Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Simple Gravity-Recoverable Gold TestBy Jason Clarke, André R. Laplante
"The gravity-recoverable gold (GRG) ore characterization test was developed 15 years ago and has been applied to hundreds of ore samples. The test accurately determines the size distribution of GRG, a
Jan 1, 2006
-
Adequacy of World Mineral SupplyBy Leonard L. Fischman
It is important to define "adequacy," and the most useful definition is a continuing availability of mineral materials under cost and other conditions which imply no significant burden on the achievem
Jan 1, 1977
-
How to Achieve Operational Reliability in the Natural Resources and Petroleum IndustriesBy Emilio Giuseppe Sarno Severi
Mining and Petroleum Similar Industries ?Asset Intensive ?Exposed to market volatility ?Highly Risky Operations ?Scarcity of Experienced and Trained resources ?Operating in diverse countries wi
Nov 1, 2011
-
Mine Ventilation CalculationsBy W. J. Tough
THIS paper offers examples of some of the typical calculations which occur in the ventilation of metal mines. The fi.rst section of the paper discusses the problems associated with natural-draft press
Jan 1, 1942
-
Optimising Stope Sequences for Long Term Mine PlanningBy André van Wageningen
Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos
May 1, 2004
-
Falconbridge Limited - Strathcona MillBy Peter Wells, Gordon Marrs, Dominic Fragomeni, Warren Holmes, Daryl Macnamara
"LocationThe Strathcona mill ofFalconbridge Limited is located in Onaping, Ontario, 50 km northwest of Sudbury.GeneralOre from the Falconbridge mines in the Sudbury Basin (Strathcona, Fraser, Onaping,
Jan 1, 2000
-
Tungsten Carbide Drilling at the Sullivan MineBy J. W. Reynolds
Introduction The Sullivan mine, at Kimberley, B.C., is the principal source of ore for the Consolidated Mining and Smelting Company of Canada, Limited. Current production amounts to about 2,500,000 t
Jan 1, 1951
-
Improving Machinery Reliability Through Condition Based MaintenanceBy Alan D. Akerman
This paper describes the significant advantages and improvements in operational availability, reduced breakdowns, and overall cost reductions that can be achieved through the application of a Reliabil
May 1, 2002
-
A Historical Survey of the Methods Used to Reduce the Size of Ore at the Holliger MineBy I. M. Gordon, J. Blackshaw
"Run-of-mine ore is reduced to 4 per cent on 4 mesh (3/ 16 inch), using four stages of dry crushing. The mill feed is then reduced to 2 per cent on 48 mesh and 60 per cent through 200 mesh, using one
Jan 1, 1965
-
Optimizing Performance in Heavy Equipment TeleoperationBy Jean-François Lapointe
Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi
May 1, 2001
-
The post-failure characteristics of rockBy T. G. Joseph, K. Barron
A strain-softening constitutive relationship is introduced that describes the post-failure stress-strain curve for rock regardless of whether the rock is intact or broken. The core of this relationshi
Jan 1, 2003
-
British Columbia Environmental Assessment ActPRESENTATION PURPOSE ? Provide an overview of BC?s Environmental Assessment Actand environmental assessment process ? Identify key issues influencing environmental assessments in BC ENVIRONMENTAL A
May 1, 2006
-
Discounted cash flow analysis — Methodology and discount ratesBy L. D. Smith
"This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of
Jan 1, 2002
-
Industrial and Fuel Minerals of ManitobaBy G. M. Hutt
Introduction The major development of industrial minerals in Manitoba has been in building materials. 'The building-stone industry is developed far beyond the needs of the Province, and the well
Jan 1, 1934
-
Molybdenite Flotation by Controlling Pulp PotentialBy M. Kolahdoozan, H. Noori
"Molybdenite flotation at the Sarcheshmeh Copper Complex has been studied as a function of pulp potential controlled using two types of sodium sulfide (mineral and chemical origin). Air and either pla
Jan 1, 2006
-
Rotating equipment reliability for surface operation. Part II: Oil analysis in a mineBy D. Prince, G. Nollet
"Since 1994, Aur Ressources has operated Louvicourt mine, a zinc and copper mine close to Val d’Or, at a rate of 4300 t/d. Ever since the start-up of the plant, management has encouraged innovative ap
Jan 1, 2003
-
Re-entry Protocols for Seismically Active Mines: An UpdateBy J. A. Vallejos
Re-entry protocols are a tactical approach for controlling risk after blasts or large events in seismically active mines. Based on the results of a survey on 18 seismically active mines, mostly in Ont
May 1, 2009
-
Metal Mine Ventilation (5a66f77a-e32a-4b69-828a-81ebc3b32b9e)By D. Harrington
Ventilation of underground workings consists in establishment of such control of air currents that the underground workers may work in safety, with maximum comfort and efficiency, and without impairme
Jan 1, 1933
-
British Columbia Aboriginal Mine Training AssociationWhat is the BC AMTA? ?What is an ASEP? ?Who are the partners? ?Critical Success Factors ?Questions/Answers Aboriginal Skills and Employment Program (ASEP) ?A collaborative partnership of industr
May 1, 2010
-
Using Rock Physics for Constructing Synthetic Sonic LogsBy I. O. Ojala
Detailed knowledge of velocity-depth trends is essential for constructing well-to seismic ties, determining background velocity and generating synthetic seismic traces for interpreting seismic amplitu
May 1, 2009