuren

    "The height of a fractured zone due to high-intensity mining (HIM) plays a vital role in the safety analysis of coal mining under bodies of water. This paper described the characteristics of HIM. The

    Jan 1, 2018

  • SME-ICGCM
    Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and Abutment

    By Thierry Lavoie, Mark K. Larson

    "Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement

    Jan 1, 2016

  • SME-ICGCM
    Multi?stage Testing Procedures, Verification, and Results for Strong, Brittle Sandstone

    By Michael Murphy

    A multi-stage triaxial procedure has been developed for the enhanced servo controls and feedback systems at the National Institute for Occupational Safety and Health (NIOSH) rock mechanics laboratory.

    Jan 1, 2014

  • SME-ICGCM
    Application of Thin Spray on Liner (Masterseal) at Longwall T-Junction Sections in German Hard Coal Mines

    By Uwe Wyink, Guenther Thiele, Isabel Gollnick, Klaus Thyrock

    "The application of a thin spray on liner was implemented in longwall T-junction sections in 2009 for the first time. The development of the material and the application is based on a technical cooper

    Jan 1, 2010

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    A Comparison Of Overburden Response Due To Longwall Mining

    By David K. Ingram

    The objective of this U.S. Bureau of Mines (USBM) investigation was to characterize overburden response due to longwall mining. Subsurface strata and surface deformations were monitored at two sites i

    Jan 1, 1994

  • SME-ICGCM
    Computer Modelling And In Situ Instrumentation Techniques: A Quantitative Approach To Scientific Mine Design

    By Bruce H. Gardner

    This paper describes the application procedure of the Stress Control mine design method. This procedure has evolved over the past 20 years of the practice of this Method in trona, potash, salt, and, m

    Jan 1, 1984

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013