Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Is a Koepe Hoist Always a Better Solution

    By R. P. Townsend

    It is a widely accepted "fact" that a Koepe friction hoist is generally the best solution for production hoisting when compared to a double drum hoists. This would appear to be true if one looks at th

    Jan 1, 2011

  • CIM
    Advances in the Use of Polytetrafluoroethylene during Medium Temperature Pressure Oxidation of Chalcopyrite

    "Previous studies on the effect of polytetrafluoroethylene addition during chalcopyrite leaching under conditions similar to those of the CESL process have reportedly resulted in complete leaching of

    Jan 1, 2012

  • CIM
    Automatic Control of a Grinding Circuit as Experienced at East Malartic Mines

    By E. J. Marcotte

    "BRIEF DESCRIPTION OF GRINDING CIRCUITCrushed ore at -5/ 16 in. is delivered by a conveyor system from the crushing plant to two 1250 ton fine ore bins. The ore is transferred from each bin by a 30 in

    Jan 1, 1966

  • CIM
    Coal 2000: Nova Scotia's perspective

    By John J. Laffin

    "Nova Scotia Department of Mines and Energy Throughout the history of Nova Scotia, trends in the production and use of its coal resources have resulted in major impacts on the economy and society of t

    Jan 1, 1982

  • CIM
    Hybrid Loader Project HLTHybrid HLT--270270

    By Pierre Laliberté

    Introduction ??Mine ventilation is a major consumer of power in underground mining, including air heating (winter) and air conditioning (deep mines). ??Any advances, including the development of

    Nov 1, 2011

  • CIM
    Coal-Cutter Chains and Picks

    By O`Donnell. P. J.

    THE modern coal cutter is a highly developed, and to a certain extent a somewhat complicated, machine. The requisite power to cope with conditions as found must be generated by the motor with due rega

    Jan 1, 1936

  • CIM
    The Ungraded-Fibre Mill

    By C. Gordon Saunders

    "The ungraded-fibre mill is located at the mine site and has a rated capacity of 6,600 tons of ore input and 1,200 tons of ung1•aded fib1 •e product per day. Power for operation is obtained from a die

    Jan 1, 1976

  • CIM
    Canadian Copper and its Production

    By C. P. Browning

    Copper, as far as we know, was the first metal used by man, and due to the fact that it occurs in many places in the 'native' state, and also to the ease with which it may be shaped, it has

    Jan 1, 1927

  • CIM
    Open Pit Drilling and Blasting at Craigmont Mines Limited

    By J M. Gibbs

    Craigmont Mines Limited mine 50,000 tons of ore and waste per day from the open pit at Merritt, British Columbia. An electric-powered "down-the-hole" drill, a diesel-powered rotary drill and two elect

    Jan 1, 1965

  • CIM
    Long Hole Blasting Practices in a Narrow Vein Deposit ? Experience from Agnico-Eagle?s Lapa Mine

    In most instances, the preferred mining methods in steeply dipping narrow vein deposits are selective methods such as cut and fill or shrinkage. The main advantage of these methods lies in the higher

    Aug 1, 2013

  • CIM
    Successful First Nation Engagement for Mine Extension: Best Practices from Highland Valley

    By George Meadows

    Consultation and Accommodation Introductions Consultation -Best Practices The Role of Negotiations The HVC Experience Summary / Conclusions The Challenge Meeting legal and policy obligations t

    May 1, 2010

  • CIM
    Failure of Anisotropic Shales under Triaxial Compression and Extension

    By J. Ambrose, R. W. Zimmerman

    "Shales are highly anisotropic in their mechanical behavior. The strength ( ??1) of anisotropic shales depends not only on the magnitude of the other two principal stresses ( ??2, ??3), but also on th

    Jan 1, 2015

  • CIM
    Techno-Economic of an Ice Stope Thermal Storage for Mine Heating and Cooling in Sub-Arctic Climates

    By K. Trapani

    "The study undertaken aims to investigate an ice stope heating and cooling system for its potential to be implemented in sub-arctic mines, as a low carbon alternative to conventional natural gas and r

    Jan 1, 2019

  • CIM
    Use of Local Average Subdivision to Characterize Marine Mineral Reserves —A conceptual framework

    By G. A. Fenton, A. Vervoort, M. Alvarez Grima

    "High-risk underwater mining operations necessitate characterizing spatial heterogeneity and resource uncertainty. Local average subdivision is a method of simulating spatial deposit variability insid

    Jan 1, 2015

  • CIM
    The Iron Ore Situation in Ontario

    By G. W. MacLeod

    The iron ore question in this country has been widely discussed for many years, but only recently has its real significance becoming generally understood. The exhaustion of the old Helen mine, in 1918

    Jan 1, 1924

  • CIM
    The Stratigraphy, Sedimentology and Gold Distribution of the VSS/Beatrix Composite Reef at H.J. Joel Gold Mine, Orange Free State, Goldfield, Republic of South Africa

    By Morris J. Viljoen, David R. Young

    "The zone of economic interest at H.J. Joel Gold Mine is the VS5/Beatrix Composite Reef, a quartz-pebble conglomerate of Archean age. The reef occurs at the base of the Eldorado Formation, Central Ran

    Jan 1, 1994

  • CIM
    Whabouchi?de l?indice historique au gisement de classe mondiale en route vers la production

    By Yves Caron

    Résumédes travaux effectués De septembre 2009 àmai 2011 ? Plus de 21 000 m de forages complétés en avril 2011 et près de 9 000 échantillons ? 2,7 km de décapage, 52 tranchées et 852 m de rainures

    May 1, 2011

  • CIM
    The Geological Setting of the Upper Beaver Mine, Kirkland Lake District, Ontario: A Copper-Gold Deposit in Mafic Volcanic Rocks

    By John H. Morris, R. Gwilym Roberts

    "The Upper Beaver Mine, Kirkland Lake, Ontario, is a copper-gold deposit in mafic flows and sedimentary rocks. The deposit consists of a number of orebodies of two types: copper- and gold-bearing chal

    Jan 1, 1982

  • CIM
    Modernization of Cominco's zinc plant and lead smelter at Trail, British Columbia (10278aa3-742e-4f4e-9e62-6cedf484fe18)

    By C. A. Sutherland

    "Smelting of copper-gold ore from nearby Rossland mines started at Trail in the 1890s. As ore from the Rossland mines became exhausted, lead smelting of hand-sorted galena ore from other British Colum

    Jan 1, 1988

  • CIM
    Principles of Using Microdiamonds for Resource Estimation: 1—The Impact of Mantle and Kimberlite Processes

    By J. J. Ferreira, M. L. Thurston, I. L. Chinn, D. M. Rose

    "Concerns about using microdiamonds for resource estimation have been raised by workers because multiple diamond populations exist in many parts of the mantle source region, small diamonds in kimberli

    Jan 1, 2016