Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sinking of a Circular Air Shaft to No. 12 Colliery at New Waterford, N.S.By W. C. Risley
IN the year 1933, workings at the No. 12 colliery, New Waterford, of the Dominion Coal Company, Limited, had advanced to a point where additional ventilation would soon be required. Furthermore, devel
Jan 1, 1936
-
The Wilberforce Radium OccurrenceBy Hugh S. Spence
This paper deals with an occurrence of radium ore near Wilberforce, Haliburton county, Ontario, upon which development work has recently been undertaken and which seems more likely to prove of commerc
Jan 1, 1930
-
Mineral Waste Resources of CanadaBy R. K. Collings
The annual production of mineral and mineral-based wastes in Canada is conservatively estimated to be 400 million tons. Over 90 per cent of this amount is waste rock or mill tailings from the mining a
Jan 1, 1978
-
In-Situ Resource UtilizationBy Larson. William
What is Lunar In-Situ Resource Utilization (ISRU)? ISRU involves any hardware or operation that harnesses and utilizes ?in-situ? resources to create products and services for robotic and human expl
May 1, 2009
-
Observations and Numerical Back Analysis of an Excavation in the Queenston MudstoneBy M. A. Perras, M. S. Diederichs
"The Niagara Tunnel Project (NTP) is a 10.1 km long water-diversion tunnel in Niagara Falls, Ontario, which was excavated by a 14.4 m diameter tunnel boring machine. The excavated rock types included
Jan 1, 2015
-
Design, Construction, and Commissioning of Air Separation Units in Remote LocationsBy K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko
In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located
Jan 1, 2014
-
From ore to ferroalloy at Niobec Mine: The role of the geologist in ISO 9002 implementationBy Eddy Dénommé, Deni Villeneuve
"Niobec mine, a producer of pyrochlore concentrates since 1976, became a producer of ferroniobium in 1994 and achieved accreditation to the ISO 9002 standard in 1995. The goal of ISO 9002 is to ensure
Jan 1, 1997
-
Drill monitoring for geological mine planning in the Viscaria copper mine, SwedenBy Håkan Schunnesson, Kirsten Holme
"When mining high grade, narrow ore bodies, the mining method often implies a very detailed knowledge of the ore contacts to avoid unacceptable ore loss and waste rock dilution. During the past decade
Jan 1, 1997
-
Management Innovations In The Processes At Cerro Verde MineBy G. V. Fernandez
Sociedad Minera Cerro Verde S.A.A leaches secondary copper sulfides. In recent years, the mine has introduced innovations that have improved the management of mineral crushing, agglomeration, curing,
Jan 1, 2007
-
Slag Fuming Process Intensification at Trail OperationsBy K. J. Heale, G. G. Richards, D. J. Rioux, R. L. Stephens
Slag fuming has remained a key process for the recovery of Zn, Pb, and minor elements in the integrated flow sheet at Teck Cominco's Trail Operations for more than 75 years. Since the start-up of
Jan 1, 2008
-
The Future is Open - On-Equipment Computing at TeckBy Peter Cunningham
Teck Facts and Figures ? Employ more than 14,000 around the world, includes: ? Over 8,600 in Canada (close to 7,800 in British Columbia) ? Close to 2,000 in Chile ? Over 2,700 in Peru ? Approxima
Aug 1, 2013
-
Development of a copper arsenate process for Inco's Manitoba DivisionBy J. Budac, E. Krause, C. L. Stewart, D. Wrana, S. W. Laundry
"As part of an over-all arsenic management strategy, Inco has developed a novel process that converts a by-product high moisture copper/arsenic sulphide precipitate into a crystalline copper arsenate
Jan 1, 1995
-
Concentrate Leach Plant Startup, Operation and Optimization at the Phelps Dodge Bagdad Mine in ArizonaBy John C. Wilmot, Robert E. Brewer, Royce J. Smith
In March 2003, Phelps Dodge started up an innovative pressure leach facility for processing copper concentrates at the Bagdad mine in Arizona. This paper describes the development of the concentrate l
Jan 1, 2004
-
Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce CostsMining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins
May 1, 2013
-
Complex Copper Pyrometallurgy Challenges and Opportunities - Integrated Experimental Phase Equilibria and Thermodynamic Modelling Research and ImplementationBy T. Hidayat, D. Shishin, V. Prostakova, M. Shevchenko
The chemical compositions of copper feed streams are becoming increasingly complex following the growing demand for metals and corresponding shortages of primary sources. The optimisation of process c
Jan 1, 2019
-
Development Methods and Equipment at Lake Shore Mines, LimitedBy G. J. Birnie
Introduction The preparation of the following paper has been undertaken in the belief that a description of the development methods and equipment used at Lake Shore, at the present time, will prove
Jan 1, 1950
-
Design of the AGA Brasil Refractory Gold Pressure Oxidation PlantBy I. Masters, K. Buban, M. Faris, M. Antonio, M. Collins
"AngloGold Ashanti Brasil, with assistance from Sherritt International Corporation, has recently commissioned a new autoclave for the pressure oxidation of refractory gold feeds at their Corrego do Sí
Jan 1, 2012
-
Recovery of Zinc, Manganese and Lead from Pyrometallurgical Sludge by Hydrometallurgical ProcessingBy J. -F. Blais, M. -O. Simonnot, P. Charbonnier, J. Mocellin, Université de Lorraine INRA, G. Mercier
"Huge amounts of air pollution scrubber sludge have been generated during ferromanganese production using blast furnace. These residues have been historically deposited in ponds near steel making plan
Jan 1, 2016
-
The emission control system on the Volvo BM 861 U underground truckBy J. P. Mogan, E. D. Dainty, K. Katsuyama
"The Volvo BM 861 U articulated truck is one of the few underground diesel units manufactured by an organization which shares the same corporate roof as the engine manufacturer. As a consequence, the
Jan 1, 1981
-
Industrial Development in British Columbia Past, Present, and FutureBy J. C. Ingram
IT SEEMS particularly appropriate that, in celebrating its Diamond Anniversary, the Canadian Institute of Mining and Metalturgy chose our Province of British Columbia as its locale in this, our own Ce
Jan 1, 1958