Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill FacilitiesBy Godfrey MacDonald
"The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East
Jan 1, 1997
-
Continuous loading and conveying technology in miningBy Dale Lens, W. S. (Wayne) Cusitar
"The use of continuous loading and conveying technology for mining is currently practiced in relatively few mining environments and, even in these cases, on a non-exclusive basis. For the most part, a
Jan 1, 1987
-
Controlling Process Water Chemistry to Improve the Flotation of High-Iron Phosphate Ores at Agrium – Kapuskasing Phosphate OperationsBy Balakrishnan Nanthakumar, Marek Pawlik, Dennis Grimm
"The anionic flotation of a high-iron phosphate ore from Agrium - Kapuskasing Phosphate Operations was investigated through batch flotation tests in the presence of soda ash. The flotation data were s
Jan 1, 2008
-
Factors Affecting the Dissolution of Gold from Refractory Flotation TailingsBy H. U. Ross
"INTRODUCTION Extensive studies have been carried on pure gold to determine the various factors that affect its dissolution in alkaline cyanide solutions. With the extension of milling to refractory o
Jan 1, 1973
-
Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer ProcessBy Yannis Faitakis, Simon Bergeron
"This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B
Jan 1, 2003
-
A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration ProcessThe construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent
Jan 1, 1979
-
Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree MineBy D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)By P. G. Roden, G. A. Maki, P. J. Fullmann
"In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de
Jan 1, 1986
-
Haile Gold Mine Metallurgy and Flowsheet ReviewBy P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens
"Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se
Jan 1, 2013
-
The Anisotropic Character of Talc Surfaces as Revealed by Streaming Potential Measurements, Atomic Force Microscopy, and Molecular Dynamics SimulationsBy J. Nalaskowski
A study of the interfacial properties of the basal plane and the edge surfaces of talc is described in this paper. The isoelectric point measured at the two different crystallographic planes by the st
Jan 1, 2006
-
The Performance of Mesh, Shotcrete and Membranes for Surface Ground SupportBy E. C. Morton
The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum
May 1, 2009
-
Marked Ball Wear TestingBy G. D. West, J. D. Purdue
"Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea
Jan 1, 1991
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
Paste Backfill Strength Behaviour Using Different Binding Agents and Binder CombinationsBy Philip A. Dirige
This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength
May 1, 2006
-
Pyrrhotite Rejection at Strathcona Mill - DETA/SMBS Plant TrialsBy J. Coffin, R. Multani, C. Deredin
Glencore’s Strathcona Mill has recently evaluated a pyrrhotite depressant combination of diethylenetriamine (DETA) and sodium metabisulfite (SMBS) to improve its overall plant pyrrhotite- pentlandite
Jan 1, 2019
-
Geochemical exploration in areas of shallow till: some case historiesBy A. D. Thomas, V. N. Rampton, S. Paradis, C. F. Gleeson
"A shallow till sampling program was completed on a 1 km grid over the St . George Batholith in southern New Brunswick. The ""B"" soil horizon was analyzed for Cu, Pb, Zn, Ag, Co, Mo, U and Sb and the
Jan 1, 1986
-
Paste Backfill Bulkhead Monitoring ? A Case Study from Inmet?s Cayeli Mine, TurkeyThe stability of paste fill bulkheads forms an integral part of a successful paste fill system. Bulkheads are constructed at the draw points of open stopes to contain paste fill while the initial pour
May 1, 2007
-
Design and Development of an LHD for Narrow-Reef MiningBy Patrick F. R. Murphy
The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a
May 1, 2003
-
Kiena Maintains Up To Date Image with a New Gold MillBy R. Jolicoeur, J. F. Jackson, M. A. Green
"The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in
Jan 1, 1986
-
Frother Analysis: Procedure and Plant Experience (9afbd8b8-3e71-4680-a005-b07f0c7c29ef)By Frank Cappuccitti, James A. Finch, Stéphanie Gélinas
"A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce
Jan 1, 2005