Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hot Deformation Modeling of Functionally Graded Steels

    By Sadough vanini Ali

    Hot deformation behavior of functionally graded steel (FGS) was investigated via conducting hot compression tests at different temperatures and strain rates. Functionally graded steels consist of ferr

    Oct 1, 2011

  • CIM
    Integration of Mine Automation Systems (14a2af3f-2f3a-4e90-8e97-b85389e6d04a)

    By Irving Wigden

    The world is fast becoming information based. Mine companies migrate business infrastructures to be handled electronically. Suppliers move onto the worldwide web. In this ?e-world? successful supplier

    May 1, 2002

  • CIM
    Integration of Mine Automation Systems

    By Irving Wigden

    The world is fast becoming information based. Mine companies migrate business infrastructures to be handled electronically. Suppliers move onto the worldwide web. In this ?e-world? successful supplier

    May 1, 2002

  • CIM
    Geothermal Studies in the Plains region of Western Canada

    By H. A. Gorrell

    Preliminary studies of the potential for the production of warm water (up to perhaps 150°C) have been carried out in the Plains region of Western Canada. Production might be from depths as great as ab

    Jan 1, 1979

  • CIM
    The Fissure Systems of British Columbia

    By Stuart J. Schofield

    Introduction The study of the ore deposits of British Columbia is one of fascinating interest not only from a scientific but also from a commercial standpoint and certain wide problems in connectio

    Jan 1, 1925

  • CIM
    Canada's Offshore Mineral Resources

    "THE OTTAWA BRANCH, CIM, each year holds a symposium on a subject of topical interest. The symposium this year was on Canada's Offshore Mineral Resources, at which papers were presented by: Dr. Donald

    Jan 1, 1969

  • CIM
    CRIRSCO-Russia Protocol 2008 (Multi-Jurisdiction) - Protocol of Intentions between Russia and CRIRSCO

    "In 2008, the Committee for Mineral Reserves and International Reporting Standards (CRIRSCO) and the Russian State Commission on Mineral Reserves (GKZ) entered into an agreement leading towards harmon

    Jan 1, 2003

  • CIM
    Fluid Motion Characteristics With Gas Injection For Copper Electrorefining At High Current Density

    By Y. Hanada

    Electrorefining at higher current density is desirable due to the increase in productivity attained without expanding the plant size. However, increasing the current density in common commercial pract

    Jan 1, 2007

  • CIM
    An overview of R&D in narrow-vein mining at Université Laval

    By C. Bourgoin

    "The limited development and application of new technologies to narrow-vein mining is currently impeding progress in the industry to a point where productivity, working conditions and operating costs

    Jan 1, 1994

  • CIM
    Blast Improvements at the EKATI Fox Pit

    By Dwayne D. Tannant

    The Fox Pit at EKATI Diamond Mine reached a depth of approximately 150 m as of September 2005. The pit is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high

    May 1, 2006

  • CIM
    The Serra Verde Rare Earth Deposit, Goias State, Brazil: Advancing to Production

    By Denilson Coutinho, Euler Soares, Paulo de Tarso, Jordana Ferreira, John R. Goode, Andreas Sprecher, Alexandre Rocha

    The Serra Verde Project is located in the northern part of Goiás state, Brazil, and comprises 49 mineral claims covering an area of 69,814 ha. The Serra Verde deposit is a rare earth element (REE) enr

    Jan 1, 2014

  • CIM
    Computer Simulation of the Early Stages of Blown in a Peirce - Smith Converter

    By G. Plascencia, C. López, J. González, D. Jaramillo, M. A. Barrón

    Air jet and molten matte interaction within a Peirce - Smith converter is analyzed during the first stages of blowing using Computational Fluid Dynamics (CFD), by means of the Large Eddy Simulation an

    Jan 1, 2007

  • CIM
    IFC?s Performance Standards on Social and Environmental Sustainability and the Equator Principles

    By Didier Fohlen

    Three Policy Shifts to enhance IFC?s Accountability ? Comprehensive and dynamic treatment of social, health, safety and environmental risks ?Covers a range of risks encountered by clients in emerg

    May 1, 2006

  • CIM
    Respect for employees: Clarifying expectations and authorities

    "One of the corporate values mentioned by many companies deals with respect for people. This paper discusses one aspect of this value, namely, the need for clarity of accountabilities and authorities.

    Jan 1, 1999

  • CIM
    Back-analysis of the Extreme Squeezing Conditions in the Exploratory Adit to the Lyon-Turin Base Tunnel

    By G. Russo

    During the construction of the S.Martin La Porte access adit, 9m in diameter, extreme squeezing conditions occurred while crossing Carboniferous schistose formations, with diametric convergence up to

    May 1, 2009

  • CIM
    The Future of Mining Engineers (0d0deb0e-e553-4068-9f65-793aefa55daa)

    By T. Patching

    "A GLANCE BACK AT what has happened in the past is often a useful guide to the future, although it should be used mainly to provide a sense of direction rather than a map that must be followed. As a p

    Jan 1, 1972

  • CIM
    Aerial infrared photography used in evaluating peat bogs for Sphagnum moss

    By BARRY BANNATYNE

    Ombrotrophic Sphagnum peat bogs have a characteristic signature on both colour injrared film (750 nm to 3,000 nm response) and Daedalus injrared line-scanner images (thermal infrared 3 to 5 microns an

    Jan 1, 1984

  • CIM
    High Current Density Operation at Los Bronces Electrowinning Plant

    By Gabriel Zarate

    "Los Bronces had two ROM dump leach operations designated Leach I and Leach II. Leach I was commissioned in 1998 and stopped in 2014 due to the mine requirements. Leach II plant, commissioned in early

    Jan 1, 2016

  • CIM
    Chapter III-Continued PART 7. - Sudbury Area - Regional Structure of the Lake Huron-Sudbury Area

    By H. C. Cooke

    "This paper has reference in a general way to the region extending from the north shore of lake Buron to the northern limit of the elliptical-shaped area generally known as the Sudbury Basin, and more

    Jan 1, 1954

  • CIM
    Ventilation strategy and unique air conditioning at Inco Limited

    By J. S. Stachulak

    "IntroductionInco Limited operates nine underground mines on the rim of the Sudbury Basin. These operation s are situated near the city of Sudbury, 589 km west of Montreal, and 363 km north of Toronto

    Jan 1, 1991