Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Computer Control Strategy

    By R. J. McLeod

    "CONTROL STRATEGYThe Lake Dufault Division of Falconbridge Copper Limited has been concentrating a complex copper zinc ore since late 1964. An ARL X-ray on stream analyzer was installed in 1966 for pr

    Jan 1, 1973

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    Visualization of Fine Bubbles and Their Role in Fine Particle Flotation

    By Wei Sun, Jaewon Choung, Zhenghe Xu, Zhangming Cui

    "High intensity conditioning has been demonstrated in a number of cases to enhance fine particle flotation. The improvement could be attributed to the enhanced formation of particle aggregates. Howeve

    Jan 1, 2006

  • CIM
    Gravity Recoverable Gold and the Mineral Liberation Analyser

    By Philip J. Guerney, S. O’ Leary, André R. Laplante

    "Concentration of dense mineral phases (s.g. greater than 7) for characterisation of individual particles and mineral grains by electron microscopy is a well established technique for the detection an

    Jan 1, 2003

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    The Use of Radiotracers to Locate and Eliminate Gold Traps from Grinding Circuits in Gold and Base Metal Mines

    By Randy Clarkson

    "Free gold particles occur in many base metal and precious metal mines throughout the world. Occasionally mine operators are unaware of the presence of free gold particles in their ores because they h

    Jan 1, 2003

  • CIM
    Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining Sustainability

    By Zetti Gavelán

    Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty

    May 1, 2010

  • CIM
    Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project

    By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton

    "Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub

    Jan 1, 2013

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    Arsenic Hydrometallurgy; Fundamentals, Technology and Applications

    By K. D. Mills, R. G. Robins, C. G. Anderson, L. G. Twidwell

    Arsenic is a metalloid which has attracted great environmental scrutiny in recent decades. Moreover, its control and deportment is becoming increasingly important in the metallurgical processing of mo

    Jan 1, 2014

  • CIM
    An agent-based framework for open pit mine planning

    By K. Awuah-Offei

    Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in

    Jan 1, 2008

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    Improvement of Elements of Safety Culture in KGHM Glogów Copper Smelter

    By Gabka T., R. E. Gregorczyk

    Work to improve employees' behavior in Głogów Copper Smelter began in 2009. It has been noted that over 90% of accidents at work are attributable to human reasons. At that time, a series of external w

    Jan 1, 2019

  • CIM
    Fracture Mechanics Numerical Modeling ? Potential and Examples of Applications in Rock Engineering

    By T. Backers

    In fracture mechanics modeling the rock mass is seen as the combination of rock material and fractures, which are evident on different scales. The activation and propagation of fractures dominates the

    May 1, 2009

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003