Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Mixed Results in Choke Blasting

    By J Paul Tidman, Stephen H. Chung

    One of the requirements in open pit gold mines is to minimise the mixing of ore and waste. Dilution can be reduced by choke blasting and control of the initiating sequencing. The authors have used the

    Jan 1, 1997

  • ISEE
    Development of the Wireless Initiating System Using Microwave Power

    By Masanobu Morita, Koichi Kurokana, Kenji Hashimoto, Yoji Tasaki, Yukio Iida

    "It has been the long desire of blasting engineer to realize the automatization of tunnelblasting to improve the safety and efficiency. As for bore hole drilling, the automatizationhas been achieved b

    Jan 1, 1993

  • ISEE
    Blast Modeling with DMC-BLAST - Open Pit and Underground

    By Dale Preece, Stephen Chung

    The DMC-BLAST (Distinct Motion Code) has been developed for modeling bench blasting to one or two free faces such as choked blasting in surface gold operation and cast blasting in coal mining, respect

    Jan 1, 2000

  • ISEE
    Development and Performance of Liquid Oxygen Explosives

    By Kamal Wadhwa

    Ever since the introduction of Liquid oxygen explosives in India in 1927, these explosives are being extensively used in the various mining industries such as coal, ironore, limestone, bauxite, magnes

    Jan 1, 1989

  • ISEE
    Controlled Blasting Methods for Excavation of Rock and Concrete in Critical Locations

    By Gordon Revey

    In construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blasting, contracto

    Jan 1, 2001

  • ISEE
    Professional Steps in the Blasting Process (3acbd7f6-5d01-4ca3-b044-14c0f9925760)

    By Mark William Withey

    Blasting safety in surface mining is a necessary industrial goal. Proper techniques and disciplines exercised during the blasting process enhance the probability of achieving that goal.

    Jan 1, 1995

  • ISEE
    Emulsions - Viva la Difference

    By Charles G. Wade

    In the ensuing years nitroglycerin-based dynamites will continually be replaced by water-based explosives. Until recently, the choice of a high explosive water-based product was limited to some type o

    Jan 1, 1978

  • ISEE
    Dynamic Photoelastic Experiment on the Fracture Caused by a Blasting

    By Yuji: Wada Ogata, Kunihisa Katsuyama

    It is well known that a compressed stress wave reflects at the free face, it propagates to the backward as a tensile stress wave, and cracks grow when the tensile stress becomes the dynamic tensile st

    Jan 1, 1993

  • ISEE
    Computer Aided Design of Ring Blasts

    By Calvin Konya, Theodore R. Myers, Robert Lundquist

    The design of a single, large mass blast using ring drilling may take two to three months. This time requirement inhibits the evaluation of multiple designs. It also reduces the flexibility to redesig

    Jan 1, 1990

  • ISEE
    The Power of Information using Self-Audits us Safety and Compliance Program Tools

    By Paul Downing

    A major component of an effective blasting company safety program is the self-audit. A self-audit can help reveal hazardous conditions that should be corrected and training needs that should be addres

    Jan 1, 2001

  • ISEE
    Pressure Effects on Density of Small Diameter Explosives

    By R Deshaise, B Mbhanty

    The importance of controlling density of commercial explosives, and the various means to achieve it are described. m e field conditions responsible for density changes during blasting and their effect

    Jan 1, 1989

  • ISEE
    Confronting Underground Workings Near Open Pit Mines

    By Park McLure, Paul Kunze

    Abandoned underground mine workings have been regularly encountered in open pit mining excavations for many years, for the most part without many serious problems resulting. During the last several ye

    Jan 1, 1993

  • ISEE
    Non-Conventional Performance Characterization of Nonel

    By L. Russell Payne

    The use of shock tube in the blasting industry is relatively well characterized and understood within the realms to which it is used. Non-conventional uses of shock tube within the EOD and the Aerospa

    Jan 1, 2008

  • ISEE
    The Scale of Effects in Evaluating Vibration Damage Potential

    By Lewis L. Oriard

    Ground vibrations associated with blasting are generally in a higher frequency range and of shorter duration than those generated by earthquakes, and the intensity scales for earthquakes cannot be app

    Jan 1, 1989

  • ISEE
    Open Pit Blasting in India

    By D D. Garg, D A. Wasson

    Open pit blasting in India uses two types of explosives. First there are bulk explosives for wet and dry holes, and there are packaged explosives. The Indian open pit coal mining is projected to use 1

    Jan 1, 1995

  • ISEE
    Large Hole Rotary Drill Performance (c77e5de0-de67-47fa-9ab6-1a7cb81cfd58)

    By J Lyall Workman, Peter N. Calder

    Large hole rotary drilling is one of the most common methods of producing blastholes in open pit mining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however a

    Jan 1, 1996

  • ISEE
    Fragmentation Measurement for Experimental Blasting in Virginia

    By John A. Franklin, Norbert B. Maerz, D Linn Coursen

    Accurate measurement of blast fragmentation is important in mining and quarrying operations, to monitor blasting and optimize blast design. A new digital photoanalytical method to measure the block si

    Jan 1, 1987

  • ISEE
    From "Powder Monkey" to Certified Explosives Technician: A Position Paper

    By Gregory S. Parker

    The explosives community has seen tremendous technological advances during the past several decades. When this industry was in it's infancy and even past, Powder Monkey's defied the odds by relying on

    Jan 1, 1995

  • ISEE
    Multiple Controls to attenuate damage in Final Pit Walls

    By Daniel Vargas Quispe, Yorhinio León Robles, Marco Jauregui Vargas, Helen Espinoza Bailon, Oshin Quispe Luya

    This project describes the methodology applied during the execution of tests to determine the multiple controls that mitigate damage to the final walls of the pit. The different tests were executed on

    Jan 21, 2025

  • ISEE
    A Review of Airblast-Induced Window Breakage

    By Bruce B. Redpath

    This paper reviews empirical and analytical information about window breakage due to airblast. As is the case with damage to structures caused by ground vibrations, a fixed break/no break threshold is

    Jan 1, 1976