Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft Rock

    By Yukika Miyashita, Takahiro Inoue, Kenji Namikawa, Masashi Matsumoto, Junichi Koseki, Yoshihiro Terashima

    "In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-an

    Jan 1, 2016

  • SME
    Optimization of Fine Coal Cleaning

    By Dale W. Norris, John A. L. Campbell

    INTRODUCTION Optimization, as measured by productivity gains, is being achieved in our nation's preparation plants principally by automation, economy of scale, and reducing maintenance. Incre

    Jan 1, 1988

  • SME
    In Situ Rock Stress Determination: Techniques and Applications

    By James R. Aggson, Verne E. Hooker

    GENERAL CONSIDERATIONS The design of a mine or any underground opening in rock is similar to the design of any other structure, such as a building or a bridge, in one important way. This similarity

    Jan 1, 1982

  • SME
    Environmental Liability Of Lenders And Investors

    By M. Murphy

    The multibillion dollar cost of cleaning up thousands of environmentally contaminated sites across the country created by decades of inadequate disposal of hazardous waste has led to a search for "dee

    Jan 1, 1988

  • SME
    Design for the Bolted and Gasketed Segment Lining for the Bypass Tunnel with High Head Conditions

    By Paolo M. Brion, Z. Bade Sozer

    "The Bypass Tunnel has high head conditions ranging from a minimum of 600 feet (183 m) under the Hudson River to a maximum of 875 feet (267 m) on the west side. The ground cover ranges from 425 feet t

    Jan 1, 2016

  • SME
    Topographic Reconstruction On Mining Sites: Landscape Stabilization And Erosion Control

    By T. J. Toy

    The topography reconstructed following land disturbance is the foundation for all other reclamation practices. As the manufactured drainage basins, hillslopes, and stream channels approach a steady-st

    Jan 1, 2002

  • SME
    Abrief Techno-economic Assessment Of The Provision Of Oxygen To Bio-oxidation cti On Systems For Refractory Sulpiilde Ores

    By M. T. Errington, P. C. Miller, W. E. Hardwick

    Paper discusses in general terms the techno economic merits of various types of aerated biological reaction systems. The current status of the technology leaves many questions unanswered and hence the

    Jan 1, 1998

  • SME
    CIS: Mining And Change (Pre Print 96-156)

    By P. G. Semple

    For the last four years, the Kilborn Group of Companies (Kilborn) has been involved in several major projects in the CIS. These projects include the Kumtor Project, the Kubaka Gold Project, the Kazgol

    Jan 1, 1996

  • SME
    Discrete-Zone Mixing of Net-Acid-Neutralizing and Net-Acid- Generating Rock: Avoiding the Argument over Appropriate Ratios

    By Nora M. Hutt, Kevin A. Morin

    There is currently some pessimism over mixing of net-acid-neutralizing (NAN) and net-acid-generating (NAG) rock to obtain indefinite near-neutral seepage from mined-rock piles. This is due in large pa

    Jan 1, 2000

  • SME
    Study Of Shear-Flocculation Of Silica

    By D. R. Spears, D. A. Stanley

    The US Bureau of Mines investigated the fundamental aspects of shear-flocculation using a rapid, in-situ particle size analyzer. Silica was stirred in the presence of an aliphatic amine to determine t

    Jan 1, 1995

  • SME
    Progress Report Of A Reclaimed Wetland On Phosphate Mined Land In Central Florida

    By J. D. Carson

    A 0.60 km2 (150 acre) wetland was reclaimed by Agrico Mining Company as part of a 1.48 km2 (366 acre) reclamation program in southwest Polk County, Florida approved by the Florida Department of Natura

    Jan 1, 1983

  • SME
    The Nature and Stability of Precipitated Solids From Arsenopyrite Bio-Oxidation Effluents

    By A. N. Islam, C. Simons, M. N. Hughes, J. Barrett

    The effluent from the bio-oxidation of arsenopyrite contains high concentrations of iron(III) and arsenic(V), the pH being in the range 1.0-1.3. The use of lime to increase the pH causes the precipita

    Jan 1, 1991

  • SME
    Design And Performance Verification Of A Booster Fan Installation At The Red Lake Mine

    By L. Sletmoen, P. Rocque, E. DeSouza

    Plans for achieving planned production rates at the Red Lake Mine High Grade Ore Zone required that the mine ventilation system be upgraded. Time constraints required that only a site assessment of th

    Jan 1, 2003

  • SME
    Start Up And Operation Of The Campbell Red Lake Gold Pressure Oxidation Plant

    By J. Frostiak

    The Campbell gold operation of Placer Dome Inc. produces an arsenopyrite-sulphide concentrate which must be treated either by roasting, biooxidation or by pressure oxidation to obtain high gold recove

    Jan 1, 1992

  • SME
    Transactions Volume 340 2016 - SME Transactions 2016

    By Chee S. Theng

    As the 2016 president of the Society for Mining, Metallurgy & Exploration Inc., I am pleased to present the 2016 issue of the Transactions of the Society for Mining, Metallurgy & Exploration Inc., Vol

    Jan 1, 2016

  • SME
    Comparison of Performance of Soil Mixwall and Conventional Bracing System for Station Excavations in Alluvium

    By Timothy P. Smirnoff, Anthony Stirbys, Amanda Elioff

    The construction of the continuing expansion of the Los Angeles Metro System has required the construction of eight new station structures. One contractor proposed, as a construction alternative for

    Jan 1, 1997

  • SME
    Geostatistical Study Of A Stratiform Zn-Pb-Ag Deposit For The Design Of Additional Drillhole Sites, Molai/Greece

    By Th. Petropulos

    The Zn-Ag-Pb mineralization zone near Molai (Greece) was explored by more, than 60 drillholes. Promising results led to the decision of additional drillholes in order to confirm the expected spatial e

    Jan 1, 1989

  • SME
    The Performance Of A Four-Inch Hydrocyclone At Near Rope Conditions And Different Feed Slurry Temperatures

    By Harald F. Solberg

    A preliminary study of the performance of a 4-inch Krebs cyclone at near rope conditions and different feed slurry temperatures was completed. Results suggest that temperature influences the x50c size

    Jan 1, 1981

  • SME
    Extraction of Phosphate Values from Phosphatic Clay Wastes: An Acid-Alcohol Technique

    By G. M. Wilemon, B. J. Scheiner

    The Bureau of Mines conducted investigations on extracting phosphate values from fine-particle wastes generated during the mining and beneficiation of phosphate ore by leaching dried wastes using a H2

    Jan 1, 1989

  • SME
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009