Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • ISEE
    Analysis of Data Collected from Ti/Al Conical Shaped Charge Penetration of Geological Targets

    By Jason Baird, Braden Lusk, Dominique Nolan, Allen Stults

    Conical shaped charges have been used to penetrate rock for many years now. Examinations have been made looking at shaped charge liner geometry, material, and standoff, as well as explosive compositio

    Jan 1, 2012

  • ISEE
    Evaluating the Role of Water Tamping vs Pushing in Explosive Applications

    By Jeremiah Cohn, Rachel L. Bauer, Catherine E. Johnson

    Water is frequently used in explosive applications to increase explosive performance and reduce air overpressure. Water tamping can enhance cutting abilities of shaped charges in demolition and increa

    Jan 26, 2026

  • ISEE
    Application of Rudimentary Signature Hole Analysis

    By Michael Laing

    Blasting regulation and restrictions are tougher today than ever before. When blasting in population centers, strict limitations are often placed on the environmental effects caused by blasting, more

    Jan 1, 2017

  • ISEE
    Flyrock: A Continuing Blast Safety Threat

    By Harry Verakis

    Flyrock is the second leading cause of all blasting related injuries in surface coal, metal and nonmetal mining operations. It is also a primary cause of property damage, monetary losses and “near mis

    Jan 1, 2011

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    Study of Sheet Charge Initiation with Varied Cap Type, Orientation, and Distance

    By C. E. Johnson, R. L. Bauer, E. M. Johnson

    In industry, the strength of a blasting cap is often equated to the type of explosive it can detonate. Comparable cap strength is becoming less important as nearly all caps manufactured today can init

    Feb 6, 2023

  • ISEE
    Electromagnetic Characterization of an Explosives Mixing Site at Blackie, Alberta

    By David G. Paton

    "Electromagnetic surveys were conducted at the BXL Bulk Explosives Limited Mixing Plant andsurrounding area to characterize runoff from the site and possible impacts of salinity. The BXL Plant is loca

    Jan 1, 1999

  • ISEE
    Explosive Operations for Constructing a Tunnel Based PCB Collection System

    By Gerard McAlinden, Daniel Frost, Patrick McAlinden, James McAlinden

    In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installatio

    Jan 1, 2010

  • ISEE
    Limitations of using PPV Damage Models to Predict Rock Mass Damage

    By Jianping Li, Ernesto Villaescusa, Kelly Fleetwood

    During blasting, stress waves propagate through a rock mass, inducing stress and strain changes. This applied deformation affects intact rock, existing discontinuities, mine excavations, and engineere

    Jan 1, 2009

  • ISEE
    A Review of Rock Classification Methods and Applicability to Blast Design

    By Hae-Moon Choi, Sang-Don Lee, Hee Soon Shin, Choon Sunwo, Chang-Ha Ryu, Hyun-Koo Lee

    Building tunnels means dealing with what rock is encountered. Relocation of the site of the underground structure is rarely possible. Tunneling engineers and miners have to cope with the quality of th

    Jan 1, 2004

  • ISEE
    Journal: 100 Years / A TREATISE ON COAL MINES J.H.H. Holmes London, 1816 / New Uses for Explosives E.I. Du Pont De Nemours Powder Company Pamphlet No. 1 January 1909

    By H. Mullani

    We have in southeast Kansas a variety of soils underneath which are a variety of subsoils compressed into what is commonly called “ hard pan.” These soils are of six types, ranging from a clay to a sa

    Jan 1, 2010

  • ISEE
    Flyrock Elimination Program Part 1: Corporate Initiative

    By Scott Scovira

    All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit

    Jan 1, 2012

  • ISEE
    Five Years Experience with the Dynatronic Electronic Firing System

    By Rolf Koenig

    After the Dynatronic firing system was demonstrated for the first time at the SEE conference in Miami in 1987, it was officially approved in Germany at the beginning of 1993. Dynatronic has now been o

    Jan 1, 1998

  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Testing of a New Blasting Mat Constructed Using Rubber Tractor Treads

    By Matthew K. Coy, Paul N. Worsey

    The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea

    Jan 1, 2015

  • ISEE
    Regression Model for Surface Vibrations from Underground Operations

    By Tristan Worsey, Nathan Rouse, Daykin Schnell

    The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li

    Feb 1, 2020

  • ISEE
    A Comprehensive Blast Damage Control Plan for The Missing Link

    By Alvin D. Christmas

    The missing link is a connector between the congested downtown area of Knoxville, Tennessee adjacent to the former World's Fair site, the I_40 I_75, and Western Avenue traffic arteries. This connecter

    Jan 1, 1995

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    Advancing Blast Fragmentation Assessment Using Geotechnical Discontinuity Analysis Within a Unified WipFrag Framework

    By Andrew Palangio, Blessing Taiwo

    Understanding rock mass structural features is essential for optimizing blast design, highwall control, and evaluating post-blast performance in both surface and underground mining operations. This pa

    Jan 26, 2026